58
Views
30
CrossRef citations to date
0
Altmetric
Original Articles

Algorithms for project scheduling with resource constraints

Pages 95-103 | Published online: 06 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (8)

Omer Atli. (2011) Tabu Search and an Exact Algorithm for the Solutions of Resource-Constrained Project Scheduling Problems. International Journal of Computational Intelligence Systems 4:2, pages 255-267.
Read now
Sou-Sen Leu & Tzung-Heng Hung. (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics 20:2, pages 131-141.
Read now
Sou-Sen Leu & Chung-Huei Yang. (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics 17:6, pages 767-776.
Read now
A. Agrawal, G. Harhalakis, I. Minis & R. Nagi. (1996) ‘Just-In-Time’ Production of Large Assemblies. IIE Transactions 28:8, pages 653-667.
Read now
Deng Maw Tsai & Huan Neng Chiu. (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics 14:4, pages 325-340.
Read now
CHRISTOSP. KOULAMAS. (1991) Total tool requirements in multi-level machining systems. International Journal of Production Research 29:2, pages 417-437.
Read now
MOSTAFAM. KHATTAB & F. CHOOBINEH. (1991) A new approach for project scheduling with a limited resource. International Journal of Production Research 29:1, pages 185-198.
Read now
E. A. ELSAYED & N. Z. NASR. (1986) Heuristics for resource-constrained scheduling† . International Journal of Production Research 24:2, pages 299-310.
Read now

Articles from other publishers (22)

Marco Cantamessa & Francesca MontagnaMarco Cantamessa & Francesca Montagna. 2023. Management of Innovation and Product Development. Management of Innovation and Product Development 293 310 .
Ömer ATLI & Serhat AYDIN. (2021) Çok Modlu Kaynak Kısıtlı Proje Çizelgeleme Problemlerinin Belirsizlik Ortamında Modellenmesi. Afyon Kocatepe University Journal of Sciences and Engineering 21:3, pages 586-605.
Crossref
Mazhar Ali, Saif Ullah & Mirza Jahanzaib. (2019) A RESOURCE OPTIMISATION BASED HEURISTIC FOR RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM. NED University Journal of Research XVI:4, pages 115-124.
Crossref
Omer Giran, Rasim Temur & Gebrail Bekdaş. (2017) Resource constrained project scheduling by harmony search algorithm. KSCE Journal of Civil Engineering 21:2, pages 479-487.
Crossref
Angela Chen, Yun-Chia Liang & Jose Padilla. (2016) A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags. Algorithms 9:4, pages 63.
Crossref
Marco Cantamessa & Francesca MontagnaMarco Cantamessa & Francesca Montagna. 2016. Management of Innovation and Product Development. Management of Innovation and Product Development 231 245 .
Angela Chen, Yun-Chia Liang & Jose Padilla. (2014) An Entropy-Based Upper Bound Methodology for Robust Predictive Multi-Mode RCPSP Schedules. Entropy 16:9, pages 5032-5067.
Crossref
S. Thomas Ng, Daisy X.M. Zheng & Jessie Z. Xie. (2013) Allocation of construction resources through a pull‐driven approach. Construction Innovation 13:1, pages 77-97.
Crossref
Recep Kanit, Omer Ozkan & Murat Gunduz. (2009) Effects of project size and resource constraints on project duration through priority rule-base heuristics. Artificial Intelligence Review 32:1-4, pages 115-123.
Crossref
Rainer Kolisch & Sönke Hartmann. (2006) Experimental investigation of heuristics for resource-constrained project scheduling: An update. European Journal of Operational Research 174:1, pages 23-37.
Crossref
R Kolisch & R Padman. (2001) An integrated survey of deterministic project scheduling. Omega 29:3, pages 249-272.
Crossref
Sou-Sen LeuAn-Ting ChenChung-Huei Yang. (1999) Fuzzy Optimal Model for Resource-Constrained Construction Scheduling. Journal of Computing in Civil Engineering 13:3, pages 207-216.
Crossref
Ching-Chun Fu & Hsiao-Fan Wang. (1999) Fuzzy project management by team approach. Fuzzy project management by team approach.
Rainer Kolisch & Sönke Hartmann. 1999. Project Scheduling. Project Scheduling 147 178 .
Rainer Kolisch. (1999) Efficient priority rules for the resource‐constrained project scheduling problem. Journal of Operations Management 14:3, pages 179-192.
Crossref
Rainer Kolisch. (1996) Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research 90:2, pages 320-333.
Crossref
K. Neumann & J. Zhan. (1995) Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints. Journal of Intelligent Manufacturing 6:2, pages 145-154.
Crossref
Adedeji B. Badiru. 1993. Concurrent Engineering. Concurrent Engineering 93 109 .
M. Khattab & F. Choobineh. (1991) A new heuristic for project scheduling with a single resource constraint. Computers & Industrial Engineering 20:3, pages 381-387.
Crossref
M. Khattab & F. Choobineh. (1990) A new heuristic for project scheduling with a single resource constraint. Computers & Industrial Engineering 19:1-4, pages 514-518.
Crossref
Stelios H. Zanakis, James R. Evans & Alkis A. Vazacopoulos. (1989) Heuristic methods and applications: A categorized survey. European Journal of Operational Research 43:1, pages 88-110.
Crossref
A.B. Badiru. (1988) Towards the standardization of performance measures for project scheduling heuristics. IEEE Transactions on Engineering Management 35:2, pages 82-89.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.