143
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

A genetic algorithm-based optimal resource-constrained scheduling simulation model

Pages 131-141 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (7)

Gopinath Selvam & T. Ch. Madhavi Tadepalli. (2019) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management 0:0, pages 1-10.
Read now
Ming Lu, Jing Liu & Wenying Ji. (2017) Formalizing a path-float-based approach to determine and interpret total float in project scheduling analysis. International Journal of Construction Management 17:4, pages 251-263.
Read now
Atilla Damci & Gul Polat. (2014) Impacts of different objective functions on resource leveling in construction projects: a case study. Journal of Civil Engineering and Management 20:4, pages 537-547.
Read now
Jin-Lee Kim. (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics 31:1, pages 3-19.
Read now
Liu Shu‐Shun & Kuo‐Chuan Shih. (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics 27:9, pages 857-869.
Read now
Alaattin Kanoglu & Yeliz Sezgin. (2004) Solution to the Problem of Inaccurate Duration-Estimation: Relational Database Model for Design/Build Organizations. Architectural Science Review 47:3, pages 263-274.
Read now

Articles from other publishers (12)

Cristiano Saad Travassos do Carmo & Elisa Dominguez Sotelino. (2023) Planejamento para o imprevisto em projetos de construção: uma revisão. Brazilian Journal of Production Engineering 9:4, pages 107-130.
Crossref
Omer Giran, Rasim Temur & Gebrail Bekdaş. (2017) Resource constrained project scheduling by harmony search algorithm. KSCE Journal of Civil Engineering 21:2, pages 479-487.
Crossref
Houxian Zhang & Zhaolan Yang. (2017) Large-Scale Network Plan Optimization Using Improved Particle Swarm Optimization Algorithm. Mathematical Problems in Engineering 2017, pages 1-15.
Crossref
A. Azadeh, S. M. Asadzadeh & S. Tadayoun. (2014) Optimization of operator allocation in a large multi product assembly shop through unique integration of simulation and genetic algorithm. The International Journal of Advanced Manufacturing Technology 76:1-4, pages 471-486.
Crossref
Zahir Irani & Muhammad Mustafa Kamal. (2014) Intelligent Systems Research in the Construction Industry. Expert Systems with Applications 41:4, pages 934-950.
Crossref
Atilla Damci, David Arditi & Gul Polat. (2013) Resource Leveling in Line-of-Balance Scheduling. Computer-Aided Civil and Infrastructure Engineering 28:9, pages 679-692.
Crossref
S. Thomas Ng, Daisy X.M. Zheng & Jessie Z. Xie. (2013) Allocation of construction resources through a pull‐driven approach. Construction Innovation 13:1, pages 77-97.
Crossref
Ashraf Elazouni & Mohammad Abido. (2011) Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio. Automation in Construction 20:7, pages 755-766.
Crossref
M. A. AbidoAshraf M. Elazouni. (2011) Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio. Journal of Computing in Civil Engineering 25:1, pages 85-97.
Crossref
Hoi-Ching Lam & Ming Lu. (2008) Simulation-based, optimized scheduling of limited bar-benders over multiple building sites. Simulation-based, optimized scheduling of limited bar-benders over multiple building sites.
Hong Zhang, Heng Li & C.M. Tam. (2004) Fuzzy discrete‐event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management 11:6, pages 426-437.
Crossref
Peng-Yi Wang & Ming Lu. (2002) Genetic algorithm optimized resource activity critical path method. Genetic algorithm optimized resource activity critical path method.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.