841
Views
36
CrossRef citations to date
0
Altmetric
Original Articles

The use of a multiple attribute decision-making method and value stream mapping in solving the pacemaker location problem

&
Pages 2793-2817 | Received 23 Sep 2009, Accepted 15 Mar 2010, Published online: 18 May 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Ainhoa Goienetxea Uriarte, Amos H.C. Ng & Matías Urenda Moris. (2020) Bringing together Lean and simulation: a comprehensive review. International Journal of Production Research 58:1, pages 87-117.
Read now
Alexander Sunk, Peter Kuhlang, Thomas Edtmayr & Wilfried Sihn. (2017) Developments of traditional value stream mapping to enhance personal and organisational system and methods competencies. International Journal of Production Research 55:13, pages 3732-3746.
Read now
Giuliano Almeida Marodin & Tarcisio Abreu Saurin. (2015) Managing barriers to lean production implementation: context matters. International Journal of Production Research 53:13, pages 3947-3962.
Read now
Reza Zanjirani Farahani, Hannaneh Rashidi Bajgan, Behnam Fahimnia & Mohamadreza Kaviani. (2015) Location-inventory problem in supply chains: a modelling review. International Journal of Production Research 53:12, pages 3769-3788.
Read now
Jiunn-Chenn Lu & Taho Yang. (2015) Implementing lean standard work to solve a low work-in-process buffer problem in a highly automated manufacturing environment. International Journal of Production Research 53:8, pages 2285-2305.
Read now
Frederic Ponsignon, Roger S. Maull & Philip A. Smart. (2014) Four archetypes of process improvement: a Q-methodological study. International Journal of Production Research 52:15, pages 4507-4525.
Read now
Yusuf Tansel İç & Sebla Yıldırım. (2013) MOORA-based Taguchi optimisation for improving product or process quality. International Journal of Production Research 51:11, pages 3321-3341.
Read now
Jiunn-Chenn Lu, Taho Yang & Chao‐Ton Su. (2012) Analysing optimum push/pull junction point location using multiple criteria decision‐making for multistage stochastic production system. International Journal of Production Research 50:19, pages 5523-5537.
Read now

Articles from other publishers (28)

Gaurav Kumar Badhotiya, Anand Gurumurthy, Yogesh Marawar & Gunjan Soni. (2024) Lean manufacturing in the last decade: insights from published case studies. Journal of Manufacturing Technology Management.
Crossref
V. Kamala, Vijaya Sunder M, V Raja Sreedharan, Kaoutar Chargui, Tarik Zouadi & Guilherme Luz Tortorella. (2024) Testing the S-Curve Theory in OEM for Lean Operations: A Study on Organizational Transformation in the VUCA World. IEEE Transactions on Engineering Management 71, pages 7930-7945.
Crossref
Chaochao Liu & Yang Zhang. (2022) Advances and hotspots analysis of value stream mapping using bibliometrics. International Journal of Lean Six Sigma 14:1, pages 190-208.
Crossref
Ahmad A. Mumani, Ghazi M. Magableh & Mahmoud Z. Mistarihi. (2021) Decision making process in lean assessment and implementation: a review. Management Review Quarterly 72:4, pages 1089-1128.
Crossref
Pi-Yu Lin, Kai-Ying Chen, Chen-Yang Cheng, Wei-Hao Su & Louis Y. Y. Lu. (2022) The Academic Development Trajectories of the Lean Production Based on Main Path Analysis Method. Processes 10:8, pages 1495.
Crossref
Wenchi Shou, Jun Wang & Peng Wu. (2021) The application of simulation in lean production research: a critical review and future directions. Engineering, Construction and Architectural Management 28:8, pages 2119-2154.
Crossref
Yusuf Tansel Ic, Ebru Saraloğlu Güler, Büşra Sezer, Buğrahan Samed Taş & Hazel Sultan Şahin. (2021) Multi-objective Optimization of Turning Parameters for SiC- or Al2O3-Reinforced Aluminum Matrix Composites. Process Integration and Optimization for Sustainability 5:3, pages 609-623.
Crossref
Mitsuhiro Fukuzawa. (2020) Function of value stream mapping in operations management journals. Annals of Business Administrative Science 19:5, pages 207-225.
Crossref
Taho Yang, Yuan-Feng Wen, Zong-Rui Hsieh & Jianxia Zhang. (2020) A lean production system design for semiconductor crystal-ingot pulling manufacturing using hybrid Taguchi method and simulation optimization. Assembly Automation 40:3, pages 433-445.
Crossref
Joscha Kaiser, Sarah Zimmermann & Joachim Metternich. (2020) Logistic decisions in value stream design: a case study. Procedia CIRP 93, pages 640-645.
Crossref
Jagdeep Singh, Harwinder Singh, Amandeep Singh & Jashanpreet Singh. (2019) Managing industrial operations by lean thinking using value stream mapping and six sigma in manufacturing unit. Management Decision 58:6, pages 1118-1148.
Crossref
Christian Urnauer, Joscha Kaiser, Matthias Gunkel & Joachim Metternich. (2019) Multidimensional Assessment of Value Stream Design Alternatives. Procedia CIRP 86, pages 264-269.
Crossref
Joscha Kaiser, Christian Urnauer & Joachim Metternich. (2019) A framework for planning logistical alternatives in value stream design. Procedia CIRP 81, pages 180-185.
Crossref
Guilherme Tortorella, Glauco Silva, Lucila M.S. Campos, Cassiano Pizzeta, Amanda Latosinski & Alessandro Soares. (2018) Productivity improvement in solid waste recycling centres through lean implementation aided by multi-criteria decision analysis. Benchmarking: An International Journal 25:5, pages 1480-1499.
Crossref
Yusuf Tansel İç. (2016) Development of a new multi-criteria optimization method for engineering design problems. Research in Engineering Design 27:4, pages 413-436.
Crossref
Yiyo Kuo, Taho Yang, David Parker & Chin-Hsuan Sung. (2016) Integration of customer and supplier flexibility in a make-to-order industry. Industrial Management & Data Systems 116:2, pages 213-235.
Crossref
David Kruger. (2015) Process integration and improvement in a higher education institution in South Africa. Process integration and improvement in a higher education institution in South Africa.
Teng-Kuan Wang, Taho Yang, Chih-Yao Yang & Felix T.S. Chan. (2015) Lean principles and simulation optimization for emergency department layout design. Industrial Management & Data Systems 115:4, pages 678-699.
Crossref
Taho Yang, Yiyo Kuo, David Parker & Kuan Hung Chen. (2015) A Multiple Attribute Group Decision Making Approach for Solving Problems with the Assessment of Preference Relations. Mathematical Problems in Engineering 2015, pages 1-10.
Crossref
Taho Yang, Yiyo Kuo, Chao-Ton Su & Chia-Lin Hou. (2015) Lean production system design for fishing net manufacturing using lean principles and simulation optimization. Journal of Manufacturing Systems 34, pages 66-73.
Crossref
Taho Yang, Teng-Kuan Wang, Vincent C. Li & Chia-Lo Su. (2014) The Optimization of Total Laboratory Automation by Simulation of a Pull-Strategy. Journal of Medical Systems 39:1.
Crossref
Markus Philipp Roessler, Ina Kleeberg, Moritz Kreder, Joachim Metternich & Klaus Schuetzer. 2015. Industrial Engineering, Management Science and Applications 2015. Industrial Engineering, Management Science and Applications 2015 393 402 .
Maria Kollberg Thomassen, Erlend Alfnes & Erik Gran. 2015. Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth. Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth 207 214 .
Jaiprakash Bhamu & Kuldip Singh Sangwan. (2014) Lean manufacturing: literature review and research issues. International Journal of Operations & Production Management 34:7, pages 876-940.
Crossref
T. K. Wang, F. T. S. Chan & T. Yang. (2014) The Integration of Group Technology and Simulation Optimization to Solve the Flow Shop with Highly Variable Cycle Time Process: A Surgery Scheduling Case Study. Mathematical Problems in Engineering 2014, pages 1-10.
Crossref
Yusuf Tansel İç. (2014) A TOPSIS based design of experiment approach to assess company ranking. Applied Mathematics and Computation 227, pages 630-647.
Crossref
T. Yang & T. K. Wang. 2013. Advances in Sustainable and Competitive Manufacturing Systems. Advances in Sustainable and Competitive Manufacturing Systems 1591 1599 .
Yusuf Tansel İç. (2012) An experimental design approach using TOPSIS method for the selection of computer-integrated manufacturing technologies. Robotics and Computer-Integrated Manufacturing 28:2, pages 245-256.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.