Halenur Soysal-Kurt, Selçuk Kürşat İşleyen & Hadi Gökçen. (2024) Balancing and sequencing of mixed-model parallel robotic assembly lines considering energy consumption. Flexible Services and Manufacturing Journal.
Crossref
Arnd Huchzermeier & Tobias Mönch. (2023) Mixed‐model assembly lines with variable takt and open stations. Production and Operations Management 32:3, pages 704-722.
Crossref
Lorenzo Tiacci. (2022) Buffer allocation vs. sequencing optimization: which of the two is most effective to improve the efficiency of assembly lines?. IFAC-PapersOnLine 55:10, pages 452-457.
Crossref
Peter Bebersdorf & Arnd HuchzermeierPeter Bebersdorf & Arnd Huchzermeier. 2022. Variable Takt Principle. Variable Takt Principle
91
132
.
Celso Gustavo Stall Sikora. (2021) Benders’ decomposition for the balancing of assembly lines with stochastic demand. European Journal of Operational Research 292:1, pages 108-124.
Crossref
Peter Bebersdorf & Arnd HuchzermeierPeter Bebersdorf & Arnd Huchzermeier. 2021. Variabler Takt. Variabler Takt
101
145
.
Eiji MORINAGA, Takumi NAKAMURAHidefumi WAKAMATSU. (2020) Efficient Method for Solving Integrated Planning Problem of Sequence and Part Delivery in Mixed-Model Production Systems混流生産における投入順序・部品搬送統合化計画問題の効率的解法. Journal of Smart Processing 9:5, pages 237-244.
Crossref
F. Tanhaie, M. Rabbani & N. Manavizadeh. (2020) Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a Make-To-Order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm. OPSEARCH 57:2, pages 320-346.
Crossref
Thiago Cantos Lopes, Celso Gustavo Stall Sikora, Adalberto Sato Michels & Leandro Magatão. (2017) Mixed-model assembly lines balancing with given buffers and product sequence: model, formulation comparisons, and case study. Annals of Operations Research 286:1-2, pages 475-500.
Crossref
Simon Emde & Lukas Polten. (2019) Sequencing assembly lines to facilitate synchronized just-in-time part supply. Journal of Scheduling 22:6, pages 607-621.
Crossref
Daniel Alejandro Rossit, Fernando Tohmé & Mariano Frutos. (2019) An Industry 4.0 approach to assembly line resequencing. The International Journal of Advanced Manufacturing Technology 105:9, pages 3619-3630.
Crossref
Gökhan Seçme & Lale Özbakır. (2019) An Assembly Line Balancing Application on Oven Production Line with Hyper-Heuristics. International Journal of Operations Research and Information Systems 10:3, pages 44-58.
Crossref
Shi-jun Yang & Ling Zhao. 2019. Proceeding of the 24th International Conference on Industrial Engineering and Engineering Management 2018. Proceeding of the 24th International Conference on Industrial Engineering and Engineering Management 2018
3
12
.
Jens Buergin, Sina Helming, Jan Andreas, Philippe Blaettchen, Yannick Schweizer, Frank Bitte, Benjamin Haefner & Gisela Lanza. (2018) Local order scheduling for mixed-model assembly lines in the aircraft manufacturing industry. Production Engineering 12:6, pages 759-767.
Crossref
Thiago Cantos Lopes, Adalberto Sato Michels, Celso Gustavo Stall Sikora, Rafael Gobbi Molina & Leandro Magatão. (2018) Balancing and cyclically sequencing synchronous, asynchronous, and hybrid unpaced assembly lines. International Journal of Production Economics 203, pages 216-224.
Crossref
Lorenzo Tiacci & Mario Mimmi. (2018) Integrating ergonomic risks evaluation through OCRA index and balancing/sequencing decisions for mixed model stochastic asynchronous assembly lines. Omega 78, pages 112-138.
Crossref
Hui Sun & Shujin Fan. (2018) Car sequencing for mixed-model assembly lines with consideration of changeover complexity. Journal of Manufacturing Systems 46, pages 93-102.
Crossref
Logan Reed Vallandingham, Jo Wessel Strandhagen, Erlend Alfnes & Jan Ola Strandhagen. 2018. Advanced Manufacturing and Automation VII. Advanced Manufacturing and Automation VII
229
237
.
Aya ISHIGAKI & Tomoyuki MIYASHITA. (2016) Development of search method for sequencing problem in mixed-model assembly lines. Journal of Advanced Mechanical Design, Systems, and Manufacturing 10:3, pages JAMDSM0048-JAMDSM0048.
Crossref
Ibrahim Kucukkoc & David Z Zhang. (2015) Integrating ant colony and genetic algorithms in the balancing and scheduling of complex assembly lines. The International Journal of Advanced Manufacturing Technology 82:1-4, pages 265-285.
Crossref
Ibrahim Kucukkoc & David Z. Zhang. (2014) Mathematical model and agent based solution approach for the simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines. International Journal of Production Economics 158, pages 314-333.
Crossref
Fei YIN, Haruki MATSUURA & Akiko ASADA. (2014) <b>Promoting Flexibility in the Mixed-model Assembly Line by Introducing </b><b>Bu</b>ff<b>er Stocks </b>. Innovation and Supply Chain Management 8:2, pages 66-73.
Crossref
Farzad Tahriri, Siti Zawiah Md Dawal & Zahari Taha. (2014) Fuzzy Mixed Assembly Line Sequencing and Scheduling Optimization Model Using Multiobjective Dynamic Fuzzy GA. The Scientific World Journal 2014, pages 1-20.
Crossref
Farzad Tahriri, Siti Zawiah Md Dawal & Zahari Taha. (2014) Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model. Journal of Applied Mathematics 2014, pages 1-19.
Crossref
A. Seleim & H. ElMaraghy. (2014) Parametric analysis of Mixed-Model Assembly Lines using max-plus algebra. CIRP Journal of Manufacturing Science and Technology 7:4, pages 305-314.
Crossref
Alper Hamzadayi & Gokalp Yildiz. (2013) A simulated annealing algorithm based approach for balancing and sequencing of mixed-model U-lines. Computers & Industrial Engineering 66:4, pages 1070-1084.
Crossref
Yunsook Hong, John K. Visich, Peter A. Pinto & Basheer M. Khumawala. (2013) Evaluation of mixed‐model U‐line operational designs. International Transactions in Operational Research 20:6, pages 917-936.
Crossref
Mohsen Salehi, Parviz Fattahi, Abdolreza Roshani & Javad Zahiri. (2012) Multi-criteria sequencing problem in mixed-model synchronous assembly lines. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 983-993.
Crossref
N. Manavizadeh, A. Hasani Goodarzi, M. Rabbani & F. Jolai. (2013) Order acceptance/rejection policies in determining the sequence in mixed model assembly lines. Applied Mathematical Modelling 37:4, pages 2531-2551.
Crossref
L. Zeltzer, V. Limère, E.-H. Aghezzaf & H. Van Landeghem. (2013) Balancing Mixed-Model Assembly Lines in Real World Complex Workstations. IFAC Proceedings Volumes 46:9, pages 1714-1719.
Crossref
Şükran Şeker, Mesut Özgürler & Mehmet Tanyaş. (2013) A Weighted Multiobjective Optimization Method for Mixed-Model Assembly Line Problem. Journal of Applied Mathematics 2013, pages 1-10.
Crossref
Shusaku Hiraki, Zhuqi Xu & Shaolan Yang. 2013. LTLGB 2012. LTLGB 2012
481
487
.
Jun-Young Jo & Yeo-Keun Kim. (2012) An Endosymbiotic Evolutionary Algorithm for Balancing and Sequencing in Mixed-Model Two-Sided Assembly Lines. Journal of the Korean Operations Research and Management Science Society 37:3, pages 39-55.
Crossref
Alper Hamzadayi & Gokalp Yildiz. (2012) A genetic algorithm based approach for simultaneously balancing and sequencing of mixed-model U-lines with parallel workstations and zoning constraints. Computers & Industrial Engineering 62:1, pages 206-215.
Crossref
Masoud Rabbani, Farzad Radmehr & Neda Manavizadeh. (2010) Considering the conveyer stoppages in sequencing mixed-model assembly lines by a new fuzzy programming approach. The International Journal of Advanced Manufacturing Technology 54:5-8, pages 775-788.
Crossref
Seyed Mohamad Javad Mirzapour Al-e-hashem, Mir Bahador Aryanezhad & Armin Jabbarzadeh. (2010) A new approach to solve a mixed-model assembly line with a bypass subline sequencing problem. The International Journal of Advanced Manufacturing Technology 52:9-12, pages 1053-1066.
Crossref
Jaime Cano-Belmán, Roger Z. Ríos-Mercado & Joaquín Bautista. (2009) A scatter search based hyper-heuristic for sequencing a mixed-model assembly line. Journal of Heuristics 16:6, pages 749-770.
Crossref
Lothar März, Hansjörg Tutsch, Stefan Auer & Wilfried Sihn. 2010. Advanced Manufacturing and Sustainable Logistics. Advanced Manufacturing and Sustainable Logistics
408
419
.
Parviz Fattahi & Mohsen Salehi. (2009) Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval. The International Journal of Advanced Manufacturing Technology 45:9-10, pages 987-998.
Crossref
Iraj Mahdavi, Babak Javadi, Navid Sahebjamnia & Nezam Mahdavi-Amiri. (2009) A two-phase linear programming methodology for fuzzy multi-objective mixed-model assembly line problem. The International Journal of Advanced Manufacturing Technology 44:9-10, pages 1010-1023.
Crossref
Yibin Li, Rongqiu Chen & Yin Zhang. (2009) Three Feasible Manners for Combined BTS&BTO Production Mode in Motors Industry. Three Feasible Manners for Combined BTS&BTO Production Mode in Motors Industry.
Liliana Capacho, Rafael Pastor, Alexander Dolgui & Olga Guschinskaya. (2007) An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem. Journal of Heuristics 15:2, pages 109-132.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2009) Sequencing mixed-model assembly lines: Survey, classification and model critique. European Journal of Operational Research 192:2, pages 349-373.
Crossref
Masayuki MatsuiMasayuki Matsui. 2009. Manufacturing and Service Enterprise with Risks. Manufacturing and Service Enterprise with Risks
173
182
.
Babak Javadi, Alireza Rahimi-Vahed, Masoud Rabbani & Mostafa Dangchi. (2007) Solving a multi-objective mixed-model assembly line sequencing problem by a fuzzy goal programming approach. The International Journal of Advanced Manufacturing Technology 39:9-10, pages 975-982.
Crossref
Masoud Rabbani, Alireza Rahimi-Vahed & Seyed Ali Torabi. (2007) Real options approach for a mixed-model assembly line sequencing problem. The International Journal of Advanced Manufacturing Technology 37:11-12, pages 1209-1219.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) Sequencing mixed-model assembly lines to minimize part inventory cost. OR Spectrum 30:3, pages 611-633.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2008) Assembly line balancing: Which model to use when?. International Journal of Production Economics 111:2, pages 509-528.
Crossref
Alireza Rahimi-Vahed & Ali Hossein Mirzaei. (2007) A hybrid multi-objective shuffled frog-leaping algorithm for a mixed-model assembly line sequencing problem. Computers & Industrial Engineering 53:4, pages 642-666.
Crossref
A. R. Rahimi-Vahed, S. M. Mirghorbani & M. Rabbani. (2007) A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem. Soft Computing 11:10, pages 997-1012.
Crossref
Nils Boysen, Malte Fliedner & Armin Scholl. (2007) Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Elemente einer Hierarchischen PlanungHierarchical production planning of mixed-model assembly lines. Journal of Business Economics 77:7-8, pages 759-793.
Crossref
Yakup Kara, Ugur Ozcan & Ahmet Peker. (2006) An approach for balancing and sequencing mixed-model JIT U-lines. The International Journal of Advanced Manufacturing Technology 32:11-12, pages 1218-1231.
Crossref
Yakup Kara, Ugur Ozcan & Ahmet Peker. (2007) Balancing and sequencing mixed-model just-in-time U-lines with multiple objectives. Applied Mathematics and Computation 184:2, pages 566-588.
Crossref
A.R. Rahimi-Vahed, M. Rabbani, R. Tavakkoli-Moghaddam, S.A. Torabi & F. Jolai. (2007) A multi-objective scatter search for a mixed-model assembly line sequencing problem. Advanced Engineering Informatics 21:1, pages 85-99.
Crossref
Masoud Rabbani, Alireza Rahimi-Vahed, Babak Javadi & Reza Tavakkoli-Moghaddam. 2007. Operations Research Proceedings 2006. Operations Research Proceedings 2006
169
174
.
Alireza Rahimi-Vahed, Masoud Rabbani, Reza Tavakkoli-Moghaddam, Fariborz Jolai & Neda Manavizadeh. 2007. Operations Research Proceedings 2006. Operations Research Proceedings 2006
161
167
.
R. Tavakkoli-Moghaddam & A.R. Rahimi-Vahed. (2006) Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system. Applied Mathematics and Computation 181:2, pages 1471-1481.
Crossref
Yeo Keun Kim, Jae Yun Kim & Yeongho Kim. (2006) An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research 168:3, pages 838-852.
Crossref
Christian Becker & Armin Scholl. (2006) A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168:3, pages 694-715.
Crossref
R. Tavakkoli-Moghaddam & A.R. Rahimi-Vahed. (2006) A Memetic Algorithm for Multi-Criteria Sequencing Problem for a Mixed-Model Assembly Line in a JIT Production System. A Memetic Algorithm for Multi-Criteria Sequencing Problem for a Mixed-Model Assembly Line in a JIT Production System.
P.R. McMullen & Peter Tarasewich. (2005) A beam search heuristic method for mixed-model scheduling with setups. International Journal of Production Economics 96:2, pages 273-283.
Crossref
S.G Ponnambalam, P Aravindan & M Subba Rao. (2003) Genetic algorithms for sequencing problems in mixed model assembly lines. Computers & Industrial Engineering 45:4, pages 669-690.
Crossref
Joseph Bukchin, Ezey M. Dar-El & Jacob Rubinovitz. (2002) Mixed model assembly line design in a make-to-order environment. Computers & Industrial Engineering 41:4, pages 405-421.
Crossref
Robert Burdett & Erhan Kozan. 2002. Operations Research/Management Science at Work. Operations Research/Management Science at Work
21
40
.
G. Heike, M. Ramulu, E. Sorenson, P. Shanahan & K. Moinzadeh. (2001) Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry. International Journal of Production Economics 72:2, pages 103-120.
Crossref
Patrick R McMullen. (2001) A Kohonen self-organizing map approach to addressing a multiple objective, mixed-model JIT sequencing problem. International Journal of Production Economics 72:1, pages 59-71.
Crossref
R.L. Burdett & E. Kozan. (2006) Evolutionary algorithms for flowshop sequencing with non‐unique jobs. International Transactions in Operational Research 7:4-5, pages 401-418.
Crossref
B. Rekiek, P. De Lit & A. Delchambre. (2000) Designing mixed-product assembly lines. IEEE Transactions on Robotics and Automation 16:3, pages 268-280.
Crossref
G. Celano, A. Costa, S. Fichera & G. Perrone. (2000) Fuzzy scheduling of a flexible assembly line through an evolutionary algorithm. Fuzzy scheduling of a flexible assembly line through an evolutionary algorithm.
Takayoshi Tamura, Hong Long & Katsuhisa Ohno. (1999) A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline. International Journal of Production Economics 60-61, pages 557-564.
Crossref
Bhaba R. Sarker & Haixu Pan. (1998) Designing a mixed-model assembly line to minimize the costs of idle and utility times. Computers & Industrial Engineering 34:3, pages 609-628.
Crossref
Chul Ju Hyun, Yeongho Kim & Yeo Keun Kim. (1998) A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers & Operations Research 25:7-8, pages 675-690.
Crossref
Christoph Engel, Jürgen Zimmermann & Alfons Steinhoff. 1998. Beyond Manufacturing Resource Planning (MRP II). Beyond Manufacturing Resource Planning (MRP II)
307
331
.
Zhao Xiaobo & Katsuhisa Ohno. (1997) Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers & Industrial Engineering 32:1, pages 47-56.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1997. Produktionsplanung. Produktionsplanung
181
278
.
Shimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen WarneckeShimon Y. Nof, Wilbert E. Wilhelm & Hans-Jürgen Warnecke. 1997. Industrial Assembly. Industrial Assembly
312
349
.
Yeo Keun Kim, Chul Ju Hyun & Yeongho Kim. (1996) Sequencing in mixed model assembly lines: A genetic algorithm approach. Computers & Operations Research 23:12, pages 1131-1145.
Crossref
Comby Georges, Biennier Frédérique & Favrel Joël. (1995) Sequencing Mixed-Model Assembly Lines: A Multi-Criteria and Flexible Approach. IFAC Proceedings Volumes 28:24, pages 145-150.
Crossref
A. AGNETIS, R. MACCHIAROLI & D. PACCIARELLI. 1995. New Trends in Design of Control Systems 1994. New Trends in Design of Control Systems 1994
321
326
.
A. Agnetis, R. Macchiargli & D. Pacciarelli. (1994) Input Sequencing for Assembly Lines a Cutting Plane Algorithm. IFAC Proceedings Volumes 27:11, pages 321-326.
Crossref
Zhao Xiaobo & Katsuhisa Ohno. (1994) A sequencing problem for a mixed-model assembly line in a JIT production system. Computers & Industrial Engineering 27:1-4, pages 71-74.
Crossref
Wolfgang Domschke, Armin Scholl & Stefan VoßWolfgang Domschke, Armin Scholl & Stefan Voß. 1993. Produktionsplanung. Produktionsplanung
171
248
.
AMIYA K. CHAKRAVARTY & AVRAHAM SHTUB. (1992) THE EFFECT OF LEARNING ON THE OPERATION OF MIXED‐MODEL ASSEMBLY LINES. Production and Operations Management 1:2, pages 198-211.
Crossref