28
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times

&
Pages 783-792 | Received 01 Dec 1987, Published online: 28 Mar 2007

REFERENCES

  • BAKER , K. R. , 1984a , The effects of input control in a simple scheduling model . Journal of Operations Management , 4 , 99 – 112 .
  • BAKER , K. R. , 1984 b , Sequencing rules and due–date assignments in a job shop . Management Science , 30 , 1093 – 1104 .
  • BAKER , K. R. , and BERTRAND , J. W. M. , 1981 a , An investigation of due date assignment rules with constrained tightness . Journal of Operations Management , 1 , 109 – 120 .
  • BAKER , K. R. , and BERTRAND , J. W. M. , 1981 b , A comparison of due–date selection rules . AIIE Transactions , 13 , 123 – 131 .
  • BAKER , K. R. , and KANET , J. J. , 1983 , Job shop scheduling with modified due dates . Journal of Operations Management , 4 , 11 – 22 .
  • BOOKBINDER , J. H. , and NOOR , A. I. , 1985 , Setting job–shop due–dates with service–level constraints . Journal of the Operational Research Society , 36 ( 11 ).
  • Capacity Planning and Operation Sequencing System–Extended , 1977 , Publication GH12–5119–0 (IBM Corporation , White Plains , New York ), pp. 16 – 17 .
  • CONWAY , R. W. , MAXWELL , W. L. , and MILLER , L. W. , 1967 , Theory of Scheduling ( Reading , MA Addison–Wesley ).
  • Communications Oriented Production InformationControl System , 1978 , Volume V ( G320–1978 ), chapter 6 Manufacturing Activity Planning ( IBM Corporation, White Plains , New York ), pp. 19 – 20 ,
  • HALL , N. G. , 1986 , Production problems with deadline penalities . International Journal of Production Research , 24 , 1383 – 1394 .
  • KANET , J. J. , 1981 , Designing lead times for MRP inventory management systems . Proceedings of the Academy of Management , pp. 327 – 331 .
  • KANET , J. J. , 1986 , Load limited order release in job shop scheduling systems . Working Paper,Clemson University College of Commerce and Industry .
  • KANET , J. J. , and CHRISTY , D. P. , 1984 , Manufacturing systems with forbidden early order departure . International Journal of Production Research , 22 , 41 – 50 .
  • MONDEN , YASUHIRO , 1983 , Toyota Production System ( Norcross , GA Industrial Engineering and Management Press ).
  • RAGATZ , G. L. , and MABERT , V. A. , 1984 , A framework for the study of due date management in job shops . International Journal of Production Research , 22 , 685 – 695 .
  • SEIDMANN , A. , and SMITH , M. L. , 1981 , Due date assignment for production systems . Management Science , 27 , 571 – 581 .
  • SMITH , M. L. , and SEIDMANN , A. , 1983 , Due–date selection procedures for job–shop simulation system . Computers and Industrial Engineering , 7 , 199 – 207 .
  • WEEKS , J. K. , 1978 , Optimizing planned lead times and delivery dates . American Production and Inventory Control Society 21st Annual Conference Proceedings , 177 – 188 .
  • WEEKS , J. K. , 1979 , A simulation study of predictable due dates . Management Science , 25 , 363 – 373 .
  • WIGHT , O. W. , 1970 , Input/output control a real handle on lead time . Production and Inventory Management , 11 , 9 – 31 .
  • WILSON , H. G. , and MARDIS , B. J. , 1983 , Modifying job sequencing rules for work–in–process inventory reduction . HE Transactions , 15 , 320 – 323 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.