117
Views
59
CrossRef citations to date
0
Altmetric
Original Articles

Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion

&
Pages 1617-1635 | Received 01 Jul 1991, Published online: 08 Jul 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (17)

Yumin He & Milton L. Smith. (2024) Investigation of scheduling integration of flexible manufacturing systems for mass customisation. International Journal of Production Research 62:6, pages 2060-2082.
Read now
Yumin He & Kathryn E. Stecke. (2022) Simultaneous part input sequencing and robot scheduling for mass customisation. International Journal of Production Research 60:8, pages 2481-2496.
Read now
Chen Chen, Lee Kong Tiong & I-Ming Chen. (2019) Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system. International Journal of Production Research 57:10, pages 3003-3019.
Read now
Yumin He, Kathryn E. Stecke & Milton L. Smith. (2016) Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems. International Journal of Production Research 54:22, pages 6736-6746.
Read now
A. Gnanavel Babu, J. Jerald, A. Noorul Haq, V. Muthu Luxmi & T.P. Vigneswaralu. (2010) Scheduling of machines and automated guided vehicles in FMS using differential evolution. International Journal of Production Research 48:16, pages 4683-4699.
Read now
U. M. B. S. Sarma, Suman Kant, Rahul Rai & M. K. Tiwari. (2002) Modelling the machine loading problem of FMSs and its solution using a tabu-search-based heuristic. International Journal of Computer Integrated Manufacturing 15:4, pages 285-295.
Read now
R. Rai, S Kameshwaran & M. K. Tiwari. (2002) Machine-tool selection and operation allocation in FMS: Solving a fuzzy goal-programming model using a genetic algorithm. International Journal of Production Research 40:3, pages 641-665.
Read now
IHSAN SABUNCUOGLU & SULEYMAN KARABUK. (1998) A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Transactions 30:2, pages 179-191.
Read now
M. S. AKTURK & H. YILMAZ. (1996) Scheduling of Automated Guided Vehicles in a Decision Making Hierarchy. International Journal of Production Research 34:2, pages 577-591.
Read now
J. S. SHANG. (1995) Robust design and optimization of material handling in an FMS. International Journal of Production Research 33:9, pages 2437-2454.
Read now
DAEB. KIM, HARK HWANG & WANC. YOON. (1995) DEVELOPING A DISPATCHING RULE FOR AN AUTOMATED GUIDED VEHICLE SYSTEM USING A FUZZY MULTI-CRITERIA DECISION-MAKING METHOD. Engineering Optimization 24:1, pages 39-57.
Read now
IHSAN SABUNCUOGLU & DONL. HOMMERTZHEIM. (1995) Experimental investigation of an FMS due-date scheduling problem: an evaluation of due-date assignment rules. International Journal of Computer Integrated Manufacturing 8:2, pages 133-144.
Read now
CHUDA BASNET & JOEH. MIZE. (1994) Scheduling and control of flexible manufacturing systems: a critical review. International Journal of Computer Integrated Manufacturing 7:6, pages 340-355.
Read now
RAM RACHAMADUGU & KATHRYNE. STECKE. (1994) Classification and review of FMS scheduling procedures. Production Planning & Control 5:1, pages 2-20.
Read now
G. ULUSOY & Ü BILGE. (1993) Simultaneous scheduling of machines and automated guided vehicles. International Journal of Production Research 31:12, pages 2857-2873.
Read now
Lin Gong, Zijie Huang, Xi Xiang & Xin Liu. Real-time AGV scheduling optimisation method with deep reinforcement learning for energy-efficiency in the container terminal yard. International Journal of Production Research 0:0, pages 1-21.
Read now

Articles from other publishers (42)

Venkata Ranga Surya Prasad Alla, Nageswara Rao Medikondu, Prakash Babu Kanakavalli & Vijaya Prakash Ravulapalli. (2023) Design and development of mixed integer programming model for scheduling tasks through artificial intelligence. International Journal on Interactive Design and Manufacturing (IJIDeM) 18:2, pages 965-979.
Crossref
Yong Gui & Lanxin Zhang. (2023) Dynamic scheduling for job shop with machine failure based on data mining technologies. Kybernetes.
Crossref
N. Sivarami Reddy, M. Padma Lalitha, D. V. Ramamurthy & K. Prahlada Rao. (2022) Concurrent Scheduling of Machines and AGVS in Multi-Machine FMS with Alternative Routing Using Symbiotic Organisms Search Algorithm. Journal of Advanced Manufacturing Systems 22:03, pages 513-548.
Crossref
Yong Gui, Dunbing Tang, Haihua Zhu, Yi Zhang & Zequn Zhang. (2023) Dynamic scheduling for flexible job shop using a deep reinforcement learning approach. Computers & Industrial Engineering 180, pages 109255.
Crossref
Nageswara Rao Medikondu, Varakumari Samudrala, Sri Harsha Arigela & Venkata Kamesh Vinjamuri. 2023. Scheduling Algorithms for Information and Communication Systems [Working Title]. Scheduling Algorithms for Information and Communication Systems [Working Title].
Xingkai WANG, Weimin WU, Zichao XING, Tingqi ZHANG & Haoyi NIU. (2023) A look-ahead AGV scheduling algorithm with processing sequence conflict-free for a no-buffer assembly line. Journal of Advanced Mechanical Design, Systems, and Manufacturing 17:5, pages JAMDSM0063-JAMDSM0063.
Crossref
Martin Gutjahr, Hans Kellerer & Sophie N. Parragh. (2021) Heuristic approaches for scheduling jobs and vehicles in a cyclic flexible manufacturing system. Procedia Computer Science 180, pages 825-832.
Crossref
Meisu Zhong, Yongsheng Yang, Yasser Dessouky & Octavian Postolache. (2020) Multi-AGV scheduling for conflict-free path planning in automated container terminals. Computers & Industrial Engineering 142, pages 106371.
Crossref
Imanol Mugarza & Juan Carlos Mugarza. (2019) Towards Collision-Free Automated Guided Vehicles Navigation and Traffic Control. Towards Collision-Free Automated Guided Vehicles Navigation and Traffic Control.
Milica Petrović, Zoran Miljković & Aleksandar Jokić. (2019) A novel methodology for optimal single mobile robot scheduling using whale optimization algorithm. Applied Soft Computing 81, pages 105520.
Crossref
Cenk Sahin, Melek Demirtas, Rizvan Erol, Adil Baykasoğlu & Vahit Kaplanoğlu. (2015) A multi-agent based approach to dynamic scheduling with flexible processing capabilities. Journal of Intelligent Manufacturing 28:8, pages 1827-1845.
Crossref
Pankaj Sharma & Ajai Jain. (2016) Effect of routing flexibility and sequencing rules on performance of stochastic flexible job shop manufacturing system with setup times: Simulation approach. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 231:2, pages 329-345.
Crossref
Yi-Chi Wang, Toly Chen, Hsiangtsai Chiang & Hui-Chen Pan. (2016) A simulation analysis of part launching and order collection decisions for a flexible manufacturing system. Simulation Modelling Practice and Theory 69, pages 80-91.
Crossref
Chen Xie & Theodore T. Allen. (2015) Simulation and experimental design methods for job shop scheduling with material handling: a survey. The International Journal of Advanced Manufacturing Technology 80:1-4, pages 233-243.
Crossref
Wei Qin, Jie Zhang & Yinbin Sun. (2013) Multiple-objective scheduling for interbay AMHS by using genetic-programming-based composite dispatching rules generator. Computers in Industry 64:6, pages 694-707.
Crossref
Wei Qin, Jie Zhang & Yinbin Sun. (2013) Dynamic dispatching for interbay material handling by using modified Hungarian algorithm and fuzzy-logic-based control. The International Journal of Advanced Manufacturing Technology 67:1-4, pages 295-309.
Crossref
Rizvan Erol, Cenk Sahin, Adil Baykasoglu & Vahit Kaplanoglu. (2012) A multi-agent based approach to dynamic scheduling of machines and automated guided vehicles in manufacturing systems. Applied Soft Computing 12:6, pages 1720-1732.
Crossref
You Long Lv, Gong Zhang, Jie Zhang & Yi Jun Dong. (2011) Integrated Scheduling of the Job and AGV for Flexible Manufacturing System. Applied Mechanics and Materials 80-81, pages 1335-1339.
Crossref
Mayank K. Pandey. 2011. Evolutionary Computing in Advanced Manufacturing. Evolutionary Computing in Advanced Manufacturing 95 121 .
Yun Qing Rao, Meng Chang Wang & Kun Peng Wang. (2011) JIT Single Vehicle Scheduling in a Mixed-Model Assembly Line. Advanced Materials Research 211-212, pages 770-774.
Crossref
L.H. Wu, P.Y. Mok & J. Zhang. (2011) An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems. Computers in Industry 62:2, pages 175-186.
Crossref
Mohammed Ali & Wasif Ullah Khan. (2017) Implementation Issues of AGVs in Flexible Manufacturing System : A Review. Global Journal of Flexible Systems Management 11:1-2, pages 55-61.
Crossref
A. Caumond, P. Lacomme, A. Moukrim & N. Tchernev. (2009) An MILP for scheduling problems in an FMS with one vehicle. European Journal of Operational Research 199:3, pages 706-722.
Crossref
Tauseef Aized. (2009) Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods. Computers & Industrial Engineering 57:3, pages 822-831.
Crossref
Key K. Lee. (2008) Fuzzy rule generation for adaptive scheduling in a dynamic manufacturing environment. Applied Soft Computing 8:4, pages 1295-1304.
Crossref
V Kumar, S Kumar, M K Tiwari & F Chan. (2008) Performance evaluation of flexible manufacturing systems under uncertain and dynamic situations. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 222:7, pages 915-934.
Crossref
Ghada El Khayat, André Langevin & Diane Riopel. (2006) Integrated production and material handling scheduling using mathematical programming and constraint programming. European Journal of Operational Research 175:3, pages 1818-1832.
Crossref
B. S. P. Reddy & C. S. P. Rao. (2006) A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS. The International Journal of Advanced Manufacturing Technology 31:5-6, pages 602-613.
Crossref
Ümit Bilge, Gökçe Esenduran, Nebibe Varol, Zeynep Öztürk, Burcu Aydın & Aysun Alp. (2006) Multi-attribute responsive dispatching strategies for automated guided vehicles. International Journal of Production Economics 100:1, pages 65-75.
Crossref
Rahul Swarnkar & M.K. Tiwari. (2004) Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and simulated annealing-based heuristic approach. Robotics and Computer-Integrated Manufacturing 20:3, pages 199-209.
Crossref
F T S Chan. (2016) Evaluation of combined dispatching and routeing strategies for a flexible manufacturing system. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 216:7, pages 1033-1046.
Crossref
JoséA. Ventura & Chulung Lee. (2001) A study of the tandem loop with multiple vehicles configuration for automated guided vehicle systems. Journal of Manufacturing Systems 20:3, pages 153-165.
Crossref
Kripa Shanker & Bimal K. Modi. (1999) A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment. European Journal of Operational Research 113:1, pages 80-90.
Crossref
P. Lacomme, N. Tchernev & C. Chu. (1999) An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport. An efficient framework for job input sequencing and vehicle dispatching in a flexible manufacturing system based on AGV transport.
Mingyuan Chen. (1996) A mathematical programming model for AGVS planning and control in manufacturing systems. Computers & Industrial Engineering 30:4, pages 647-658.
Crossref
T. Sawik. (1996) A multilevel machine and vehicle scheduling in a flexible manufacturing system. Mathematical and Computer Modelling 23:7, pages 45-57.
Crossref
Edward A. Ross, Farzad Mahmoodi & Charles T. Mosier. (2007) Tandem Configuration Automated Guided Vehicle Systems: A Comparative Study*. Decision Sciences 27:1, pages 81-102.
Crossref
Jim Lee. (2016) Composite Dispatching Rules for Multiple-Vehicle AGV Systems. SIMULATION 66:2, pages 121-130.
Crossref
R. Lau & J. Favrel. (1995) On-off scheduling. On-off scheduling.
T. Sawik. (1995) Dispatching scheduling of machines and vehicles in a flexible manufacturing system. Dispatching scheduling of machines and vehicles in a flexible manufacturing system.
Mohamed Ben-Daya. 1995. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology. Flexible Manufacturing Systems: Recent Developments - Reference for Modern Instrumentation, Techniques, and Technology 113 139 .
Ihsan Sabuncuoglu & Don L. Hommertzheim. (1993) Experimental investigation of an FMS due-date scheduling problem: Evaluation of machine and AGV scheduling rules. International Journal of Flexible Manufacturing Systems 5:4, pages 301-323.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.