448
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time

&
Pages 2940-2952 | Received 26 May 2010, Accepted 24 Mar 2011, Published online: 18 Jul 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (12)

Ali Salmasnia & Sepideh Dehghani. (2023) A production-inventory model under quality-maintenance policy with rework process in the presence of random failures and multiple assignable causes. International Journal of Modelling and Simulation 43:6, pages 832-848.
Read now
Peter E. D. Love, Jane Matthews, Lavagnon A. Ika, Pauline Teo, Weili Fang & John Morrison. (2023) From Quality-I to Quality-II: cultivating an error culture to support lean thinking and rework mitigation in infrastructure projects. Production Planning & Control 34:9, pages 812-829.
Read now
Ali Salmasnia, Zahra Hajihosseini & Mohammad Reza Maleki. (2022) An economic manufacturing quantity model with rework process for deteriorating products under maintenance-quality policy. International Journal of Modelling and Simulation 42:6, pages 946-965.
Read now
Xinfeng Lai, Zhixiang Chen & Bopaya Bidanda. (2019) Optimal decision of an economic production quantity model for imperfect manufacturing under hybrid maintenance policy with shortages and partial backlogging. International Journal of Production Research 57:19, pages 6061-6085.
Read now
Hongfu Huang, Yong He & Dong Li. (2018) Coordination of pricing, inventory, and production reliability decisions in deteriorating product supply chains. International Journal of Production Research 56:18, pages 6201-6224.
Read now
Ya-Hui Lin, Yan-Chun Chen & Wen-Ying Wang. (2017) Optimal production model for imperfect process with imperfect maintenance, minimal repair and rework. International Journal of Systems Science: Operations & Logistics 4:3, pages 229-240.
Read now
Chang Wook Kang, Misbah Ullah, Biswajit Sarkar, Iftikhar Hussain & Rehman Akhtar. (2017) Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system. International Journal of Production Research 55:6, pages 1748-1766.
Read now
Yu-Chung Tsao. (2014) A piecewise nonlinear model for a production system under maintenance, trade credit and limited warehouse space . International Journal of Production Research 52:10, pages 3052-3073.
Read now
Misbah Ullah & Chang W. Kang. (2014) Effect of rework, rejects and inspection on lot size with work-in-process inventory. International Journal of Production Research 52:8, pages 2448-2460.
Read now
M. Karimi-Nasab & K. Sabri-Laghaie. (2014) Developing approximate algorithms for EPQ problem with process compressibility and random error in production/inspection. International Journal of Production Research 52:8, pages 2388-2421.
Read now
Shoude Li. (2014) Optimal control of production-maintenance system with deteriorating items, emission tax and pollution R&D investment. International Journal of Production Research 52:6, pages 1787-1807.
Read now
Hui-Ming Wee, Wan-Tsu Wang & Po-Chung Yang. (2013) A production quantity model for imperfect quality items with shortage and screening constraint. International Journal of Production Research 51:6, pages 1869-1884.
Read now

Articles from other publishers (25)

Deepanjali Sahoo, Amalesh Kumar Manna, Jitendra Kumar Pati & Arun Kumar Tripathy. (2023) Development of Green and Non-green Product Manufacturing Model Under Carbon Emission and Price Dependent Demand Using Multi-objective Optimization. International Journal of Applied and Computational Mathematics 9:5.
Crossref
Germán Herrera Vidal. (2022) Deterministic and Stochastic İnventory Models in Production Systems: a Review of the Literature. Process Integration and Optimization for Sustainability 7:1-2, pages 29-50.
Crossref
Kousik Bhattacharya & Sujit Kumar De. (2022) A pollution sensitive fuzzy EPQ model with endogenous reliability and product deterioration based on lock fuzzy game theoretic approach. Soft Computing 27:6, pages 3065-3081.
Crossref
Nabajyoti Bhattacharjee, Nabendu Sen & Sanjukta Malakar. (2022) A sustainable retailer’s inventory model to study the partial replacement for deteriorating items with variable shelf-life. OPSEARCH 59:4, pages 1502-1521.
Crossref
Ata Allah Taleizadeh, Reza Askari & Ioannis Konstantaras. (2021) An optimization model for a manufacturing-inventory system with rework process based on failure severity under multiple constraints. Neural Computing and Applications 34:6, pages 4221-4264.
Crossref
Dipankar Bose & Apratim Guha. (2021) Economic production lot sizing under imperfect quality, on-line inspection, and inspection errors: Full vs. sampling inspection. Computers & Industrial Engineering 160, pages 107565.
Crossref
Subhajit Das, Amalesh Kumar Manna, Emad E. Mahmoud, Kholod M. Abualnaja, Abdel-Haleem Abdel-Aty & Ali Akbar Shaikh. (2020) Product Replacement Policy in a Production Inventory Model with Replacement Period-, Stock-, and Price-Dependent Demand. Journal of Mathematics 2020, pages 1-8.
Crossref
Rung-Hung Su, Ming-Wei Weng & Yung-Fu Huang. (2019) Innovative maintenance problem in a two-stage production-inventory system with imperfect processes. Annals of Operations Research 287:1, pages 379-401.
Crossref
Ata Allah Taleizadeh, Mahboobeh Perak Sari-Khanbaglo & Leopoldo Eduardo Cardenas-Barron. (2019) Outsourcing Rework of Imperfect Items in the Economic Production Quantity (EPQ) Inventory Model With Backordered Demand. IEEE Transactions on Systems, Man, and Cybernetics: Systems 49:12, pages 2688-2699.
Crossref
Kung, Huang, Wee & Daryanto. (2019) Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering. Mathematics 7:7, pages 616.
Crossref
Guoqing Cheng, Binghai Zhou, Faqun Qi & Ling Li. (2016) Modeling condition-based maintenance and replacement strategies for an imperfect production-inventory system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 232:10, pages 1858-1871.
Crossref
Sunil Tiwari, Yosef Daryanto & Hui Ming Wee. (2018) Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. Journal of Cleaner Production 192, pages 281-292.
Crossref
Vaibhav Chaudhary, Rakhee Kulshrestha & Srikanta Routroy. (2018) State-of-the-art literature review on inventory models for perishable products. Journal of Advances in Management Research 15:3, pages 306-346.
Crossref
Guo Qing Cheng, Bing Hai Zhou & Ling Li. (2018) Integrated production, quality control and condition-based maintenance for imperfect production systems. Reliability Engineering & System Safety 175, pages 251-264.
Crossref
Prasert Aengchuan & Busaba Phruksaphanrat. (2015) Comparison of fuzzy inference system (FIS), FIS with artificial neural networks (FIS + ANN) and FIS with adaptive neuro-fuzzy inference system (FIS + ANFIS) for inventory control. Journal of Intelligent Manufacturing 29:4, pages 905-923.
Crossref
Hadi Mokhtari. (2017) A joint internal production and external supplier order lot size optimization under defective manufacturing and rework. The International Journal of Advanced Manufacturing Technology 95:1-4, pages 1039-1058.
Crossref
Guo Qing Cheng, Bing Hai Zhou & Ling Li. (2017) Joint optimization of lot sizing and condition-based maintenance for multi-component production systems. Computers & Industrial Engineering 110, pages 538-549.
Crossref
Hongfu Huang, Yong He & Dong Li. (2016) EPQ for an unreliable production system with endogenous reliability and product deterioration. International Transactions in Operational Research 24:4, pages 839-866.
Crossref
Larissa Janssen, Thorsten Claus & Jürgen Sauer. (2016) Literature review of deteriorating inventory models by key topics from 2012 to 2015. International Journal of Production Economics 182, pages 86-112.
Crossref
Qi Xu & Jianteng Xu. (2016) Heuristics for the Economic Production Quantity Problem under Restrictions on Production and Maintenance Time. Mathematical Problems in Engineering 2016, pages 1-9.
Crossref
Alessandro Andriolo, Daria Battini, Robert W. Grubbström, Alessandro Persona & Fabio Sgarbossa. (2014) A century of evolution from Harris׳s basic lot size model: Survey and research agenda. International Journal of Production Economics 155, pages 16-38.
Crossref
Hui Ming Wee & Gede Agus Widyadana. (2013) A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 41:6, pages 941-954.
Crossref
Nita H. Shah, Dushyantkumar G. Patel & Digeshkumar B. Shah. (2013) EPQ Model for Trended Demand with Rework and Random Preventive Machine Time. ISRN Operations Research 2013, pages 1-8.
Crossref
P.C. Yang, S.L. Chung, H.M. Wee, E. Zahara & C.Y. Peng. (2013) Collaboration for a closed-loop deteriorating inventory supply chain with multi-retailer and price-sensitive demand. International Journal of Production Economics 143:2, pages 557-566.
Crossref
Biswajit Sarkar. (2013) A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Applied Mathematical Modelling 37:5, pages 3138-3151.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.