440
Views
56
CrossRef citations to date
0
Altmetric
Original Articles

An EMQ model in an imperfect production process

&
Pages 635-646 | Received 12 Apr 2008, Accepted 26 May 2009, Published online: 10 Mar 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (21)

Nan Zhang, Sen Tian, Bin Liu & Jun Zhang. (2023) Joint optimization of production lot-sizing and condition-based maintenance in an imperfect production process with dependent indicators. Quality Technology & Quantitative Management 20:4, pages 511-527.
Read now
Ya-Hui Lin, Yan-Chun Chen & Wen-Ying Wang. (2017) Optimal production model for imperfect process with imperfect maintenance, minimal repair and rework. International Journal of Systems Science: Operations & Logistics 4:3, pages 229-240.
Read now
Chang Wook Kang, Misbah Ullah, Biswajit Sarkar, Iftikhar Hussain & Rehman Akhtar. (2017) Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system. International Journal of Production Research 55:6, pages 1748-1766.
Read now
Andrea Chiarini. (2017) An adaptation of the EOQ formula for JIT quasi-pull system production. Production Planning & Control 28:2, pages 123-130.
Read now
R. Roy Chowdhury, S.K. Ghosh & K.S. Chaudhuri. (2015) The effect of imperfect production in an economic production lotsize model. International Journal of Management Science and Engineering Management 10:4, pages 288-296.
Read now
Ravi Shankar Kumar & A. Goswami. (2015) EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment. International Journal of Systems Science 46:8, pages 1486-1497.
Read now
A. Ben-Salem, A. Gharbi & A. Hajji. (2015) An Environmental Hedging Point Policy to control production rate and emissions in unreliable manufacturing systems. International Journal of Production Research 53:2, pages 435-450.
Read now
Om Prakash, A.R. Roy & A. Goswami. (2014) Stochastic manufacturing system with process deterioration and machine breakdown. International Journal of Systems Science 45:12, pages 2539-2551.
Read now
Bassem Bouslah, Ali Gharbi & Robert Pellerin. (2014) Joint production and quality control of unreliable batch manufacturing systems with rectifying inspection. International Journal of Production Research 52:14, pages 4103-4117.
Read now
Yu-Chung Tsao. (2014) A piecewise nonlinear model for a production system under maintenance, trade credit and limited warehouse space . International Journal of Production Research 52:10, pages 3052-3073.
Read now
Mohamed Ali Aloulou, Alexandre Dolgui & Mikhail Y. Kovalyov. (2014) A bibliography of non-deterministic lot-sizing models. International Journal of Production Research 52:8, pages 2293-2310.
Read now
Angus Jeang. (2014) An integrated determination of production quantity, product and process parameters. International Journal of Systems Science: Operations & Logistics 1:1, pages 3-17.
Read now
M.P. Biswal & S. Acharya. (2013) Multi-choice multi-objective mathematical programming model for integrated production planning: a case study. International Journal of Systems Science 44:9, pages 1651-1665.
Read now
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2013) Maximising profits for an EPQ model with unreliable machine and rework of random defective items. International Journal of Systems Science 44:3, pages 582-594.
Read now
Yu-Chung Tsao, Tsung-Hui Chen & Qin-Hong Zhang. (2013) Effects of maintenance policy on an imperfect production system under trade credit. International Journal of Production Research 51:5, pages 1549-1562.
Read now
B. Bouslah, A. Gharbi, R. Pellerin & A. Hajji. (2013) Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay. International Journal of Production Research 51:1, pages 264-280.
Read now
Shib Sankar Sana. (2012) Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. International Journal of Production Research 50:23, pages 6763-6774.
Read now
Chih-Hsiung Wang & W.C. Tsai. (2012) Determining the production lot size with a heuristic inspection policy for controlling the quality of input materials and products. International Journal of Systems Science 43:11, pages 2030-2039.
Read now
Monami Das Roy, Shib Sankar Sana & Kripasindhu Chaudhuri. (2012) An integrated producer–buyer relationship in the environment of EMQ and JIT production systems. International Journal of Production Research 50:19, pages 5597-5614.
Read now
Hong-Fwu Yu, Wen-Kai Hsu & Wen-Jui Chang. (2012) EOQ model where a portion of the defectives can be used as perfect quality. International Journal of Systems Science 43:9, pages 1689-1698.
Read now

Articles from other publishers (35)

Viswanath Jagadeesan, Thilagavathi Rajamanickam, Vladimira Schindlerova, Sreelakshmi Subbarayan & Robert Cep. (2023) A Study on Two-Warehouse Inventory Systems with Integrated Multi-Purpose Production Unit and Partitioned Rental Warehouse. Mathematics 11:18, pages 3986.
Crossref
Nan Zhang, Kaiquan Cai, Yingjun Deng & Jun Zhang. (2023) Determining the optimal production–maintenance policy of a parallel production system with stochastically interacted yield and deterioration. Reliability Engineering & System Safety 237, pages 109342.
Crossref
Falguni Mahato, Chandan Mahato & Gour Chandra Mahata. (2022) Sustainable optimal production policies for an imperfect production system with trade credit under different carbon emission regulations. Environment, Development and Sustainability 25:9, pages 10073-10099.
Crossref
Sourav Mahata & Bijoy Krishna Debnath. (2023) The impact of R&D expenditures and screening in an economic production rate (EPR) inventory model for a flawed production system with imperfect screening under an interval-valued environment. Journal of Computational Science 69, pages 102027.
Crossref
Waseem Sajjad, Misbah Ullah, Razaullah Khan & Mubashir Hayat. (2022) Developing a Comprehensive Shipment Policy through Modified EPQ Model Considering Process Imperfections, Transportation Cost, and Backorders. Logistics 6:3, pages 41.
Crossref
Akrem Dhahri, Ali Gharbi & Mustapha Ouhimmou. (2022) Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers. International Journal of Production Economics 245, pages 108383.
Crossref
Bijoy Kumar Shaw, Isha Sangal & Biswajit Sarkar. (2022) Reduction of greenhouse gas emissions in an imperfect production process under breakdown consideration. AIMS Environmental Science 9:5, pages 658-691.
Crossref
Biswajit Sarkar, Bablu Mridha, Sarla Pareek, Mitali Sarkar & Lakshmi Thangavelu. (2021) A flexible biofuel and bioenergy production system with transportation disruption under a sustainable supply chain network. Journal of Cleaner Production 317, pages 128079.
Crossref
Kuo-Lung Hou, H. M. Srivastava, Li-Chiao Lin & Shih-Fang Lee. (2021) The impact of system deterioration and product warranty on optimal lot sizing with maintenance and shortages backordered. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas 115:3.
Crossref
Júlio Barros, Paulo Cortez & M. Sameiro Carvalho. (2021) A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process. Operations Research Perspectives 8, pages 100192.
Crossref
Prerna Gautam, Sumit Maheshwari, Amrina Kausar & Chandra K. Jaggi. 2021. Advances in Interdisciplinary Research in Engineering and Business Management. Advances in Interdisciplinary Research in Engineering and Business Management 185 215 .
S. Ganesan & R. Uthayakumar. (2020) EPQ models for an imperfect manufacturing system considering warm-up production run, shortages during hybrid maintenance period and partial backordering. Advances in Industrial and Manufacturing Engineering 1, pages 100005.
Crossref
Mubashir Hayat, Bashir Salah, Misbah Ullah, Iftikhar Hussain & Razaullah Khan. (2020) Shipment Policy for an Economic Production Quantity Model Considering Imperfection and Transportation Cost. Sustainability 12:21, pages 8964.
Crossref
Bimal Kumar Sett, Bikash Koli Dey & Biswajit Sarkar. (2020) Autonomated Inspection Policy for Smart Factory—An Improved Approach. Mathematics 8:10, pages 1815.
Crossref
Aditi Khanna, Prerna Gautam, Biswajit Sarkar & Chandra K. Jaggi. (2020) Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO - Operations Research 54:2, pages 435-450.
Crossref
João N.C. Gonçalves, M. Sameiro Carvalho & Paulo Cortez. (2020) Operations research models and methods for safety stock determination: A review. Operations Research Perspectives 7, pages 100164.
Crossref
Chang Wook Kang, Misbah Ullah, Mitali Sarkar, Muhammad Omair & Biswajit Sarkar. (2019) A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders. Mathematics 7:5, pages 446.
Crossref
Bikash Dey, Biswajit Sarkar & Sarla Pareek. (2019) A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate. Mathematics 7:4, pages 328.
Crossref
Mahboobe Peymankar, Farzad Dehghanian, Yousef Ghiami & Mohammad Hassan Abolbashari. (2018) The effects of contractual agreements on the economic production quantity model with machine breakdown. International Journal of Production Economics 201, pages 203-215.
Crossref
Chang Wook Kang, Misbah Ullah & Biswajit Sarkar. (2017) Optimum ordering policy for an imperfect single-stage manufacturing system with safety stock and planned backorder. The International Journal of Advanced Manufacturing Technology 95:1-4, pages 109-120.
Crossref
Ata Allah Taleizadeh. (2017) A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. Annals of Operations Research 261:1-2, pages 303-337.
Crossref
Wang ChiuSingaSinga, Hsin-Mei Chen, Hong-Dar Lin & Peter ChiuYuan-ShyiYuan-Shyi. (2018) Optimization of an intra-supply chain system with unreliable production facility. Journal of Applied Engineering Science 16:2, pages 192-201.
Crossref
Chandra K. Jaggi, Prerna Gautam & Aditi Khanna. 2018. Handbook of Research on Promoting Business Process Improvement Through Inventory Control Techniques. Handbook of Research on Promoting Business Process Improvement Through Inventory Control Techniques 371 387 .
Biswajit Sarkar, Leopoldo Eduardo Cárdenas-Barrón, Mitali Sarkar & Moses Laksono Singgih. (2014) An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. Journal of Manufacturing Systems 33:3, pages 423-435.
Crossref
G. Lanza, N. Stricker & R. Moser. (2013) Concept of an intelligent production control for global manufacturing in dynamic environments based on rescheduling. Concept of an intelligent production control for global manufacturing in dynamic environments based on rescheduling.
Bassem Bouslah, Ali Gharbi & Robert Pellerin. (2013) Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system. International Journal of Production Economics 144:1, pages 143-156.
Crossref
Mitali Sarkar & Biswajit Sarkar. (2013) An economic manufacturing quantity model with probabilistic deterioration in a production system. Economic Modelling 31, pages 245-252.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2013) A mathematical model on EPQ for stochastic demand in an imperfect production system. Journal of Manufacturing Systems 32:1, pages 260-270.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2012) Three-layer supply chain – A production-inventory model for reworkable items. Applied Mathematics and Computation 219:2, pages 530-543.
Crossref
Brojeswar Pal, Shib Sankar Sana & Kripasindhu Chaudhuri. (2012) A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption. Economic Modelling 29:5, pages 1891-1898.
Crossref
R. Uthayakumar & M. Rameswari. (2012) An Economic Production Quantity Model for Defective Items with Trapezoidal type Demand Rate. Journal of Optimization Theory and Applications 154:3, pages 1055-1079.
Crossref
T. Chakraborty & B.C. Giri. (2012) Joint determination of optimal safety stocks and production policy for an imperfect production system. Applied Mathematical Modelling 36:2, pages 712-722.
Crossref
Nita H. Shah & Hardik Soni. (2011) A Multi-Objective Production Inventory Model with Backorder for Fuzzy Random Demand Under Flexibility and Reliability. Journal of Mathematical Modelling and Algorithms 10:4, pages 341-356.
Crossref
Gede Agus Widyadana, Leopoldo Eduardo Cárdenas-Barrón & Hui Ming Wee. (2011) Economic order quantity model for deteriorating items with planned backorder level. Mathematical and Computer Modelling 54:5-6, pages 1569-1575.
Crossref
Shib Sankar Sana. (2011) A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems 50:2, pages 539-547.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.