1,008
Views
25
CrossRef citations to date
0
Altmetric
Articles

Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups

ORCID Icon, , &
Pages 6893-6907 | Received 18 Jan 2018, Accepted 09 Jan 2019, Published online: 12 Feb 2019

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Chengshuai Li, Yuyan Han, Biao Zhang, Yuting Wang, Junqing Li & Kaizhou Gao. (2024) A novel collaborative iterative greedy algorithm for hybrid flowshop scheduling problem with batch processing machines and variable sublots. International Journal of Production Research 62:11, pages 4076-4096.
Read now
Zhaohui Li & Guohua Wan. (2023) Batching and scheduling in a continuous-discrete hybrid flowshop: Lagrangian relaxation-based heuristic algorithms. International Journal of Production Research 61:17, pages 5934-5955.
Read now
Biao Zhang, Quan-ke Pan, Lei-lei Meng, Xin-li Zhang & Xu-chu Jiang. (2023) A decomposition-based multi-objective evolutionary algorithm for hybrid flowshop rescheduling problem with consistent sublots. International Journal of Production Research 61:3, pages 1013-1038.
Read now
Christian Gahm, Stefan Wahl & Axel Tuma. (2022) Scheduling parallel serial-batch processing machines with incompatible job families, sequence-dependent setup times and arbitrary sizes. International Journal of Production Research 60:17, pages 5131-5154.
Read now

Articles from other publishers (20)

Yuanyuan Zhang, Junqing Li, Ying Xu & Peiyong Duan. (2024) Multi-population cooperative multi-objective evolutionary algorithm for sequence-dependent group flow shop with consistent sublots. Expert Systems with Applications 237, pages 121594.
Crossref
Qianqian Zheng, Yu Zhang, Hongwei Tian & Lijun He. (2023) A cooperative adaptive genetic algorithm for reentrant hybrid flow shop scheduling with sequence-dependent setup time and limited buffers. Complex & Intelligent Systems 10:1, pages 781-809.
Crossref
Xinyue Wang, Tao Ren, Danyu Bai, Feng Chu, Xinyu Lu, Zedong Weng, Jiang Li & Jie Liang. (2024) Hybrid Flow Shop Scheduling With Learning Effects and Release Dates to Minimize the Makespan. IEEE Transactions on Systems, Man, and Cybernetics: Systems 54:1, pages 365-378.
Crossref
Zhifeng Liu, Jiming Zha, Jun Yan, Yueze Zhang, Tianzuo Zhao, Qiang Cheng & Chenyang Cheng. (2024) An improved genetic algorithm with an overlapping strategy for solving a combination of order batching and flexible job shop scheduling problem. Engineering Applications of Artificial Intelligence 127, pages 107321.
Crossref
Eyüp Ensar Işık, Seyda Topaloglu Yildiz & Özge Şatır Akpunar. (2023) Constraint programming models for the hybrid flow shop scheduling problem and its extensions. Soft Computing 27:24, pages 18623-18650.
Crossref
Fawu Xie, Lingling Li, Li Li, Yangpeng Huang & Zaixiang He. (2023) A decomposition-based multi-objective Jaya algorithm for lot-streaming job shop scheduling with variable sublots and intermingling setting. Expert Systems with Applications 228, pages 120402.
Crossref
Yingying Zhu, Qiuhua Tang, Liping Zhang, Ming He & Jerry Kapenda. (2023) Improved multi-objective artificial bee colony algorithm for parallel machine lot-streaming scheduling problem with limited and unequal sub-lots. Computers & Industrial Engineering 183, pages 109428.
Crossref
Janis S. Neufeld, Söhnke Maecker, Liji Shen, Rubén Ruiz & Udo Buscher. 2023. Logistics Management. Logistics Management 165 179 .
Beren Gürsoy Yılmaz & Ömer Faruk Yılmaz. (2022) Lot streaming in hybrid flowshop scheduling problem by considering equal and consistent sublots under machine capability and limited waiting time constraint. Computers & Industrial Engineering, pages 108745.
Crossref
Danial Rooyani & Fantahun Defersha. (2022) A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming. Algorithms 15:7, pages 246.
Crossref
Huan Liu, Fuqing Zhao, Ling Wang, Jie Cao, Jianxin Tang & Jonrinaldi. (2022) An estimation of distribution algorithm with multiple intensification strategies for two-stage hybrid flow-shop scheduling problem with sequence-dependent setup time. Applied Intelligence.
Crossref
Eduardo Guzman, Beatriz Andres & Raul Poler. (2022) Models and algorithms for production planning, scheduling and sequencing problems: A holistic framework and a systematic review. Journal of Industrial Information Integration 27, pages 100287.
Crossref
Biao Zhang, Quan-ke Pan, Lei-lei Meng, Chao Lu, Jian-hui Mou & Jun-qing Li. (2022) An automatic multi-objective evolutionary algorithm for the hybrid flowshop scheduling problem with consistent sublots. Knowledge-Based Systems 238, pages 107819.
Crossref
Qi Wei & Yong Wu. (2022) Two-Machine Hybrid Flow-Shop Problems in Shared Manufacturing. Computer Modeling in Engineering & Sciences 131:2, pages 1125-1146.
Crossref
Alexandra Salazar-Moya & Marcelo V. Garcia. (2021) Lot Streaming in Different Types of Production Processes: A PRISMA Systematic Review. Designs 5:4, pages 67.
Crossref
Wichai Srisuruk, Kanchala Sudtachat & Paramate Horkaew. (2021) Biobjective Scheduling for Joint Parallel Machines with Sequence-Dependent Setup by Taking Pareto-Based Approach. Modelling and Simulation in Engineering 2021, pages 1-19.
Crossref
Biao Zhang, Quan-Ke Pan, Lei-Lei Meng, Xin-Li Zhang, Ya-Ping Ren, Jun-Qing Li & Xu-Chu Jiang. (2021) A collaborative variable neighborhood descent algorithm for the hybrid flowshop scheduling problem with consistent sublots. Applied Soft Computing 106, pages 107305.
Crossref
Bin Zhu, Yuan Li & Fuqiang Zhang. (2021) A Credibility-Based MPS/MRP Integrated Programming Model Under Complex Uncertainty. International Journal of Fuzzy Systems 23:5, pages 1414-1430.
Crossref
Ming Cheng & Subhash C. Sarin. (2020) Lot streaming in a two-stage assembly system. Annual Reviews in Control 50, pages 303-316.
Crossref
Zilong Zhuang, Zizhao Huang, Daili Song & Wei Qin. 2019. Advances in Swarm Intelligence. Advances in Swarm Intelligence 220 231 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.