346
Views
58
CrossRef citations to date
0
Altmetric
Original Articles

Just-in-time manufacturing system: a periodic pull system

Pages 553-562 | Received 01 Nov 1983, Published online: 22 Oct 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (14)

Maria Pia Ciano, Rossella Pozzi, Tommaso Rossi & Fernanda Strozzi. (2019) How IJPR has addressed ‘lean’: a literature review using bibliometric tools. International Journal of Production Research 57:15-16, pages 5284-5317.
Read now
Marisa Smith, Steve Paton & Jillian MacBryde. (2018) Lean implementation in a service factory: views from the front-line. Production Planning & Control 29:4, pages 280-288.
Read now
Göran Svensson. (2002) Dyadic Vulnerability in Companies' Inbound and Outbound Logistics Flows. International Journal of Logistics Research and Applications 5:1, pages 13-43.
Read now
R. R. INMAN. (1995) Quantifying the advantages of production quota flexibility in the automotive industry. International Journal of Production Research 33:3, pages 741-755.
Read now
T. M. CHANG & Y. YIH. (1994) Generic kanban systems for dynamic environments. International Journal of Production Research 32:4, pages 889-902.
Read now
L. C. LEE, A. N. POO & K. H. W. SEAH. (1993) Periodic pull: a modified approach to Just-In-Time production. International Journal of Computer Integrated Manufacturing 6:3, pages 186-190.
Read now
B. J. BERKLEY. (1993) Setting minimum performance levels for two-card kanban-controlled lines. International Journal of Production Research 31:5, pages 1003-1021.
Read now
JEAN-LUC DELEERSNYDER, THOMJ. HODGSON, RUSSELLE. KING, PETERJ. O'GRADY & ANDREAS SAVVA. (1992) INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODEL. IIE Transactions 24:3, pages 43-56.
Read now
RAFAELG. MORAS, MOHAMMADR. JALALI & RICHARDA. DUDEK. (1991) A categorized survey of the JIT literature. Production Planning & Control 2:4, pages 322-334.
Read now
BLAIRJ. BERKLEY. (1991) Tandem queues and kanban-controlled lines. International Journal of Production Research 29:10, pages 2057-2081.
Read now
THOMJ. HODGSON & DINGWEI WANG. (1991) Optimal hybrid push/pull control strategies for a parallel multistage system: Part I. International Journal of Production Research 29:6, pages 1279-1287.
Read now
DANIEL SIPPER & REUVEN SHAPIRA. (1989) JIT vs. WIP— a trade-off analysis. International Journal of Production Research 27:6, pages 903-914.
Read now
YASHP. GUPTA & MAHESHC. GUPTA. (1989) A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system. International Journal of Production Research 27:2, pages 309-352.
Read now
AGOSTINO VILLA & MANLIO ARCOSTANZO. (1988) DOPP—dynamically optimized production planning†. International Journal of Production Research 26:10, pages 1637-1650.
Read now

Articles from other publishers (44)

A Araújo, A C Alves & F Romero. (2021) Barriers to Lean and Pull System implementation: a case study. IOP Conference Series: Materials Science and Engineering 1193:1, pages 012048.
Crossref
Jennifer Meta Robinson, Leila Mzali, Daniel Knudsen, James Farmer, Ruta Spiewak, Shellye Suttles, Mecca Burris, Annie Shattuck, Julia Valliant & Angela Babb. (2021) Food after the COVID-19 Pandemic and the Case for Change Posed by Alternative Food: A Case Study of the American Midwest. Global Sustainability 4.
Crossref
José Luís Quesado Pinto, João Carlos O. Matias, Carina Pimentel, Susana Garrido Azevedo & Kannan GovindanJosé Luís Quesado Pinto, João Carlos O. Matias, Carina Pimentel, Susana Garrido Azevedo & Kannan Govindan. 2018. Just in Time Factory. Just in Time Factory 39 112 .
Edwards A. Silver, David F. Pyke & Douglas J. Thomas. 2016. Inventory and Production Management in Supply Chains. Inventory and Production Management in Supply Chains 661 712 .
Malak Mouaky, Abdelaziz Berrado & Loubna Benabbou. (2016) A MCDA approach to select a Kanban system for multi-echelon inventory management in a pharmaceutical supply chain. A MCDA approach to select a Kanban system for multi-echelon inventory management in a pharmaceutical supply chain.
Hermann LöddingHermann Lödding. 2016. Verfahren der Fertigungssteuerung. Verfahren der Fertigungssteuerung 213 244 .
Hermann LöddingHermann Lödding. 2013. Handbook of Manufacturing Control. Handbook of Manufacturing Control 183 216 .
Alireza Ardalan & Rafael Diaz. (2012) An Evaluation of the NERJIT Priority Rule in a Kanban‐Controlled Flowshop . Production and Operations Management 21:5, pages 923-938.
Crossref
Ali Ardalan & Rafael Diaz. (2011) NERJIT : Using Net Requirement Data in Kanban‐Controlled Jumbled‐Flow Shops . Production and Operations Management 21:3, pages 606-618.
Crossref
Boppana V. Chowdary & Damian George. (2011) Improvement of manufacturing operations at a pharmaceutical company. Journal of Manufacturing Technology Management 23:1, pages 56-75.
Crossref
Boppana V. Chowdary & Damian George. (2017) Application of Flexible Lean Tools for Restructuring of Manufacturing Operations: A Case Study. Global Journal of Flexible Systems Management 12:1-2, pages 1-8.
Crossref
Muris Lage Junior & Moacir Godinho Filho. (2010) Variations of the kanban system: Literature review and classification. International Journal of Production Economics 125:1, pages 13-21.
Crossref
Muris Lage Junior & Moacir Godinho Filho. (2008) Adaptações ao sistema kanban: revisão, classificação, análise e avaliação. Gestão & Produção 15:1, pages 173-188.
Crossref
MICHAEL P. KEANE & SUSAN E. FEINBERG. (2007) ADVANCES IN LOGISTICS AND THE GROWTH OF INTRA-FIRM TRADE: THE CASE OF CANADIAN AFFILIATES OF U.S. MULTINATIONALS, 1984-1995*. The Journal of Industrial Economics 55:4, pages 571-632.
Crossref
Göran Svensson. (2002) Vulnerability scenarios in marketing channels. Supply Chain Management: An International Journal 7:5, pages 322-333.
Crossref
Göran Svensson. (2002) A conceptual framework of vulnerability in firms’ inbound and outbound logistics flows. International Journal of Physical Distribution & Logistics Management 32:2, pages 110-134.
Crossref
Göran Svensson. (2001) Just‐in‐time: the reincarnation of past theory and practice. Management Decision 39:10, pages 866-879.
Crossref
Robert A. Leitch. (2001) Effect of stochasticity, capacity and lead time cost drivers on WIP and throughput in a pull production environment. Management Accounting Research 12:2, pages 167-196.
Crossref
W.C. Benton & Hojung Shin. (1998) Manufacturing planning and control: The evolution of MRP and JIT integration. European Journal of Operational Research 110:3, pages 411-440.
Crossref
Sin-Hoon Hum & Chee-Kwong Lee. (1998) JIT scheduling rules: a simulation evaluation. Omega 26:3, pages 381-395.
Crossref
Michael HöckMichael Höck. 1998. Produktionsplanung und -steuerung einer flexiblen Fertigung. Produktionsplanung und -steuerung einer flexiblen Fertigung 84 244 .
Alireza Ardalan. (2007) Analysis of Local Decision Rules in a Dual‐Kanban Flow Shop. Decision Sciences 28:1, pages 195-211.
Crossref
Shigeji Miyazaki. (1996) An analytical comparison of inventory costs between the pull and the parts-oriented production systems. International Journal of Production Economics 44:1-2, pages 151-157.
Crossref
Nils G. Storhagen. (1995) The human aspects of JIT implementation. International Journal of Physical Distribution & Logistics Management 25:3, pages 4-23.
Crossref
Yoshinari Yanagawa, Shigeji Miyazaki & Hiroshi Ohta. (1994) An optimal operation planning for the fixed quantity withdrawal Kanban system with variable leadtimes. International Journal of Production Economics 33:1-3, pages 163-168.
Crossref
A. Gunasekaran, S.K. Goyal, T. Martikainen & P. Yli-Olli. (1993) Modelling and analysis of just-in-time manufacturing systems. International Journal of Production Economics 32:1, pages 23-37.
Crossref
A.Z. Keller & A. Kazazi. (1993) ″Just‐in‐Time″ Manufacturing Systems: A Literature Review. Industrial Management & Data Systems 93:7, pages 2-32.
Crossref
E. Jewkes & M. Power. (1993) A microeconomic analysis of investment in just-in-time manufacturing. International Journal of Production Economics 29:3, pages 313-321.
Crossref
A. Gunasekaran, S.K. Goyal, T. Martikainen & P. Yli-Olli. 1993. Advances in Factories of the Future, CIM and Robotics. Advances in Factories of the Future, CIM and Robotics 35 43 .
Gerhard Knolmayer & Frank Lemke. 1993. Industrielles Management. Industrielles Management 178 197 .
Agostino Villa & Sergio Rossetto. 1993. Expert Systems in Engineering Applications. Expert Systems in Engineering Applications 335 351 .
John A. Buzacott, Suzanne M. Price & J. George Shanthikumar. 1993. Operations Research in Production Planning and Control. Operations Research in Production Planning and Control 71 88 .
BLAIR J. BERKLEY. (2009) A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE. Production and Operations Management 1:4, pages 393-411.
Crossref
JOHN A. BUZACOTT & J. GEORGE SHANTHIKUMAR. (2009) A GENERAL APPROACH FOR COORDINATING PRODUCTION IN MULTIPLE‐CELL MANUFACTURING SYSTEMS. Production and Operations Management 1:1, pages 34-52.
Crossref
Blair J. Berkley. (2007) A Decomposition Approximation for Periodic Kanban‐Controlled Flow Shops*. Decision Sciences 23:2, pages 291-311.
Crossref
N. Singh & J.K. Brar. (1992) Modelling and Analysis of Just‐in‐Time Manufacturing Systems: A Review. International Journal of Operations & Production Management 12:2, pages 3-14.
Crossref
Sedef Meral & Nesim Erkip. (1991) Simulation analysis of a JIT production line. International Journal of Production Economics 24:1-2, pages 147-156.
Crossref
Blair J. Berkley & Ali S. Kiran. (2007) A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop*. Decision Sciences 22:3, pages 559-582.
Crossref
Mohammad Jalali, Rafael Moras & Richard Dudek. 1991. Modern Production Concepts. Modern Production Concepts 246 258 .
S.K. Goyal & A. Gunasekaran. (1990) Multi-stage production-inventory systems. European Journal of Operational Research 46:1, pages 1-20.
Crossref
Martin Walbank. (1989) Information flows—The foundation of manufacturing and stock management. Engineering Costs and Production Economics 15, pages 245-260.
Crossref
William A. Miller & Robert P. Davis. (1989) Synchronization of material flow to aid production planning in a job shop. Engineering Management International 5:3, pages 179-184.
Crossref
Robert P. Davis & William A. Miller. (1988) A planning model for material flow synchronization. Applied Mathematical Modelling 12:1, pages 18-21.
Crossref
Menberu Lulu & J.T. Black. (1987) Effect of process unreliability on integrated manufacturing/production systems. Journal of Manufacturing Systems 6:1, pages 15-22.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.