Xiaoyu Wen, Xiaonan Lian, Yunjie Qian, Yuyan Zhang, Haoqi Wang & Hao Li. (2022) Dynamic scheduling method for integrated process planning and scheduling problem with machine fault. Robotics and Computer-Integrated Manufacturing 77, pages 102334.
Crossref
Ayoub Tighazoui, Christophe Sauvey & Nathalie Sauer. (2021) Predictive-reactive strategy for identical parallel machine rescheduling. Computers & Operations Research 134, pages 105372.
Crossref
Ayoub Tighazoui, Christophe Sauvey & Nathalie Sauer. (2021) Minimizing the Total Weighted Waiting Times and Instability in a Rescheduling Problem with Dynamic Jobs Weight. Applied Sciences 11:15, pages 7040.
Crossref
Ayoub Tighazoui, Christophe Sauvey & Nathalie Sauer. (2021) Predictive-reactive Strategy for Flowshop Rescheduling Problem: Minimizing the Total Weighted Waiting Times and Instability. Journal of Systems Science and Systems Engineering 30:3, pages 253-275.
Crossref
Jinsong Liu, Dong Yu, Yi Hu, Haoyu Yu, Wuwei He & Lipeng Zhang. (2021) CNC Machine Tool Fault Diagnosis Integrated Rescheduling Approach Supported by Digital Twin-Driven Interaction and Cooperation Framework. IEEE Access 9, pages 118801-118814.
Crossref
Yuanyuan Li, Stefano Carabelli, Edoardo Fadda, Daniele Manerba, Roberto Tadei & Olivier Terzo. (2020) Machine learning and optimization for production rescheduling in Industry 4.0. The International Journal of Advanced Manufacturing Technology 110:9-10, pages 2445-2463.
Crossref
Zhen Wang, Jihui Zhang & Jianfei Si. 2020. Proceedings of 2019 Chinese Intelligent Automation Conference. Proceedings of 2019 Chinese Intelligent Automation Conference
664
671
.
Xinyu Li & Liang GaoXinyu Li & Liang Gao. 2020. Effective Methods for Integrated Process Planning and Scheduling. Effective Methods for Integrated Process Planning and Scheduling
429
453
.
Zhuopu Hou, Hairong Dong, Shigen Gao, Gemma Nicholson, Lei Chen & Clive Roberts. (2019) Energy-Saving Metro Train Timetable Rescheduling Model Considering ATO Profiles and Dynamic Passenger Flow. IEEE Transactions on Intelligent Transportation Systems 20:7, pages 2774-2785.
Crossref
Le Liu. (2019) Outsourcing and rescheduling for a two-machine flow shop with the disruption of new arriving jobs: A hybrid variable neighborhood search algorithm. Computers & Industrial Engineering 130, pages 198-221.
Crossref
Nathália Cristina Ortiz da Silva, Cassius Tadeu Scarpin, José Eduardo PécoraJr.Jr. & Angel Ruiz. (2019) Online single machine scheduling with setup times depending on the jobs sequence. Computers & Industrial Engineering 129, pages 251-258.
Crossref
Matheus Leusin, Enzo Frazzon, Mauricio Uriona Maldonado, Mirko Kück & Michael Freitag. (2018) Solving the Job-Shop Scheduling Problem in the Industry 4.0 Era. Technologies 6:4, pages 107.
Crossref
Luca Urciuoli. (2018) An algorithm for improved ETAs estimations and potential impacts on supply chain decision making. Procedia Manufacturing 25, pages 185-193.
Crossref
Iwona Lapunka, Iwona Pisz & Piotr Wittbrodt. 2018. International Joint Conference SOCO’17-CISIS’17-ICEUTE’17 León, Spain, September 6–8, 2017, Proceeding. International Joint Conference SOCO’17-CISIS’17-ICEUTE’17 León, Spain, September 6–8, 2017, Proceeding
348
358
.
Miguel A. Salido, Joan Escamilla, Federico Barber & Adriana Giret. (2017) Rescheduling in job-shop problems for sustainable manufacturing systems. Journal of Cleaner Production 162, pages S121-S132.
Crossref
Hao Xia, Xinyu Li & Liang Gao. (2016) A hybrid genetic algorithm with variable neighborhood search for dynamic integrated process planning and scheduling. Computers & Industrial Engineering 102, pages 99-112.
Crossref
Nina Sundstrom & Bengt Lennartson. (2016) Rescheduling affected operations - a purely predictive approach. Rescheduling affected operations - a purely predictive approach.
Dieter Armbruster, Michael Herty, Xinping Wang & Lindu Zhao. (2015) Integrating release and dispatch policies in production models. Networks & Heterogeneous Media 10:3, pages 511-526.
Crossref
Günther Schuh, Till Potente & Annika Hauptvogel. (2014) Methodology for the Evaluation of Forecast Reliability of Production Planning Systems. Procedia CIRP 17, pages 469-474.
Crossref
Le Liu & Hong Zhou. (2013) On the identical parallel-machine rescheduling with job rework disruption. Computers & Industrial Engineering 66:1, pages 186-198.
Crossref
Ya-qin Zhou, Bei-zhi Li, Jian-guo Yang & Peng Yang. 2013. Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012). Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012)
117
125
.
Y F Wang, Y Zhang & J Y H Fuh. (2011) Job rescheduling by exploring the solution space of process planning for machine breakdown/arrival problems. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 225:2, pages 282-296.
Crossref
Jürgen Kuster, Dietmar Jannach & Gerhard Friedrich. (2008) Applying Local Rescheduling in response to schedule disruptions. Annals of Operations Research 180:1, pages 265-282.
Crossref
Sheng Su & Haijie Yu. (2010) Multiplant Cooperative Rescheduling Considering Makespan and Stability. Multiplant Cooperative Rescheduling Considering Makespan and Stability.
Jürgen Kuster, Dietmar Jannach & Gerhard Friedrich. (2008) Extending the RCPSP for modeling and solving disruption management problems. Applied Intelligence 31:3, pages 234-253.
Crossref
Y. F. Wang, Y. F. Zhang, J. Y. H. Fuh, Z. D. Zhou, P. Lou & L. G. Xue. (2008) An integrated approach to reactive scheduling subject to machine breakdown. An integrated approach to reactive scheduling subject to machine breakdown.
T. N. Wong, C.W. Leung & H.P. Tang. (2008) A multi-agent system framework for manufacturing planning and control. A multi-agent system framework for manufacturing planning and control.
W. Xiang & H.P. Lee. (2008) Ant colony intelligence in multi-agent dynamic manufacturing scheduling. Engineering Applications of Artificial Intelligence 21:1, pages 73-85.
Crossref
Pejman Hassanzadeh & Valerie Maier-Speredelozzi. (2008) Dynamic flexibility metrics for capability and capacity. International Journal of Flexible Manufacturing Systems 19:3, pages 195-216.
Crossref
Tauseef Aized, Koji Takahashi & Ichiro Hagiwara. (2007) Advanced Multiple Product Flexible Manufacturing System Modelling Using Coloured Petri Net. Journal of Advanced Computational Intelligence and Intelligent Informatics 11:6, pages 715-723.
Crossref
Tauseef Aized, Koji Takahashi & Ichiro Hagiwara. (2007) Modeling and performance optimization of multiple product FMS using colored Petri net and response surface methods. Modeling and performance optimization of multiple product FMS using colored Petri net and response surface methods.
Jurgen Kuster, Dietmar Jannach & Gerhard Friedrich. (2007) Local Rescheduling - A Novel Approach for Efficient Response to Schedule Disruptions. Local Rescheduling - A Novel Approach for Efficient Response to Schedule Disruptions.
Hsing-Pei Kao, Brian Wang, James Dong & Kuo-Cheng Ku. (2006) An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling. Computers in Industry 57:5, pages 379-397.
Crossref
Haldun Aytug, Mark A. Lawley, Kenneth McKay, Shantha Mohan & Reha Uzsoy. (2005) Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161:1, pages 86-110.
Crossref
W. Dangelmaier, K. Mahajan, D. Huber & B. Mueck. (2005) A Two-tier Method for Evaluating Alternative Policies to Support Interactive Analysis of 3D Material Flow Simulations. A Two-tier Method for Evaluating Alternative Policies to Support Interactive Analysis of 3D Material Flow Simulations.
Frank Schwartz & Stefan Voß. (2004) Störungsmanagement in der Produktion — Simulationsstudien für ein hybrides FließfertigungssystemManagement of Disruptions in Production Systems — A Simulation Study for a Hybrid Production Environment. Zeitschrift für Planung & Unternehmenssteuerung 15:4, pages 427-447.
Crossref
Nicholas G. Hall & Chris N. Potts. (2004) Rescheduling for New Orders. Operations Research 52:3, pages 440-453.
Crossref
C.S. Chong, Appa Iyer Sivakumar & R. Gay. (2003) Simulation-based scheduling for dynamic discrete manufacturing. Simulation-based scheduling for dynamic discrete manufacturing.
Benjamin P.-C Yen. (2002) Communication infrastructure in distributed scheduling. Computers & Industrial Engineering 42:2-4, pages 149-161.
Crossref
Hoda A. ElMaraghy & Tarek Y. ElMekkawy. (2002) Deadlock-free Rescheduling in Flexible Manufacturing Systems. CIRP Annals 51:1, pages 371-374.
Crossref
Heng Li, Zhicheng Li, Ling X. Li & Bin Hu. (2000) A production rescheduling expert simulation system. European Journal of Operational Research 124:2, pages 283-293.
Crossref
Guilherme E. Vieira, Jeffrey W. Herrmann & Edward Lin. (2000) Predicting the performance of rescheduling strategies for parallel machine systems. Journal of Manufacturing Systems 19:4, pages 256-266.
Crossref
Jian Fang & Yugeng Xi. (1997) A rolling horizon job shop rescheduling strategy in the dynamic environment. The International Journal of Advanced Manufacturing Technology 13:3, pages 227-232.
Crossref
Yi-Ching Eric Li, Wade H. ShawJr.Jr. & Louis A. Martin-Vega. (1996) Flow-time performance of modified scheduling heuristics in a dynamic rescheduling environment. Computers & Industrial Engineering 31:1-2, pages 213-216.
Crossref