137
Views
118
CrossRef citations to date
0
Altmetric
Original Articles

Schedules for a two-stage hybrid flowshop with parallel machines at the second stage

&
Pages 1489-1502 | Received 12 Jun 1990, Published online: 27 Apr 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (22)

Shijin Wang, Xiaodong Wang & Li Yu. (2020) Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times. International Journal of Systems Science: Operations & Logistics 7:3, pages 291-307.
Read now
Xin Feng, Feifeng Zheng & Yinfeng Xu. (2016) Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times. International Journal of Production Research 54:12, pages 3706-3717.
Read now
Shijin Wang & Ming Liu. (2014) Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objective tabu search method. International Journal of Production Research 52:5, pages 1495-1508.
Read now
Andrea Rossi, Alessio Puppato & Michele Lanzetta. (2013) Heuristics for scheduling a two-stage hybrid flow shop with parallel batching machines: application at a hospital sterilisation plant. International Journal of Production Research 51:8, pages 2363-2376.
Read now
Hao Luo, George Q. Huang, Ying Feng Zhang & Qing Yun Dai. (2011) Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows. International Journal of Production Research 49:6, pages 1575-1603.
Read now
Jiafu Tang & Jiwei Song. (2010) Discrete particle swarm optimisation combined with no-wait algorithm in stages for scheduling mill roller annealing process. International Journal of Computer Integrated Manufacturing 23:11, pages 979-991.
Read now
Jaehwan Yang. (2010) A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines. International Journal of Production Research 48:5, pages 1531-1538.
Read now
Xinggang Luo, Wei Li, Yiliu Tu, Deyi Xue & Jiafu Tang. (2010) Optimal resource allocation for hybrid flow shop in one-of-a-kind production. International Journal of Computer Integrated Manufacturing 23:2, pages 146-154.
Read now
Chao-Tang Tseng & Ching-Jong Liao. (2008) A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks. International Journal of Production Research 46:17, pages 4655-4670.
Read now
Renzo Akkerman, Dirk Pieter Van Donk & Gerard Gaalman. (2007) Influence of capacity- and time-constrained intermediate storage in two-stage food production systems. International Journal of Production Research 45:13, pages 2955-2973.
Read now
S.-W. Choi, Y.-D. Kim & G.-C. Lee. (2005) Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop. International Journal of Production Research 43:11, pages 2149-2167.
Read now
T. Yang , Y. Kuo & I. Chang. (2004) Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors — a case study. International Journal of Production Research 42:19, pages 4015-4030.
Read now
Wei Wang & JohnL. Hunsucker. (2004) MAKESPAN DISTRIBUTIONS IN FLOW SHOPS WITH MULTIPLE PROCESSORS. Journal of the Chinese Institute of Industrial Engineers 21:3, pages 242-250.
Read now
Wei Wang & JohnL. Hunsucker. (2003) AN EVALUATION OF THE CDS HEURISTIC IN FLOW SHOPS WITH MULTIPLE PROCESSORS. Journal of the Chinese Institute of Industrial Engineers 20:3, pages 295-304.
Read now
David He & Astghik Babayan. (2002) Scheduling manufacturing systems for delayed product differentiation in agile manufacturing. International Journal of Production Research 40:11, pages 2461-2481.
Read now
H. TSUBONE∗, M. OHBA & T. UETAKE. (1996) The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop. International Journal of Production Research 34:11, pages 3037-3053.
Read now
A. G. P. GUINET & M. M. SOLOMON. (1996) Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time. International Journal of Production Research 34:6, pages 1643-1654.
Read now
A. GUINET, M.M. SOLOMON, P.K. KEDIA & A. DUSSAUCHOY. (1996) A computational study of heuristics for two-stage flexible flowshops. International Journal of Production Research 34:5, pages 1399-1415.
Read now
D. L. Santos, J. L. Hunsucker & D. E. Deal. (1995) FLOWMULT: Permutation Sequences for Flow Shops with Multiple Processors. Journal of Information and Optimization Sciences 16:2, pages 351-366.
Read now
T. J. SAWIK. (1995) Scheduling flexible flow lines with no in-process buffers. International Journal of Production Research 33:5, pages 1357-1367.
Read now
HOLGER LUCZAK & BURKHARD SALLMANN. (1995) Downtime analysis for automatic moulding plants. International Journal of Production Research 33:2, pages 319-332.
Read now

Articles from other publishers (96)

Sanchit Singh, Subhash C. Sarin & Ming Cheng. (2024) Single-lot, lot-streaming problem for a 1 + m hybrid flow shop. Journal of Global Optimization.
Crossref
Lotfi Hidri. (2023) Effective Two-Phase Heuristic and Lower Bounds for Multi-Stage Flexible Flow Shop Scheduling Problem with Unloading Times. Symmetry 15:11, pages 2005.
Crossref
Yarong Chen, Ya-Chih Tsai & Fuh-Der Chou. (2023) An Evaluation of Mathematical Programming and Lower-Bound Methods for Hybrid Flow Shop Problems With a Makespan Criterion. IEEE Access 11, pages 41368-41386.
Crossref
Sina Aghakhani & Mohammad Sadra Rajabi. (2022) A New Hybrid Multi-Objective Scheduling Model for Hierarchical Hub and Flexible Flow Shop Problems. AppliedMath 2:4, pages 721-737.
Crossref
Shiegheun Koh, Wonchul Seo & Sangwoun Kim. (2021) Two-Stage Non-Identical Parallel Machine Scheduling with Genetic Algorithm. Journal of the Korean Institute of Industrial Engineers 47:1, pages 1-10.
Crossref
David García-Menéndez, Henar Morán-Palacios, Francisco Ortega-Fernández & Marina Díaz-Piloñeta. (2020) Scheduling in Continuous Steelmaking Casting: A Systematic Review. ISIJ International 60:6, pages 1097-1107.
Crossref
Jianming Dong, Ruyan Jin, Taibo Luo & Weitian Tong. (2020) A polynomial-time approximation scheme for an arbitrary number of parallel two-stage flow-shops. European Journal of Operational Research 281:1, pages 16-24.
Crossref
Jianming Dong, Ruyan Jin, Jueliang Hu & Guohui Lin. (2018) A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops. Journal of Combinatorial Optimization 37:2, pages 668-684.
Crossref
Weitian Tong, Eiji Miyano, Randy Goebel & Guohui Lin. (2018) An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops. Theoretical Computer Science 734, pages 24-31.
Crossref
Ming-Chih Hsiao & Ling-Huey Su. (2018) Scheduling of hybrid types of machines with two-machine flowshop as the first type and a single machine as the second type. IOP Conference Series: Materials Science and Engineering 311, pages 012008.
Crossref
Weiya Zhong & Yun Shi. (2017) Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility. Journal of Combinatorial Optimization 35:1, pages 108-125.
Crossref
Yingcong Tan & Daria Terekhov. 2018. Advances in Artificial Intelligence. Advances in Artificial Intelligence 60 71 .
Mostafa Zandieh, Seyed Mojtaba Sajadi & Reza Behnoud. (2017) Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach. International Journal of System Assurance Engineering and Management 8:S2, pages 1630-1642.
Crossref
Jianming Dong, Weitian Tong, Taibo Luo, Xueshi Wang, Jueliang Hu, Yinfeng Xu & Guohui Lin. (2017) An FPTAS for the parallel two-stage flowshop problem. Theoretical Computer Science 657, pages 64-72.
Crossref
Ming Cheng, Subhash C. Sarin & Sanchit Singh. (2015) Two-stage, single-lot, lot streaming problem for a $$1+2$$ 1 + 2 hybrid flow shop. Journal of Global Optimization 66:2, pages 263-290.
Crossref
Weitian Tong, Eiji Miyano, Randy Goebel & Guohui Lin. 2016. Frontiers in Algorithmics. Frontiers in Algorithmics 227 237 .
Weiya Zhong & Zhi-Long Chen. (2014) Flowshop scheduling with interstage job transportation. Journal of Scheduling 18:4, pages 411-422.
Crossref
Chatnugrob Sangsawang, Kanchana Sethanan, Takahiro Fujimoto & Mitsuo Gen. (2015) Metaheuristics optimization approaches for two-stage reentrant flexible flow shop with blocking constraint. Expert Systems with Applications 42:5, pages 2395-2410.
Crossref
Jaehwan Yang. (2015) Hybrid Flow Shop with Parallel Machines at the First Stage and Dedicated Machines at the Second Stage. Industrial Engineering and Management Systems 14:1, pages 22-31.
Crossref
Arezoo Jafari & Ali Elyasi. (2015) Minimizing the number of tardy jobs in a dynamic flexible flow shop. Minimizing the number of tardy jobs in a dynamic flexible flow shop.
Min Dai, Dunbing Tang, Haitao Zhang & Jun Yang. (2014) Energy-aware scheduling model and optimization for a flexible flow shop problem. Energy-aware scheduling model and optimization for a flexible flow shop problem.
Wei-ya Zhong & Long-hua Lv. (2014) Hybrid Flowshop Scheduling with Interstage Job Transportation. Journal of the Operations Research Society of China 2:1, pages 109-121.
Crossref
Byungsoo Na, Shabbir Ahmed, George Nemhauser & Joel Sokol. (2013) A cutting and scheduling problem in float glass manufacturing. Journal of Scheduling 17:1, pages 95-107.
Crossref
Maryam Ashrafi, Hamid Davoudpour & Mohammad Abbassi. 2014. Handbook of Research on Novel Soft Computing Intelligent Algorithms. Handbook of Research on Novel Soft Computing Intelligent Algorithms 538 567 .
Anna Rotondo, Paul Young, John Geraghty, Stefan Heilmayer & Can Sun. (2014) Simulation-based Decision Support Tools for Demand Disaggregation in a Supply Chain Characterised by High Routing Flexibility. Procedia CIRP 25, pages 261-268.
Crossref
Hamid Allaoui & Abdelhakim Artiba. 2014. Essays in Production, Project Planning and Scheduling. Essays in Production, Project Planning and Scheduling 277 299 .
Ren Ju, Zhang Yaoxue & Chen Jianer. (2013) Analysis on the Scheduling Problem in Transparent Computing. Analysis on the Scheduling Problem in Transparent Computing.
Byungsoo Na, Shabbir Ahmed, George Nemhauser & Joel Sokol. (2013) Optimization of automated float glass lines. International Journal of Production Economics 145:2, pages 561-572.
Crossref
Tsui-Ping Chung & Ching-Jong Liao. (2013) An immunoglobulin-based artificial immune system for solving the hybrid flow shop problem. Applied Soft Computing 13:8, pages 3729-3736.
Crossref
M. Fadaei & M. Zandieh. (2013) Scheduling a Bi-Objective Hybrid Flow Shop with Sequence-Dependent Family Setup Times Using Metaheuristics. Arabian Journal for Science and Engineering 38:8, pages 2233-2244.
Crossref
Shijin Wang & Ming Liu. (2013) A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem. Computers & Operations Research 40:4, pages 1064-1075.
Crossref
Alessandro Condotta, Sigrid Knust, Dimitri Meier & Natalia V. Shakhlevich. (2013) Tabu search and lower bounds for a combined production–transportation problem. Computers & Operations Research 40:3, pages 886-900.
Crossref
M. Mirabi, S. M. T. Fatemi Ghomi & F. Jolai. (2011) A two-stage hybrid flowshop scheduling problem in machine breakdown condition. Journal of Intelligent Manufacturing 24:1, pages 193-199.
Crossref
Parinya Kaweegitbundit. (2013) Memetic Algorithm Approach to Two-Stage Hybrid Flow Shop Scheduling Problem with Identical Parallel Machines. Advanced Materials Research 651, pages 548-552.
Crossref
Ming Cheng & Subhash C. Sarin. (2013) Two-stage, Multiple-lot, Lot Streaming Problem for a 1 + 2 Hybrid Flow Shop. IFAC Proceedings Volumes 46:9, pages 448-453.
Crossref
Min Dai, Dunbing Tang, Kun Zheng & Qixiang Cai. (2015) An Improved Genetic-Simulated Annealing Algorithm Based on a Hormone Modulation Mechanism for a Flexible Flow-Shop Scheduling Problem. Advances in Mechanical Engineering 5, pages 124903.
Crossref
Hamilton Emmons & George VairaktarakisHamilton Emmons & George Vairaktarakis. 2013. Flow Shop Scheduling. Flow Shop Scheduling 161 187 .
Pedro Gómez-Gasquet, Carlos Andrés & Francisco-Cruz Lario. (2012) An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan. Expert Systems with Applications 39:9, pages 8095-8107.
Crossref
Xiandong Zhang & Steef van de Velde. (2012) Approximation algorithms for the parallel flow shop problem. European Journal of Operational Research 216:3, pages 544-552.
Crossref
Wenpeng Wang. (2011) Review on Hybrid Flow Shop Scheduling. Review on Hybrid Flow Shop Scheduling.
Xuanhao Zhou & Yong-Zai Lu. (2010) A new heuristic method combined with Lagrangian relaxation algorithm for Hybrid flow shop problem. A new heuristic method combined with Lagrangian relaxation algorithm for Hybrid flow shop problem.
Rubén Ruiz & José Antonio Vázquez-Rodríguez. (2010) The hybrid flow shop scheduling problem. European Journal of Operational Research 205:1, pages 1-18.
Crossref
Mourad Boudhar & Nadjat Meziani. (2010) Two‐stage hybrid flow shop with recirculation. International Transactions in Operational Research 17:2, pages 239-255.
Crossref
Hamid Davoudpour & Maryam Ashrafi. (2009) Solving multi-objective SDST flexible flow shop using GRASP algorithm. The International Journal of Advanced Manufacturing Technology 44:7-8, pages 737-747.
Crossref
Xie Xie & Lixin Tang. (2009) Analysis of a Heuristics for Scheduling Two-Stage Hybrid Flow Shop. Analysis of a Heuristics for Scheduling Two-Stage Hybrid Flow Shop.
Hyun-Seon Choi & Dong-Ho Lee. (2009) Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops. Computers & Industrial Engineering 56:1, pages 113-120.
Crossref
Yeong-Dae Kim, Byung-Jun Joo & Jong-Ho Shin. (2007) Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint. Journal of Heuristics 15:1, pages 19-42.
Crossref
Jiwei Song & Jiafu Tang. (2008) Scheduling model and discrete particle swarm optimization algorithm for roller annealing. Scheduling model and discrete particle swarm optimization algorithm for roller annealing.
C.S. Sung & Hyun Ah Kim. (2008) A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times. International Journal of Production Economics 113:2, pages 1038-1048.
Crossref
Chao-Tang Tseng, Ching-Jong Liao & Tai-Xiang Liao. (2008) A note on two-stage hybrid flowshop scheduling with missing operations. Computers & Industrial Engineering 54:3, pages 695-704.
Crossref
Chinyao Low, Chou-Jung Hsu & Chwen-Tzeng Su. (2008) A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines. Computers & Operations Research 35:3, pages 845-853.
Crossref
Jean‐Charles Billaut, Jacques Carlier, Emmanuel Néron & Antoine Oliver. 2008. Production Scheduling. Production Scheduling 233 269 .
Long-min He & Shi-jie Sun. (2007) A hybrid two-stage flexible flowshop scheduling problem with m identical parallel machines and a burn-in processor separately. Journal of Shanghai University (English Edition) 11:1, pages 33-38.
Crossref
Fatima Benbouzid-Sitayeb, Mourad Tirchi & Abid Mahloul. 2007. Bio-inspired Modeling of Cognitive Tasks. Bio-inspired Modeling of Cognitive Tasks 518 527 .
. 2007. Handbook on Scheduling. Handbook on Scheduling 271 320 .
M. Zandieh, S.M.T. Fatemi Ghomi & S.M. Moattar Husseini. (2006) An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation 180:1, pages 111-127.
Crossref
Rubén Ruiz & Concepción Maroto. (2006) A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research 169:3, pages 781-800.
Crossref
Tamás Kis & Erwin Pesch. (2005) A review of exact solution methods for the non-preemptive multiprocessor flowshop problem. European Journal of Operational Research 164:3, pages 592-608.
Crossref
Hong Wang. (2005) Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions. Expert Systems 22:2, pages 78-85.
Crossref
Orhan Engin & Alper Döyen. (2004) A new approach to solve hybrid flow shop scheduling problems by artificial immune system. Future Generation Computer Systems 20:6, pages 1083-1095.
Crossref
Hung-Tso Lin & Ching-Jong Liao. (2003) A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics 86:2, pages 133-143.
Crossref
H. Wang, V. Jacob & E. Rolland. (2003) Design of efficient hybrid neural networks for flexible flow shop scheduling. Expert Systems 20:4, pages 208-231.
Crossref
Z. H. JIN, K. OHNO, T. ITO & S. E. ELMAGHRABY. (2002) SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES*. Production and Operations Management 11:2, pages 216-230.
Crossref
N.E.H. Saadani, A. Guinet & M. Moalla. (2002) Three stages flow-shop with job over-passing. Three stages flow-shop with job over-passing.
J. M. García, K. Smith, S. Lozano & F. Guerrero. 2002. Hybrid Information Systems. Hybrid Information Systems 431 447 .
Emmanuel Néron, Philippe Baptiste & Jatinder N.D Gupta. (2001) Solving hybrid flow shop problem using energetic reasoning and global operations. Omega 29:6, pages 501-511.
Crossref
T. Ozen, D.W. Gu, I. Postlethwaite, W. Browne & L. Yao. (2001) Optimization of Soaking Pit/Rolling Mill Process at British Aluminium Plate. IFAC Proceedings Volumes 34:18, pages 369-374.
Crossref
Meral Azizoğlu, Ergin Çakmak & Suna Kondakci. (2001) A flexible flowshop problem with total flow time minimization. European Journal of Operational Research 132:3, pages 528-538.
Crossref
David He, Astghik Babayan & Andrew Kusiak. (2001) Scheduling manufacturing systems in an agile environment. Robotics and Computer-Integrated Manufacturing 17:1-2, pages 87-97.
Crossref
Jinliang Cheng, Yoshiyuki Karuno & Hiroshi Kise. (2001) A SHIFTING BOTTLENECK APPROACH FOR A PARALLEL-MACHINE FLOWSHOP SCHEDULING PROBLEM. Journal of the Operations Research Society of Japan 44:2, pages 140-156.
Crossref
Petra Schuurman & Gerhard J. Woeginger. (2000) A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem. Theoretical Computer Science 237:1-2, pages 105-122.
Crossref
Hitoshi Tsubone, Masahiko Suzuki, Toshifumi Uetake & Masaaki Ohba. (2007) A Comparison between Basic Cyclic Scheduling and Variable Cyclic Scheduling in a Two‐stage Hybrid Flow Shop. Decision Sciences 31:1, pages 197-222.
Crossref
Nathalie Grangeon, Alain Tanguy & Nikolay Tchernev. (1999) Generic simulation model for hybrid flow-shop. Computers & Industrial Engineering 37:1-2, pages 207-210.
Crossref
Richard Linn & Wei Zhang. (1999) Hybrid flow shop scheduling: A survey. Computers & Industrial Engineering 37:1-2, pages 57-61.
Crossref
Shaukat A Brah & Luan Luan Loo. (1999) Heuristics for scheduling in a flow shop with multiple processors. European Journal of Operational Research 113:1, pages 113-122.
Crossref
Shaukat A. Brah & Gloria E. Wheeler. (2016) Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation. SIMULATION 71:5, pages 302-311.
Crossref
Leo Lopez, Michael W. Carter & Michel Gendreau. (1998) The hot strip mill production scheduling problem: A tabu search approach. European Journal of Operational Research 106:2-3, pages 317-335.
Crossref
W. Huang & S. Li. (1998) A two-stage hybrid flowshop with uniform machines and setup times. Mathematical and Computer Modelling 27:2, pages 27-45.
Crossref
Shanling Li. (1997) A hybrid two-stage flowshop with part family, batch production, major and minor set-ups. European Journal of Operational Research 102:1, pages 142-156.
Crossref
Mohamed Haouari & Rym M'Hallah. (1997) Heuristic algorithms for the two-stage hybrid flowshop problem. Operations Research Letters 21:1, pages 43-53.
Crossref
Wanzhen Huang & Shanling Li. (1997) A two-stage hybrid with uniform machines and setup times. A two-stage hybrid with uniform machines and setup times.
A. Vignier, P. Commandeur & C. Proust. (1997) New lower bound for the hybrid flowshop scheduling problem. New lower bound for the hybrid flowshop scheduling problem.
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1997. Produktionsplanung. Produktionsplanung 279 446 .
D.L. Santos, J.L. Hunsucker & D.E. Deal. (1996) An evaluation of sequencing heuristics in flow shops with multiple processors. Computers & Industrial Engineering 30:4, pages 681-691.
Crossref
A. Vignier, D. Dardilhac, D. Dezalay & C. Proust. (1996) A branch and bound approach to minimize the total completion time in a k-stage hybrid flowshop. A branch and bound approach to minimize the total completion time in a k-stage hybrid flowshop.
Oscar Ciro Lopez, Ricardo M. Barcia & Osama Eyada. (1995) Problema de programação da produção um esquema de classificação. Production 5:2, pages 145-168.
Crossref
Toshifumi Uetake, Hitoshi Tsubone & Masaaki Ohba. (1995) A production scheduling system in a hybrid flow shop. International Journal of Production Economics 41:1-3, pages 395-398.
Crossref
D.L. Santos, J.L. Hunsucker & D.E. Deal. (1995) Global lower bounds for flow shops with multiple processors. European Journal of Operational Research 80:1, pages 112-120.
Crossref
Chung-Yee Lee & George L. Vairaktarakis. (1994) Minimizing makespan in hybrid flowshops. Operations Research Letters 16:3, pages 149-158.
Crossref
Jatinder N.D. Gupta & Enar A. Tunc. (1994) Scheduling a two-stage hybrid flowshop with separable setup and removal times. European Journal of Operational Research 77:3, pages 415-428.
Crossref
A. Guinet, R. Foulon & A. Dussauchoy. (1994) Scheduling Jobs on Hybrid Flowshops to Minimize Maximum Tardiness. IFAC Proceedings Volumes 27:4, pages 245-249.
Crossref
J.L. Hunsucker & J.R. Shah. (1994) Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment. European Journal of Operational Research 72:1, pages 102-114.
Crossref
Bo Chen & Vitaly A. Strusevich. (1993) Worst-case analysis of heuristics for open shops with parallel machines. European Journal of Operational Research 70:3, pages 379-390.
Crossref
H Tsubone, M Ohba, H Takamuki & Y Miyake. (1993) A production scheduling system for a hybrid flow shop—a case study. Omega 21:2, pages 205-214.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1993. Produktionsplanung. Produktionsplanung 249 410 .
Stefan Voß. 1993. Operations Research in Production Planning and Control. Operations Research in Production Planning and Control 336 352 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.