28
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times

&
Pages 783-792 | Received 01 Dec 1987, Published online: 28 Mar 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

J.J. Liu, Z.A. Lin, Q.X. Chen, N. Mao & X.D. Chen. (2013) A decision support to assign mould due date at customer enquiry stage in computer-integrated manufacturing (CIM) environments. International Journal of Computer Integrated Manufacturing 26:6, pages 571-582.
Read now
M. X. Weng, Z. Wu, G. Qi & L. Zheng. (2008) Multi-agent-based workload control for make-to-order manufacturing. International Journal of Production Research 46:8, pages 2197-2213.
Read now
STEPHENR. LAWRENCE. (1995) Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions 27:5, pages 657-668.
Read now
IHSAN SABUNCUOGLU & DONL. HOMMERTZHEIM. (1995) Experimental investigation of an FMS due-date scheduling problem: an evaluation of due-date assignment rules. International Journal of Computer Integrated Manufacturing 8:2, pages 133-144.
Read now
HÜSEYIN SARPER. (1994) Evaluation of simple dispatching rules for dynamic single-machine earliness/tardiness problem. Production Planning & Control 5:2, pages 185-192.
Read now
G. D. SCUDDER, T. R. HOFFMANN & T. R. ROHLEDER. (1993) Scheduling with forbidden early shipments: alternative performance criteria and conditions. International Journal of Production Research 31:10, pages 2287-2305.
Read now
THOMASR. ROHLEDER & GARYD. SCUDDER. (1992) Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives. International Journal of Production Research 30:1, pages 129-140.
Read now
STEFKAP. STOEVA. (1990) A due date-based dispatching rule for flexible manufacturing systems. International Journal of Production Research 28:11, pages 1991-1999.
Read now
DAVIDP. CHRISTY & JOHNJ. KANET. (1990) Manufacturing systems with forbidden early shipment: implications for choice of scheduling rules. International Journal of Production Research 28:1, pages 91-100.
Read now

Articles from other publishers (20)

Seda Özcan, Bengü Sevil Oflaç, Sinem Tokcaer & Özgür Özpeynirci. (2023) Mastering timely deliveries using dynamic capabilities: perspectives from logistics service providers and shippers. The International Journal of Logistics Management.
Crossref
Aria Shahsavar, J. Kiarash Sadeghi, Jeff Shockley & Divesh Ojha. (2021) On the relationship between lean scheduling and economic performance in shipbuilding: A proposed model and comparative evaluation. International Journal of Production Economics 239, pages 108202.
Crossref
Steven Harrod & John J. Kanet. (2013) Applying work flow control in make-to-order job shops. International Journal of Production Economics 143:2, pages 620-626.
Crossref
I Sabuncuoglu & A Comlekci. (2002) Operation-based flowtime estimation in a dynamic job shop. Omega 30:6, pages 423-442.
Crossref
W. Rocky Newman & Mary Jo Maffei. (1999) Managing the job shop: simulating the effects of flexibility, order release mechanisms and sequencing rules. Integrated Manufacturing Systems 10:5, pages 266-275.
Crossref
Bor-Yuh Leu & Fu-Kwun Wang. (1999) A simulation study of sequencing heuristics in a cellular flexible assembly system with hybrid order shipment environments. Simulation Practice and Theory 7:1, pages 31-46.
Crossref
Ziaul Huq. (1999) Conventional shop control procedures to approximate JIT inventory performance in a job shop. Journal of Manufacturing Systems 18:3, pages 161-174.
Crossref
Nabil N. Gindy & Sameh M. Saad. (1998) Flexibility and responsiveness of machining environments. Integrated Manufacturing Systems 9:4, pages 218-227.
Crossref
S.T. Enns. (1998) Lead time selection and the behaviour of work flow in job shops. European Journal of Operational Research 109:1, pages 122-136.
Crossref
Bor-Yuh Leu. (2016) Simulation Analysis of Scheduling Heuristics in a Flow-Line Manufacturing Cell with Two Types of Order Shipment Environments. SIMULATION 66:2, pages 106-116.
Crossref
Thomas R. Rohleder & Gary D. Scudder. (1995) Information inaccuracy: Implications for economic production scheduling. International Journal of Production Economics 42:1, pages 51-66.
Crossref
Bor‐Yuh Leu & John W. Nazemetz. (1995) Comparative analysis of group scheduling heuristics in a flow shop cellular system. International Journal of Operations & Production Management 15:9, pages 143-157.
Crossref
Stephen R. Lawrence. (1994) Negotiating due-dates between customers and producers. International Journal of Production Economics 37:1, pages 127-138.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1994) Due-date assignment and early/tardy scheduling on identical parallel machines. Naval Research Logistics 41:1, pages 17-32.
Crossref
THOMAS R. ROHLEDER & GARY SCUDDER. (1993) A COMPARISON OF ORDER‐RELEASE AND DISPATCH RULES FOR THE DYNAMIC WEIGHTED EARLY/TARDY PROBLEM. Production and Operations Management 2:3, pages 221-238.
Crossref
Ihsan Sabuncuoglu & Don L. Hommertzheim. (1993) Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing Systems 5:4, pages 301-323.
Crossref
Prabuddha De, Jay B. Ghosh & Charles E. Wells. (1993) Delivery time quotation and order processing with forbidden early shipments. Computers & Operations Research 20:4, pages 381-390.
Crossref
Imtiaz Ahmed & Warren W. Fisher. (2007) Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling*. Decision Sciences 23:3, pages 633-647.
Crossref
Farzad Mahmoodi, Kevin J. Dooley & Patrick J. Starr. (2002) An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system. Journal of Operations Management 9:4, pages 548-573.
Crossref
Gary D. Scudder, Dwight E. Smith‐Daniels & Thomas Rohleder. (2002) Use of the net present value criterion in a random job shop where early shipments are forbidden. Journal of Operations Management 9:4, pages 526-547.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.