References
- BEDWORTH , D. D. , 1973 , Industrial systems planning, analysis, control ( New York Ronald Press Company ).
- BROWN , J. R. , 1976 , Project scheduling under resource constraints an extension of Brooks' Algorithm , unpublished M.S. thesis , Department of Industrial Engineering , Lehigh University .
- CLARK , C. E. , 1961 , The optimum allocation of resources among the activities of a network , J. ind. Engng , 12 , 11 .
- DAVIS , E. W. , 1966 , Resource allocation in project network models—a survey , J. ind. Engng , 17 , 177 .
- ELSAYED , E. A. , 1979 , Analysis of production systems , Lecture notes to be published .
- PATTERSON , J. H. , 1973 , Alternate methods of project scheduling with limited resources , Nav. Res. Logist. Q. , 20 , 767 .
- PHILLIPS , C. R. , 1964 , Fifteen key features of computer programs for CPM and PERT , J. ind. Engng , 15 , 14 .
- WHITEHOUSE , G. E. , and BROWN , J. R. , 1979 , GENRES an extension of Brooks' Algorithm for project scheduling with resource constraints , Int. J. Cornput. ind. Engng , 3 , 261 .
- Presented at the6th International Conference on Production Research (NoviSad), August 1981.