448
Views
37
CrossRef citations to date
0
Altmetric
Original Articles

Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time

&
Pages 2940-2952 | Received 26 May 2010, Accepted 24 Mar 2011, Published online: 18 Jul 2011

References

  • Abboud , NE , Jaber , MY and Noueihed , NA . 2000 . Economic lot sizing with consideration of random machine unavailability time . Computers & Operations Research , 27 ( 4 ) : 335 – 351 .
  • Cardenas-Barron , LE . 2009 . On optimal batch sizing in a multi-stage production system with rework consideration . European Journal of Operational Research , 196 : 1238 – 1244 .
  • Chiu , SW . 2007 . Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging . Applied Stochastic Models in Business and Industry , 23 : 165 – 178 .
  • Chiu , SW , Gong , DC and Wee , HM . 2004 . Effects of random defective rate and imperfect rework process on economic production quantity model . Japan Journal of Industrial and Applied Mathematics , 21 : 375 – 389 .
  • Chiu , SW , Ting , CK and Chiu , YSP . 2007 . Optimal production lot sizing with rework, scrap rate, and service level constraint . Mathematical and Computer Modelling , 46 : 535 – 549 .
  • Chung , CJ and Wee , HM . 2010 . Green-product-design and information-technology investment on replenishment model with remanufacturing . International Journal of Computer Integrated Manufacturing , 23 : 466 – 485 .
  • Chung , CJ , Widyadana , GA and Wee , HM . 2011 . Economic production quantity model for deteriorating inventory with random machine unavailability and shortage . International Journal of Production Research , 49 : 883 – 902 .
  • Dobos , I and Richter , K . 2004 . An extended production/recycling model with stationary demand and return rates . International Journal of Production Economics , 90 : 311 – 323 .
  • Flapper , SDP and Teunter , RH . 2004 . Logistic planning of rework with deteriorating work-in-process . International Journal of Production Economics , 51 : 51 – 59 .
  • Inderfuth , K . 2006 . Batching work and rework processes with limited deterioration of recoverable . Computers & Operations Research , 33 : 1595 – 1605 .
  • Inderfuth , K , Lindner , G and Rachaniotis , NP . 2005 . Lot sizing in a production system with rework and product deterioration . International Journal of Production Research , 43 : 1355 – 1374 .
  • Jamal , AMM , Sarker , BR and Mondal , S . 2004 . Optimal manufacturing batch size with rework process at a single-stage production system . Computers & Industrial Engineering , 47 : 77 – 89 .
  • Khouja , M . 2000 . The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate . IIE Transactions , 32 : 715 – 725 .
  • Koh , SG . 2002 . An optimal ordering and recovery policy for reusable items . Computers & Industrial Engineering , 43 : 59 – 73 .
  • Meller , RD and Kim , DS . 1996 . The impact of preventive maintenance on system cost and buffer size . European Journal of Operational Research , 95 : 577 – 591 .
  • Misra , RB . 1975 . Optimum production lot-size model for a system with deteriorating inventory . International Journal of Production Research , 13 : 495 – 505 .
  • Schrady , DA . 1967 . A deterministic inventory model for repairable items . Naval Research Logistics , 48 : 484 – 495 .
  • Sheu , SH and Chen , JA . 2004 . Optimal lot-sizing problem with imperfect maintenance and imperfect production . International Journal of Systems Science , 35 ( 1 ) : 69 – 77 .
  • Teunter , R . 2004 . Lot-sizing for inventory systems with product recovery . Computers & Industrial Engineering , 46 : 431 – 441 .
  • Tsou , JC and Chen , WJ . 2008 . The impact of preventive activities on the economics of production systems: Modeling and application . Applied Mathematical Modelling , 32 : 1056 – 1065 .
  • Wee , HM and Chung , CJ . 2009 . Optimising replenishment policy for an integrated production inventory deteriorating model considering green component-value design and remanufacturing . International Journal of Production Research , 47 : 1343 – 1368 .
  • Widyadana , GA and Wee , HM . 2010 . Revisiting lot sizing for an inventory system with product recovery . Computers and Mathematics with Applications , 59 ( 8 ) : 2933 – 2939 .
  • Yang , PC and Wee , HM . 2006 . A collaborative inventory system with permissible delay in payment for deteriorating items . Mathematical and Computer Modelling , 43 : 209 – 221 .
  • Yang , PC . 2010 . Sequential dan global optimization for a closed-loop deteriorating inventory supply chain . Mathematical and Computer Modelling , 52 : 161 – 176 .
  • Yoo , SH , Kim , DS and Park , MS . 2009 . Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return . International Journal of Production Economics , 121 : 255 – 265 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.