Marco A. B. Candido & Paulo Cesar Brochonski. (2023) AN INTELLIGENT SCHEDULING SYSTEM FOR SMT ASSEMBLY LINES. AN INTELLIGENT SCHEDULING SYSTEM FOR SMT ASSEMBLY LINES.
P. Ji & M. T. Sze. (2023) Mathematical Formulation of the Component Assignment Problem in PCB Assembly Lines. Mathematical Formulation of the Component Assignment Problem in PCB Assembly Lines.
Jiang-Ping Huang, Quan-Ke Pan, M Fatih Tasgetiren & Ying-Ying Huang. (2020) A New Heuristic for PCBs Grouping Problem with Setup Times. A New Heuristic for PCBs Grouping Problem with Setup Times.
Swarup Bhunia & Mark Tehranipoor. 2019. Hardware Security. Hardware Security
81
105
.
Vijay Pandey, Akshaye Malhotra, Rajeev Kant & Sudip Kumar Sahana. 2019. Advances in Swarm Intelligence. Advances in Swarm Intelligence
243
253
.
Byung-Cheon Choi & Myoung-Ju Park. (2016) A Batch Scheduling Problem with Two Agents. Asia-Pacific Journal of Operational Research 32:06, pages 1550044.
Crossref
Sungyeol Yu. (2015) Scheduling of Production Process with Setup Cost depending Job Sequence. Management & Information Systems Review 34:2, pages 67-78.
Crossref
Sungyeol Yu. (2010) Integer Programming Model to the Travelling Salesman Problems with Route Dependent Travel Cost. Management & Information Systems Review 29:4, pages 109-121.
Crossref
Rolando Quintana & Mark T. Leung. 2010. Advances in Business and Management Forecasting. Advances in Business and Management Forecasting
183
206
.
Vahid Aminzadeh, Helge Wurdemann, Jian S. Dai, John Reed & Graham Purnell. (2010) A new algorithm for pick‐and‐place operation. Industrial Robot: An International Journal 37:6, pages 527-531.
Crossref
Cumhur A. Gelogullari & Rasaratnam Logendran. (2009) Group-scheduling problems in electronics manufacturing. Journal of Scheduling 13:2, pages 177-202.
Crossref
Nilanjan D. Choudhury, Wilbert E. Wilhelm, Brijesh Rao, Jonathan Gott & Nikhilesh Khotekar. (2007) Process planning for circuit card assembly on a series of dual head placement machines. European Journal of Operational Research 182:2, pages 626-639.
Crossref
K. Salonen, J. Smed, M. Johnsson & O. Nevalainen. (2006) Grouping and sequencing PCB assembly jobs with minimum feeder setups. Robotics and Computer-Integrated Manufacturing 22:4, pages 297-305.
Crossref
Bülent Çatay, Asoo J. Vakharia & S. Selçuk Erengüç. (2005) Printed circuit board scheduling in an openshop manufacturing environment. The International Journal of Advanced Manufacturing Technology 29:9-10, pages 980-989.
Crossref
Ihsan Onur Yilmaz & Hans-Otto Günther. 2006. Operations Research Proceedings 2005. Operations Research Proceedings 2005
143
148
.
R. Narayanaswami & V. Iyengar. (2004) Setup reduction in printed circuit board assembly by efficient sequencing. The International Journal of Advanced Manufacturing Technology 26:3, pages 276-284.
Crossref
Serge Lambert, Georges Abdulnour, Jocelyn Drolet & Bernard Cyr. (2005) Flexibility analysis of a surface mount technology electronic assembly plant: An integrated model using simulation. International Journal of Flexible Manufacturing Systems 17:2, pages 151-167.
Crossref
C.S Rabak & J.S Sichman. (2003) Using A-Teams to optimize automatic insertion of electronic components. Advanced Engineering Informatics 17:2, pages 95-106.
Crossref
K.P. Ellis, L.F. McGinnis & J.C. Ammons. (2003) An approach for grouping circuit cards into families to minimize assembly time on a placement machine. IEEE Transactions on Electronics Packaging Manufacturing 26:1, pages 22-30.
Crossref
Wei‐Shing Chen & Chiuh‐Cheng Chyu. (2002) Reduction of printed circuit board group assembly time through the consideration of efficiency loss of placement time. Assembly Automation 22:4, pages 360-370.
Crossref
YU-AN LI & SABAH RANDHAWA. (2002) COMPONENT TO MULTI-TRACK FEEDER ASSIGNMENT AND BOARD SEQUENCING IN PRINTED CIRCUIT BOARD ASSEMBLY. Journal of Electronics Manufacturing 11:01, pages 51-68.
Crossref
P. Ji, M.T. Sze & W.B. Lee. (2001) A genetic algorithm of determining cycle time for printed circuit board assembly lines. European Journal of Operational Research 128:1, pages 175-184.
Crossref
Barouch Matzliach & Michal Tzur. (2000) Storage management of items in two levels of availability. European Journal of Operational Research 121:2, pages 363-379.
Crossref
Weihsin Wang, P.C. Nelson & T.M. Tirpak. (1999) Optimization of high-speed multistation SMT placement machines using evolutionary algorithms. IEEE Transactions on Electronics Packaging Manufacturing 22:2, pages 137-146.
Crossref
Dan Braha & Oded MaimonDan Braha & Oded Maimon. 1998. A Mathematical Theory of Design: Foundations, Algorithms and Applications. A Mathematical Theory of Design: Foundations, Algorithms and Applications
321
352
.
Serge Lambert, Bernard Cyr, Georges AbdulNour & Jocelyn Drolet. (1997) Comparison study of scheduling rules and set-up policies for a SMT production line. Computers & Industrial Engineering 33:1-2, pages 369-372.
Crossref
K. Raj Kumar & T.T. Narendran. (1997) A heuristic for sequencing PCBs with due‐dates. International Journal of Operations & Production Management 17:5, pages 446-467.
Crossref
Haomin Li & Ratnesh Kumar. 1996. Manufacturing Decision Support Systems. Manufacturing Decision Support Systems
217
237
.
Ronald G. Askin, Moshe Dror & Asoo J. Vakharia. (1994) Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell. Naval Research Logistics 41:5, pages 587-608.
Crossref
O. Felix Offodile, Abraham Mehrez & John Grznar. (1994) Cellular manufacturing: A taxonomic review framework. Journal of Manufacturing Systems 13:3, pages 196-220.
Crossref
J.C. Ammons, W.M. Carlyle, G.W. DePuy, K.P. Ellis, L.F. McGinnis, C.A. Tovey & H. Xu. (1993) Computer-aided process planning in printed circuit card assembly. IEEE Transactions on Components, Hybrids, and Manufacturing Technology 16:4, pages 370-376.
Crossref
J.C. Ammons, M. Carlyle, G.W. DePuy, K.P. Ellis, L.F. McGinnis, C.A. Tovey & H. Xu. (1992) Computer Aided Process Planning In Printed Circuit Card Assembly. Computer Aided Process Planning In Printed Circuit Card Assembly.