1,146
Views
19
CrossRef citations to date
0
Altmetric
Articles

Time estimation method for manual assembly using MODAPTS technique in the product design stage

, &
Pages 3595-3613 | Received 10 Jan 2013, Accepted 18 Dec 2013, Published online: 27 Jan 2014

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Vladimir Polotski, Yvan Beauregard & Arthur Franzoni. (2019) Combining predetermined and measured assembly time techniques: Parameter estimation, regression and case study of fenestration industry. International Journal of Production Research 57:17, pages 5499-5519.
Read now
Vijaya Dixit, Rajiv Srivastava K.Atanu Chaudhuri. (2015) Project network-oriented materials management policy for complex projects: a Fuzzy Set Theoretic approach. International Journal of Production Research 53:10, pages 2904-2920.
Read now

Articles from other publishers (17)

Xinyu Li & Chun-Hsien Chen. 2024. Digital Manufacturing. Digital Manufacturing 279 331 .
Suzanne Harmse, Tania Lee Buys & Nico Claassen. (2023) Assessing work speed using MODAPTS: A tool for occupational therapists. Work 76:3, pages 1167-1176.
Crossref
Venkata Krishna Rao Pabolu. (2023) A CoBot Reinforcement Framework To Facilitate Assembly line Workers. Procedia CIRP 118, pages 241-246.
Crossref
Sube Singh, Ayush Mohanty, Rahul Rai, Biswajit Mahanty & Manoj Kumar Tiwari. (2022) An Optimization Framework for Operational-Level Resource Composition in an Inclusive Manufacturing System. Journal of Computing and Information Science in Engineering 22:5.
Crossref
Yifan LiThomas J. Armstrong. (2022) Model Based Approach of Integrating Spatial and Temporal Tools compared to traditional Time Studies. Proceedings of the Human Factors and Ergonomics Society Annual Meeting 66:1, pages 646-650.
Crossref
Nikolaus Angel, Horst Orsolits & Jose Garcia. (2022) Developing an AR Based Tool for Teaching Motion Analysis on Assembly Tasks. Developing an AR Based Tool for Teaching Motion Analysis on Assembly Tasks.
Shun Takai. (2021) An Approach to Integrate Product and Process Design Using Augmented Liaison Diagram, Assembly Sequencing, and Assembly Line Balancing. Journal of Mechanical Design 143:10.
Crossref
JiWook Kim, Alireza Golabchi, SangUk Han & Dong-Eun Lee. (2021) Manual operation simulation using motion-time analysis toward labor productivity estimation: A case study of concrete pouring operations. Automation in Construction 126, pages 103669.
Crossref
Jiayu Chen, Dong Zhou, Le Kang, Liang Ma & Hongjuan Ge. (2020) A maintenance time estimation method based on virtual simulation and improved modular arrangement of predetermined time standards. International Journal of Industrial Ergonomics 80, pages 103042.
Crossref
Thierry Yonga, Grace Kanakana-Katumba, Khumbulani Mpofu & Giovani Monzambe. (2020) Prediction of postural discomfort impact on manual assembly: A workshop case study. Procedia Manufacturing 43, pages 583-589.
Crossref
H. Y. Shan, L. N. Li, Y. Yuan & C. Wang. (2018) Simulation and Optimization of Production Line in Em-plant based Assembly Workshop. Simulation and Optimization of Production Line in Em-plant based Assembly Workshop.
Fernanda Assef, Cassius Tadeu Scarpin & Maria Teresinha Steiner. (2018) Confrontation between techniques of time measurement. Journal of Manufacturing Technology Management 29:5, pages 789-810.
Crossref
J. Mall & S. Staudacher. (2018) Evaluation of assemblability during aero engine preliminary design. CEAS Aeronautical Journal 9:1, pages 147-156.
Crossref
Shuang Wu, Yao Wang, Joëlle Zita BolaBola, Hua Qin, Wenying Ding, Wei Wen & Jianwei Niu. (2016) Incorporating motion analysis technology into modular arrangement of predetermined time standard (MODAPTS). International Journal of Industrial Ergonomics 53, pages 291-298.
Crossref
Lijun Liu, Zuhua Jiang, Bo Song, Hongyuan Zhu & Xinyu Li. (2016) A Novel Method for Acquiring Engineering-Oriented Operational Empirical Knowledge. Mathematical Problems in Engineering 2016, pages 1-19.
Crossref
Bugra Alkan, Daniel Vera, Mussawar Ahmad, Bilal Ahmad & Robert Harrison. (2016) A Model for Complexity Assessment in Manual Assembly Operations Through Predetermined Motion Time Systems. Procedia CIRP 44, pages 429-434.
Crossref
Li Pan, Heung Jae Cho & Jae Il Park. (2014) Study on the Design Factors Affecting the Operating Actions that Can Be Used Easily at the Design Stage. Advanced Materials Research 1061-1062, pages 712-715.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.