43
Views
47
CrossRef citations to date
0
Altmetric
Original Articles

Combined scheduling system for reducing job tardiness in a job shop

Pages 201-211 | Received 12 Dec 1980, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (17)

Douglas H. Grabenstetter & John M. Usher. (2015) Sequencing jobs in an engineer-to-order engineering environment. Production & Manufacturing Research 3:1, pages 201-217.
Read now
Jose M. Framinan & Rainer Leisten. (2010) Available-to-promise (ATP) systems: a classification and framework for analysis. International Journal of Production Research 48:11, pages 3079-3103.
Read now
Philip Kaminsky & Onur Kaya. (2009) Combined make-to-order/make-to-stock supply chains. IIE Transactions 41:2, pages 103-119.
Read now
Ching-En Lee & Chaw-Wen Chen. (1999) 在緊急訂單與延遲成本考量下零工型排程問題派工法之硏究. Journal of the Chinese Institute of Industrial Engineers 16:1, pages 129-146.
Read now
D. B. ROMAN & A. G. del VALLEI. (1996) Dynamic assignation of due-dates in an assembly shop based in simulation. International Journal of Production Research 34:6, pages 1539-1554.
Read now
S. T. ENNS. (1995) A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 33:5, pages 1295-1312.
Read now
IHSAN SABUNCUOGLU & DONL. HOMMERTZHEIM. (1995) Experimental investigation of an FMS due-date scheduling problem: an evaluation of due-date assignment rules. International Journal of Computer Integrated Manufacturing 8:2, pages 133-144.
Read now
A. G. LOERCH & J. A. MUCKSTADT. (1994) An approach to production planning and scheduling in cyclically scheduled manufacturing systems. International Journal of Production Research 32:4, pages 851-871.
Read now
S. T. ENNS. (1993) Job shop flowtime prediction and tardiness control using queueing analysis. International Journal of Production Research 31:9, pages 2045-2057.
Read now
E. S. GEE & C. H. SMITH. (1993) Selecting allowance policies for improved job shop performance. International Journal of Production Research 31:8, pages 1839-1852.
Read now
CHRISTOSP. KOULAMAS. (1990) Job flow-time in a job shop subject to machine breakdowns with applications in modelling job shop in-process inventories. International Journal of Systems Science 21:3, pages 479-486.
Read now
CARLR. SCHULTZ. (1989) An expediting heuristic for the shortest processing time dispatching rule. International Journal of Production Research 27:1, pages 31-41.
Read now
N. S. ADSHEAD & D. H. R. PRICE. (1988) Adaptive scheduling: the use of dynamic due dates to accommodate demand variance in a make-for-stock shop. International Journal of Production Research 26:7, pages 1241-1258.
Read now
T. C. E. CHENG. (1988) Integration of priority dispatching and due-date assignment in a job shop. International Journal of Systems Science 19:9, pages 1813-1825.
Read now
T. C. E. CHENG. (1987) Optimal TWK-power due-date determination and sequencing. International Journal of Systems Science 18:1, pages 1-7.
Read now
KENNETHR. BAKER & JOHNJ. KANET. (1984) Improved decision rules in a combined system for minimizing job tardiness. International Journal of Production Research 22:6, pages 917-921.
Read now
GARYL. RAGATZ & VINCENTA. MABERT. (1984) A framework for the study of due date management in job shops. International Journal of Production Research 22:4, pages 685-695.
Read now

Articles from other publishers (30)

Kenneth R. Baker & Dan Trietsch. 2018. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 427 452 .
Cunbo Zhuang, Jianhua Liu & Hui Xiong. (2018) Digital twin-based smart production management and control framework for the complex product assembly shop-floor. The International Journal of Advanced Manufacturing Technology 96:1-4, pages 1149-1163.
Crossref
Xiang Li, Dongni Li, Xuhui Wu, Hong Zheng & Yong Yin. (2017) A cooperative co-evolution approach for a line-seru conversion problem. A cooperative co-evolution approach for a line-seru conversion problem.
Su Nguyen, Mengjie Zhang, Mark Johnston & Kay Chen Tan. (2014) Automatic Design of Scheduling Policies for Dynamic Multi-objective Job Shop Scheduling via Cooperative Coevolution Genetic Programming. IEEE Transactions on Evolutionary Computation 18:2, pages 193-208.
Crossref
Su Nguyen, Mengjie Zhang, Mark Johnston & Kay Chen Tan. (2012) A coevolution genetic programming method to evolve scheduling policies for dynamic multi-objective job shop scheduling problems. A coevolution genetic programming method to evolve scheduling policies for dynamic multi-objective job shop scheduling problems.
Kenneth R. Baker & Dan Trietsch. 2009. Principles of Sequencing and Scheduling. Principles of Sequencing and Scheduling 249 371 .
Philip Kaminsky & Onur Kaya. (2008) Scheduling and due‐date quotation in a make‐to‐order supply chain. Naval Research Logistics (NRL) 55:5, pages 444-458.
Crossref
Philip Kaminsky & Zu-Hsu Lee. (2008) Effective on-line algorithms for reliable due date quotation and large-scale scheduling. Journal of Scheduling 11:3, pages 187-204.
Crossref
V. Sridharan & Xiaoming Li. (2008) Improving delivery reliability by a new due-date setting rule. European Journal of Operational Research 186:3, pages 1201-1211.
Crossref
Adil Baykasoğlu, Mustafa Göçken & Zeynep D. Unutmaz. (2008) New approaches to due date assignment in job shops. European Journal of Operational Research 187:1, pages 31-45.
Crossref
Donatella Corti, Alessandro Pozzetti & Marta Zorzini. (2006) A capacity-driven approach to establish reliable due dates in a MTO environment. International Journal of Production Economics 104:2, pages 536-554.
Crossref
Pinar Keskinocak & Sridhar Tayur. 2004. Handbook of Quantitative Supply Chain Analysis. Handbook of Quantitative Supply Chain Analysis 485 554 .
I Sabuncuoglu & A Comlekci. (2002) Operation-based flowtime estimation in a dynamic job shop. Omega 30:6, pages 423-442.
Crossref
Pinar Keskinocak, R. Ravi & Sridhar Tayur. (2001) Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues. Management Science 47:2, pages 264-279.
Crossref
Thom J. Hodgson, Denis Cormier, Alexander J. Weintraub & Andrew Zozom. (1998) Note. Satisfying Due Dates in Large Job Shops. Management Science 44:10, pages 1442-1446.
Crossref
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
John R. Grout. (2007) Influencing a Supplier Using Delivery Windows: Its Effect on the Variance of Flow Time and On‐Time Delivery. Decision Sciences 29:3, pages 747-764.
Crossref
Feng-Chang R. Chang. (1996) A study of due-date assignment rules with constrained tightness in a dynamic job shop. Computers & Industrial Engineering 31:1-2, pages 205-208.
Crossref
C.N. Hasan & M.L. Spearman. (1995) Determining job completion time distributions in stochastic production environments. Determining job completion time distributions in stochastic production environments.
C.S. Czerwinski & P.B. Luh. (1994) Scheduling products with bills of materials using an improved Lagrangian relaxation technique. IEEE Transactions on Robotics and Automation 10:2, pages 99-111.
Crossref
Feng-Chang R. Chang. (1994) A study of factors affecting due-date predictability in a simulated dynamic job shop. Journal of Manufacturing Systems 13:6, pages 393-400.
Crossref
Michelle M. Vig & Kevin J. Dooley. (2002) Mixing static and dynamic flowtime estimates for due‐date assignment. Journal of Operations Management 11:1, pages 67-79.
Crossref
Imtiaz Ahmed & Warren W. Fisher. (2007) Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling*. Decision Sciences 23:3, pages 633-647.
Crossref
Patrick R. Philipoom, Robert E. Markland & Timothy D. Fry. (2002) Sequencing rules, progress milestones and product structure in a multistage job shop. Journal of Operations Management 8:3, pages 209-229.
Crossref
R. Haupt. (1989) A survey of priority rule-based scheduling. OR Spektrum 11:1, pages 3-16.
Crossref
T.C.E. Cheng & M.C. Gupta. (1989) Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38:2, pages 156-166.
Crossref
T.C.E. Cheng. (1987) Optimal total-work-content-power due-date determination and sequencing. Computers & Mathematics with Applications 14:8, pages 579-582.
Crossref
Robert T. Barrett & Samir Barman. (2016) A SLAM II simulation study of a simplified flow shop. SIMULATION 47:5, pages 181-189.
Crossref
B.M. Worrall. (1986) Job shop scheduling under resource constraints and varying order priorities. Computers & Industrial Engineering 11:1-4, pages 199-203.
Crossref
Francois Viviers. (1983) A decision support system for job shop scheduling. European Journal of Operational Research 14:1, pages 95-103.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.