33
Views
38
CrossRef citations to date
0
Altmetric
Original Articles

Parametric appraisal of the JIT system

Pages 1415-1429 | Received 01 Feb 1987, Published online: 22 Oct 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (15)

C. Lowe & J. D. Tedford. (1997) Fuzzy Production Scheduling for JIT Manufacturing. Intelligent Automation & Soft Computing 3:4, pages 319-329.
Read now
B. J. BERKLEY. (1996) A simulation study of container size in two-card kanban systems. International Journal of Production Research 34:12, pages 3417-3445.
Read now
K. VENKATESH, M.-C. ZHOU, M. KAIGHOBADI & R. CAUDILL. (1996) A Petri net approach to investigating push and pull paradigms in flexible factory automated systems. International Journal of Production Research 34:3, pages 595-620.
Read now
I. H. YAVUZ & AHMET ŞATIR. (1995) Kanban-based operational planning and control: simulation modelling. Production Planning & Control 6:4, pages 331-344.
Read now
I. H. YAVUZ & A. SATIR. (1995) A kanban-based simulation study of a mixed model just-in-time manufacturing line. International Journal of Production Research 33:4, pages 1027-1048.
Read now
T. M. CHANG & Y. YIH. (1994) Generic kanban systems for dynamic environments. International Journal of Production Research 32:4, pages 889-902.
Read now
B. J. BERKLEY. (1993) Effect of buffer capacity and sequencing rules on single-card kanban system performance. International Journal of Production Research 31:12, pages 2875-2893.
Read now
L. C. LEE, A. N. POO & K. H. W. SEAH. (1993) Periodic pull: a modified approach to Just-In-Time production. International Journal of Computer Integrated Manufacturing 6:3, pages 186-190.
Read now
B. J. BERKLEY. (1993) Setting minimum performance levels for two-card kanban-controlled lines. International Journal of Production Research 31:5, pages 1003-1021.
Read now
VITO ALBINO, GIANNI CARELLA & O. GEOFFREY OKOGBAA. (1992) Maintenance policies in just-in-time manufacturing lines. International Journal of Production Research 30:2, pages 369-382.
Read now
MAYANK CHATURVEDI & DAMODARY. GOLHAR. (1992) Simulation modelling and analysis of a JIT production system. Production Planning & Control 3:1, pages 81-92.
Read now
RAFAELG. MORAS, MOHAMMADR. JALALI & RICHARDA. DUDEK. (1991) A categorized survey of the JIT literature. Production Planning & Control 2:4, pages 322-334.
Read now
BLAIRJ. BERKLEY. (1991) Tandem queues and kanban-controlled lines. International Journal of Production Research 29:10, pages 2057-2081.
Read now
LISSA GALBRAITH, WILLIAMA. MILLER & TIMOTHYJ. GREENE. (1991) Pull system performance measures: a review of approaches for system design and control. Production Planning & Control 2:1, pages 24-35.
Read now
JOHN MILTENBURG & JACOB WIJNGAARD. (1991) Designing and phasing in just-in-time production systems. International Journal of Production Research 29:1, pages 115-131.
Read now

Articles from other publishers (23)

Alireza Ardalan & Rafael Diaz. (2012) An Evaluation of the NERJIT Priority Rule in a Kanban‐Controlled Flowshop. Production and Operations Management 21:5, pages 923-938.
Crossref
Ali Ardalan & Rafael Diaz. (2012) NERJIT: Using Net Requirement Data in Kanban‐Controlled Jumbled‐Flow Shops. Production and Operations Management 21:3, pages 606-618.
Crossref
Rafael DiazAli Ardalan. (2010) An Analysis of Dual‐Kanban Just‐In‐Time Systems in a Non‐Repetitive Environment. Production and Operations Management 19:2, pages 233-245.
Crossref
Surendra M. Gupta, Yousef A.Y. Al‐Turki & Ronald F. Perry. (1999) Flexible kanban system. International Journal of Operations & Production Management 19:10, pages 1065-1093.
Crossref
Haldun Aytug. (2016) Simulation Analysis of Order and Kanban Sequencing Rules in a Kanban-Controlled Flow Shop. SIMULATION 72:4, pages 212-220.
Crossref
Sin-Hoon Hum & Chee-Kwong Lee. (1998) JIT scheduling rules: a simulation evaluation. Omega 26:3, pages 381-395.
Crossref
Alireza Ardalan. (2007) Analysis of Local Decision Rules in a Dual‐Kanban Flow Shop. Decision Sciences 28:1, pages 195-211.
Crossref
Gerald Allen Levasseur & Richard Lee Storch. (1996) A non-sequential just-in-time simulation model. Computers & Industrial Engineering 30:4, pages 741-752.
Crossref
Erne Houghton & Victor Portougal. (1995) A planning model for just‐in‐time batch manufacturing. International Journal of Operations & Production Management 15:9, pages 9-25.
Crossref
John Miltenburg. (1993) On the equivalence of jit and mrp as technologies for reducing wastes in manufacturing. Naval Research Logistics 40:7, pages 905-924.
Crossref
A. Gunasekaran, S.K. Goyal, T. Martikainen & P. Yli-Olli. (1993) Modelling and analysis of just-in-time manufacturing systems. International Journal of Production Economics 32:1, pages 23-37.
Crossref
John Miltenburg. (1993) A theoretical framework for understanding why JIT reduces cost and cycle time and improves quality. International Journal of Production Economics 30-31, pages 195-204.
Crossref
Günther Zäpfel & Hubert Missbauer. (1993) New concepts for production planning and control. European Journal of Operational Research 67:3, pages 297-320.
Crossref
Blair J. Berkley. (2007) Simulation Tests of FCFS and SPT Sequencing in Kanban Systems. Decision Sciences 24:1, pages 218-227.
Crossref
Harry Groenevelt. 1993. Logistics of Production and Inventory. Logistics of Production and Inventory 629 670 .
BLAIR J. BERKLEY. (1992) A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE. Production and Operations Management 1:4, pages 393-411.
Crossref
N. Singh & J.K. Brar. (1992) Modelling and Analysis of Just‐in‐Time Manufacturing Systems: A Review. International Journal of Operations & Production Management 12:2, pages 3-14.
Crossref
G.J. Miltenburg & T. Goldstein. (2013) Developing production schedules which balance part usage and smooth production loads for just‐in‐time production systems. Naval Research Logistics (NRL) 38:6, pages 893-910.
Crossref
Blair J. Berkley & Ali S. Kiran. (2007) A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop*. Decision Sciences 22:3, pages 559-582.
Crossref
Sylvia Bedwell‐Brace & R. Anthony Inman. (1991) Simulating JIT Manufacturing: Prospects and Pitfalls. Industrial Management & Data Systems 91:7, pages 3-5.
Crossref
Günther Zäpfel. 1991. Modern Production Concepts. Modern Production Concepts 18 45 .
J. Miltenburg, G. Steiner & S. Yeomans. (1990) A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems. Mathematical and Computer Modelling 13:3, pages 57-66.
Crossref
L.C. Lee. (1989) A Comparative Study of the Push and Pull Production Systems. International Journal of Operations & Production Management 9:4, pages 5-18.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.