1,146
Views
19
CrossRef citations to date
0
Altmetric
Articles

Time estimation method for manual assembly using MODAPTS technique in the product design stage

, &
Pages 3595-3613 | Received 10 Jan 2013, Accepted 18 Dec 2013, Published online: 27 Jan 2014

References

  • Boothroyd,G.1985.Assembly Automation and Product Design.New York:Marcel Dekker.
  • Boothroyd,G.1987. “Design for Assembly – The Key to Design for Manufacture.”The International Journal of Advanced Manufacturing Technology2 (3):3–11.10.1007/BF02601481
  • Boothroyd,G., andL.Alting.1992. “Design for Assembly and Disassembly.”CIRP Annals – Manufacturing Technology41 (2):625–636.10.1016/S0007-8506(07)63249-1
  • Boothroyd,G.,P.Dewhurst, andW.Knight.2002.Product Design for Manufacture and Assembly.2nd ed.New York:Marcel Dekker.
  • Chang,G. A.2002. “A Neural Network Model for the Handling Time of Design for Assembly.”Journal of the Chinese Institute of Industrial Engineers19 (1):35–48.10.1080/10170660209509180
  • Crossan,R. M., andH. W.Nance.1980.Master Standard Data: The Economic Approach to Work Measurement.Huntington, WV:Krieger Publishing.
  • Eversheim,W.,H.Rozenfeld,W.Bochtler, andR.Graessler.1995. “A Methodology for an Integrated Design and Process Planning Based on a Concurrent Engineering Reference Model.”CIRP Annals – Manufacturing Technology44 (1):403–406.10.1016/S0007-8506(07)62351-8
  • Fisher, R. A. 1971. The Design of Experiments. 9th ed. New York: Macmillan.
  • Freivalds, A., and J. Goldberg. 1988. “Specification of Base for Variable Relaxation Allowance.” Journal of Methods Time Measurement 14: 2–29.
  • Goodman, S. N. 1999. “Toward Evidence-based Medical Statistics. 1: The P Value Fallacy.” Annals of Internal Medicine 130 (12): 995–1004.
  • Heyde,C. G.1983.MODAPTS Plus.Sydney:Heyde Dynamics Pty Ltd.
  • Holmes,W. G.1938.Applied Time and Motion Study. New York: Ronald Press.
  • Karger,D. W., andF. H.Bayha.1987.Engineered Work Measurement: The Principles, Techniques, and Data of Methods-time Measurement Background and Foundations of Work Measurement and Methods-time Measurement, plus Other Related Material. New York: Industrial Press.
  • Korean Agency for Technology and Standards.2010.6th Korean Human Dimensions Research Business Report. Seoul.
  • Lu,R. F.,T. D.Petersen, andR. L.Storch.2009. “Asynchronous Stochastic Learning Curve Effects in Engineering-to-order Customisation Processes.”International Journal of Production Research47 (5):1309–1329.10.1080/00207540701484921
  • Lucas Engineering Systems Ltd, University Of Hull.1995.Design for Assembly/Manufacture Analysis Practitioners Manual. Ver. 10.5.Solihull:CSC Manufacturing.
  • Mathieson,J. L.,B. A.Wallace, andJ. D.Summers.2013. “Assembly Time Modelling through Connective Complexity Metrics.”International Journal of Computer Integrated Manufacturing 26 (10): 955–967.
  • Miller,M.,J.Mathieson,J. D.Summers, andG. M.Mocko.2012.Representation: Structural Complexity of Assemblies to Create Neural Network Based Assembly Time Estimation Models. InInternational Design Engineering Technical Conferences and Computers and Information in Engineering Conference,Chicago, IL, DETC2012–71337.1–11.
  • Miyakawa,S. andT.Ohashi1986.The Hitachi Assemblability Evaluation Method (AEM). InProceedings of the International Conference on Product Design for Assembly,Newport, RI, April 15–17.
  • Miyakawa,S.,T.Ohashi andM.Iwata.1990.The Hitachi New Assemblability Evaluation Method (AEM). InTrans. North American Manufacturing Research Institution of SME, May 23–25.
  • Niebel,B. P.1988.Motion and Time Study.8th ed.Homewood, IL:Irwin.
  • Ohashi,T.,M.Iwata,S.Arimoto, andS.Miyakawa.2002. “Extended Assemblability Evaluation Method (AEM). Extended Quantitative Assembly Producibility Evaluation for Assembled Parts and Products.”JSME International Journal Series C45 (2):567–574.10.1299/jsmec.45.567
  • Redford,A. H., andJ.Chal.1994.Design for Assembly: Principles and Practice.London:McGraw-Hill.
  • Sellie,C. N.1992.Predetermined Motion-time Systems and the Development and Use of Standard Data.New York:Wiley.
  • Singer,G.,M.Golan, andY.Cohen.Forthcoming. “From Product Documentation to a ‘Method Prototype’ and Standard Times: A New Technique for Complex Manual Assembly.” International Journal of Production Research 52 (2): 507–520.10.1080/00207543.2013.836613
  • Suzuki,T.,T.Ohashi,M.Asano, andT.Arai.2003. “Assembly Reliability Evaluation Method (AREM).”CIRP Annals – Manufacturing Technology52 (1):9–12.10.1016/S0007-8506(07)60518-6
  • Swift,K. G.1981.Design for Assembly Handbook. Salford: Salford University Industrial Center.
  • Whitney,D. E.1996. The Potential for Assembly Modeling in Product Development and Manufacturing. InProceedings of the 1995 IEEE International Symposium on Assembly and Task Planning. Pittsburgh, PA.
  • Zandin,K. B.2003.MOST Work Measurement Systems.3rd ed.New York:Marcel Dekker.
  • Zha,X. F.,S. Y.Lim, andW. F.Lu.2003. “A Knowledge Intensive Multi-agent System for Cooperative/Collaborative Assembly Modeling and Process Planning.”Journal of Integrated Design and Process Science7 (1):99–122.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.