Problems causing delays in major construction projects in Thailand

&
Pages 395-408 | Received 11 Jun 2007, Accepted 09 Jan 2008, Published online: 01 Sep 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (30)

Onur Selcuk, Harun Turkoglu, Gul Polat & Miklós Hajdu. (2024) An integrative literature review on the causes of delays in construction projects: evidence from developing countries. International Journal of Construction Management 24:6, pages 610-622.
Read now
Aaditya Pratap Sanyal & Shankha Pratim Bhattacharya. (2024) A comparative analysis between CBR based prediction models and MRA models for high-rise construction delay prediction. International Journal of Construction Management 24:2, pages 124-136.
Read now
Jon Lerche, Søren Lindhard, Peter Enevoldsen, Hasse H. Neve, Dan Eggert Møller, Emil L. Jacobsen, Jochen Teizer & Søren Wandahl. (2023) Causes of delay in offshore wind turbine construction projects. Production Planning & Control 34:15, pages 1513-1526.
Read now
Mundher M. Alsamarraie & Farid Ghazali. (2023) Evaluation of organizational procurement performance for public construction projects: systematic review. International Journal of Construction Management 23:14, pages 2499-2508.
Read now
Muhammad Ayat, Hafeezur Rehman, Sheheryar Mohsin Qureshi & Chang Wook Kang. (2023) Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management 23:11, pages 1856-1866.
Read now
Abbas Hassan, Khaled El-Rayes & Mohamed Attalla. (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management 23:9, pages 1447-1456.
Read now
Ali A. Shash & Fahad M. AbuAlnaja. (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management 23:7, pages 1109-1117.
Read now
C. S. R. Perera & S. Gunatilake. (2022) Value chain management in Sri Lankan construction industry: contractor’s perspective. International Journal of Construction Management 22:16, pages 3137-3147.
Read now
Muizz O. Sanni-Anibire, Rosli Mohamad Zin & Sunday Olusanya Olatunji. (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management 22:11, pages 2134-2143.
Read now
Jeffrey Boon Hui Yap, Kai Yee Lee, Timothy Rose & Martin Skitmore. (2022) Corruption in the Malaysian construction industry: investigating effects, causes, and preventive measures. International Journal of Construction Management 22:8, pages 1525-1536.
Read now
Muizz O. Sanni-Anibire, Rosli Mohamad Zin & Sunday Olusanya Olatunji. (2022) Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management 22:8, pages 1395-1407.
Read now
Md Aslam Hossain, Dinmukhambet Raiymbekov, Abid Nadeem & Jong Ryeol Kim. (2022) Delay causes in Kazakhstan’s construction projects and remedial measures. International Journal of Construction Management 22:5, pages 801-819.
Read now
Jeffrey Boon Hui Yap & Kamran Shavarebi. (2022) Enhancing project delivery performances in construction through experiential learning and personal constructs: competency development. International Journal of Construction Management 22:3, pages 436-452.
Read now
Jeffrey Boon Hui Yap, Kamran Shavarebi & Martin Skitmore. (2021) Capturing and reusing knowledge: analysing the what, how and why for construction planning and control. Production Planning & Control 32:11, pages 875-888.
Read now
Amílcar Arantes & Luis Miguel D. F. Ferreira. (2021) A methodology for the development of delay mitigation measures in construction projects. Production Planning & Control 32:3, pages 228-241.
Read now
Mohamed Saad Bajjou & Anas Chafi. (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management 20:7, pages 783-800.
Read now
Reshma Mary Johnson & Robin Itty Ipe Babu. (2020) Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management 20:5, pages 402-411.
Read now
Abbas Hassan & Khaled El-Rayes. (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics 38:6, pages 515-533.
Read now
Alolote Amadi. (2019) A cross-sectional snapshot of the insider view of highway infrastructure delivery in the developing world. International Journal of Construction Management 19:6, pages 472-491.
Read now
K.V. Prasad, V. Vasugi, R. Venkatesan & Nikhil S. Bhat. (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research 15:3, pages 216-238.
Read now
Eric Forcael, Hugo Morales, Duzgun Agdas, Carlos Rodríguez & César León. (2018) Risk Identification in the Chilean Tunneling Industry. Engineering Management Journal 30:3, pages 203-215.
Read now
Jeffrey Boon Hui Yap, Hamzah Abdul-Rahman, Chen Wang & Martin Skitmore. (2018) Exploring the underlying factors inducing design changes during building production. Production Planning & Control 29:7, pages 586-601.
Read now
Hossein Karimi, Timothy R. B. Taylor & Paul M. Goodrum. (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics 35:6, pages 368-380.
Read now
Nuru Gambo, Ilias Said & Radzi Ismail. (2017) Mediation Model for Improving Cost Factors That Affect Performance of Small-Scale Building Construction Contract Business in Nigeria: A PLS-SEM Approach. International Journal of Construction Education and Research 13:1, pages 24-46.
Read now
Wei-Chih Wang, Chia-Li Lin, Shih-Hsu Wang, Jang-Jeng Liu & Ming-Tsung Lee. (2014) Application of importance-satisfaction analysis and influence-relations map to evaluate design delay factors. Journal of Civil Engineering and Management 20:4, pages 497-510.
Read now
Aynur Kazaz, Serdar Ulubeyli & Nihan Avcioglu Tuncbilekli. (2012) Causes of Delays in Construction Projects in Turkey. Journal of Civil Engineering and Management 18:3, pages 426-435.
Read now
Joseph Iwaro & Abrahams Mwasha. (2012) The Effects of ISO Certification on Organization Workmanship Performance. Quality Management Journal 19:1, pages 53-67.
Read now
Hafizullah Sadat & Nivea Thomas. An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management 0:0, pages 1-11.
Read now
T. N. Liyanawatta, M. Francis & K. A. T. O. Ranadewa. Avoiding construction disputes: a comprehensive framework for pre-contract planning. International Journal of Construction Management 0:0, pages 1-13.
Read now

Articles from other publishers (133)

Mariam Elazhary & Ossama Hosny. (2024) Automated Management of Time Extension Claims. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 16:2.
Crossref
Kittiwet Kuntiyawichai & Preenithi Aksorn. (2024) The knowledge and holistic management indicators to measure the sustainability of area-based infrastructure project (AIP). Heliyon 10:9, pages e30159.
Crossref
Hakan TIRATACI & Hakan YAMAN. (2024) Konut Projelerinin Toplam İnşaat Süresinin Hesaplanması Türkiye’de Bir Vaka Analizi. Kent Akademisi 17:2, pages 568-591.
Crossref
Preenithi Aksorn, Varisara Tuntiratananon & Bupavech Phansri. (2024) The influencing factors developing PDCA model to achieve sustainability of area-based infrastructure project evaluation (AIPE). Environment, Development and Sustainability.
Crossref
Zeynep Birgonul, Cenk Budayan & Kerim Koc. (2024) Development of a Taxonomy for Causes of Changes in Construction Projects. Buildings 14:1, pages 278.
Crossref
Milad AghililotfAmir Mohammad RamezanianpourHani ArbabiMojtaba Maghrebi. (2024) Identifying Construction Managers’ Challenges: A Novel Approach Based on Social Network Analysis. Journal of Construction Engineering and Management 150:1.
Crossref
Norhana Danial & Mohd Saidin Misnan. (2023) Leadership issues for road project engineers. IOP Conference Series: Earth and Environmental Science 1274:1, pages 012029.
Crossref
Thalis P.V. Zis, Harilaos N. Psaraftis & Martina Reche-Vilanova. (2023) Design and application of a key performance indicator (KPI) framework for autonomous shipping in Europe. Maritime Transport Research 5, pages 100095.
Crossref
Siti Maryam Mohamad Azmi & Suhaiza Ismail. (2022) Weaknesses of Malaysian public procurement: a review of auditor general’s reports. Journal of Financial Reporting and Accounting 21:5, pages 999-1020.
Crossref
Bamidele Temitope Arijeloye. (2023) Impact of project risk allocation on PPP housing project delivery in Nigeria: partial least square structural equation modeling approach. Journal of Engineering, Design and Technology.
Crossref
Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi & Raphael Oseghale. (2021) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology 21:5, pages 1323-1342.
Crossref
Han-Sen Guo, Ming-Xin Liu, Jin Xue, Izzy Yi Jian, Qian Xu & Qian-Cheng Wang. (2023) Post-COVID-19 Recovery: An Integrated Framework of Construction Project Performance Evaluation in China. Systems 11:7, pages 359.
Crossref
Abdulrazak Badawi Abdulghafour & Kehlan Salman. (2023) Delays of construction projects in Makkah from the point of view of the consultant. Journal of Umm Al-Qura University for Engineering and Architecture 14:2, pages 122-134.
Crossref
Imran WARIS & Ilayda ULKU. (2023) Triggering Corporate Sustainable Performance in Construction Sector through Green Training: Moderating Effect of Barrier in Construction Management. Journal of Sustainable Construction Materials and Technologies.
Crossref
Maheshkumar S & Sindhu Vaardini U. (2023) A Study of Inventory Control Technique on Construction Industry. International Journal of Advanced Research in Science, Communication and Technology, pages 745-750.
Crossref
Leah Musenero, Bassam BaroudiIndra Gunawan. (2023) Critical Issues Affecting Dispute Resolution Practice in Infrastructure Public–Private Partnerships. Journal of Construction Engineering and Management 149:3.
Crossref
Bao Pham Van & Vachara Peansupap. (2023) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management.
Crossref
Junaid Tariq & S. Shujaa Safdar Gardezi. (2023) Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal 14:1, pages 101815.
Crossref
Shahid Hussain, Mohsin Shahzad, Andrea Appolloni & Wang Xuetong. (2023) The impact of public infrastructure project delays on sustainable community development. Environmental Science and Pollution Research 30:14, pages 40519-40533.
Crossref
Agnieszka LEŚNIAK. (2023) DELAYS IN EXECUTION OF BUILDING PROJECTS AND THEIR FINANCIAL CONSEQUENCES FOR CONTRACTORS - POLISH VIEW. Civil and Environmental Engineering Reports 33:1, pages 99-108.
Crossref
Ahmed Kamil Al Kulabi & Maher Farok Al Lebban. Identifying and analyzing failure factors of public construction projects: A case study. Identifying and analyzing failure factors of public construction projects: A case study.
Nurul Syazwana Mohammad Suferi, Md Motiar Rahman & Ismawi Md Yusof. Industry 4.0 in construction: A conceptual framework. Industry 4.0 in construction: A conceptual framework.
Martin Loosemore, Suhair Zaid Alkilani & Santiago Luperdi. (2022) Productivity and industrial relations in the Australian construction industry. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 175:4, pages 167-176.
Crossref
Jiseok Jeong & Changwan Kim. (2022) Comparison of Machine Learning Approaches for Medium-to-Long-Term Financial Distress Predictions in the Construction Industry. Buildings 12:10, pages 1759.
Crossref
Qiangnan Cao, Xin Zou & Lihui Zhang. (2022) Multiobjective Robust Optimization Model for Generating Stable and Makespan-Protective Repetitive Schedules. Journal of Construction Engineering and Management 148:9.
Crossref
Mahesh Babu Purushothaman & Sumit Kumar. (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment 11:2, pages 294-312.
Crossref
Babatunde Oluwaseun Ajayi & Thanwadee Chinda. (2022) Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis. Engineering Management in Production and Services 14:2, pages 26-45.
Crossref
Murat Gunduz & Nasser H. Al-Naimi. (2021) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management 29:5, pages 2073-2105.
Crossref
Jeffrey Boon Hui Yap, Ban Leong Lim, Martin Skitmore & Jason Gray. (2021) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology 20:3, pages 800-822.
Crossref
Babatunde Oluwaseun Ajayi & Thanwadee Chinda. (2022) Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach. Frontiers in Built Environment 8.
Crossref
Hongxin Sun, Wenzhe Tang, Colin F. Duffield, Lihai Zhang & Felix Kin Peng Hui. (2022) HOW TO GET INTERNATIONAL CONSTRUCTION PROJECTS DELIVERED ON TIME: FROM CHINESE CONTRACTORS’ PERSPECTIVE. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 28:2, pages 134-149.
Crossref
Mohammadzaman Heydari, Faizul Azli Mohd Rahim & Nur Mardhiyah Aziz. (2021) Developing a Model to Evaluate the Impact of Initiation Activities on Project Success in Iran by Considering Managing Stakeholder Engagement as a Moderator. Iranian Journal of Science and Technology, Transactions of Civil Engineering 46:1, pages 397-418.
Crossref
Anita Rauzana & Wira Dharma. (2022) Causes of delays in construction projects in the Province of Aceh, Indonesia. PLOS ONE 17:1, pages e0263337.
Crossref
Ali Foroutan Mirhosseini, Kelly Pitera, James Odeck & Morten Welde. (2022) Sustainable Project Management: Reducing the Risk of Cost Inaccuracy Using a PLS-SEM Approach. Sustainability 14:2, pages 960.
Crossref
Anita Rauzana, Aghnia Zahrah & Wira Dharma. (2022) Critical delay factors for construction projects in Central Aceh District, Indonesia. F1000Research 11, pages 474.
Crossref
Anita Rauzana, Aghnia Zahrah & Wira Dharma. (2022) Critical delay factors for construction projects in Central Aceh District, Indonesia. F1000Research 11, pages 474.
Crossref
N. Suriya, S. Kamal & R. Sivagamasundari. 2022. Sustainable Practices and Innovations in Civil Engineering. Sustainable Practices and Innovations in Civil Engineering 115 132 .
Jimoh Ibrahim, Christoph Loch & Kishore SenguptaJimoh Ibrahim, Christoph Loch & Kishore Sengupta. 2022. How Megaprojects Are Damaging Nigeria and How to Fix It. How Megaprojects Are Damaging Nigeria and How to Fix It 9 25 .
Elnaz Safapour, Sharareh Kermanshachi & Apurva Pamidimukkala. (2021) Post-disaster recovery in urban and rural communities: Challenges and strategies. International Journal of Disaster Risk Reduction 64, pages 102535.
Crossref
Alessandra Montenegro, Marina Dobrota, Marija Todorovic, Teodora Slavinski & Vladimir Obradovic. (2021) Impact of Construction Project Managers’ Emotional Intelligence on Project Success. Sustainability 13:19, pages 10804.
Crossref
Muizz O. Sanni-Anibire, Rosli M. Zin & Sunday O. Olatunji. (2021) Machine learning - based framework for construction delay mitigation. Journal of Information Technology in Construction 26, pages 303-318.
Crossref
Abbas Hassan, Khaled El-Rayes & Mohamed Attalla. (2020) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management 28:6, pages 1615-1634.
Crossref
Fatemeh Pariafsai & Sadjad Pariafsai. (2021) Classification of Key Competencies for Construction Project Management: Literature Review and Content Analysis. International Journal of Scientific Research in Science, Engineering and Technology, pages 211-234.
Crossref
Aliyeh Kazemi, Eun-Seok Kim & Mohammad-Hossein Kazemi. (2020) Identifying and prioritizing delay factors in Iran’s oil construction projects. International Journal of Energy Sector Management 15:3, pages 476-495.
Crossref
Mousavi Dehmourdi, Seyed AliM. Gopal NaikRavande Kishore. (2021) An Investigation on Construction Crisis Framework Based on the CRITIC and WASPAS Methods, a Case Study; Khuzestan province (Iran). International Journal of Engineering and Advanced Technology 10:4, pages 89-100.
Crossref
Long Chen, Qiuchen Lu, Shuai LiWenjing He & Jian Yang. (2021) Bayesian Monte Carlo Simulation–Driven Approach for Construction Schedule Risk Inference. Journal of Management in Engineering 37:2.
Crossref
Yaren BAYIR. (2021) İnşaat Sektöründe Gecikmeye Neden Olan Faktörlerin Küresel ve Bölgesel Bağlamda İrdelenmesi. Mimarlık Bilimleri ve Uygulamaları Dergisi (MBUD).
Crossref
Jeffrey Boon Hui Yap, Pei Ling Goay, Yoke Bee Woon & Martin Skitmore. (2021) Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal 60:1, pages 1717-1729.
Crossref
Eduardo Lavocat Galvão de Almeida, Vitor Amadeu da Silva Feitoza, Michele Tereza Marques Carvalho, Ana Beatriz Souza Piña, Lissa Gomes Araújo & Luiz Augusto Gimenez Aidar. (2021) Study of delays in constructions: a managerial point of view of private companies in Brasilia, Brazil. Gestão & Produção 28:3.
Crossref
C. P. Muneera & K. J. Joe Maria. 2021. Advances in Civil Engineering. Advances in Civil Engineering 35 49 .
S Selvaprakash, Somashekar Gouni, Sree Sai Rekha Jwala & vilasagar vinay. (2020) Comparative Study of Local and Migrant Labour For Productivity Enhancement in Construction Field. IOP Conference Series: Materials Science and Engineering 955:1, pages 012017.
Crossref
Resi Ariyasa Qadri & Amrie Firmansyah. (2020) THE POLYVOCALITY IN ACTION: EMBODYING THE EPIPHANY ON PUBLIC HOUSING CONUNDRUM. Humanities & Social Sciences Reviews 8:4, pages 1396-1417.
Crossref
Bryan Franz, Keith R. Molenaar & Bradley A. M. Roberts. (2020) Revisiting Project Delivery System Performance from 1998 to 2018. Journal of Construction Engineering and Management 146:9.
Crossref
Basem Al Khatib, Yap Soon Poh & Ahmed El-Shafie. (2020) Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII). Sustainability 12:15, pages 6171.
Crossref
Iman Suleiman Al Maktoumi, Firdouse Rahman Khan & Ahmed Rashid Suwied Al Maktoumi. (2020) ASSESSING THE FACTORS CAUSING PROJECT COMPLETION DELAYS IN THE CONSTRUCTION SECTOR OF OMAN USING SEM-PLS. Humanities & Social Sciences Reviews 8:3, pages 900-912.
Crossref
. (2020) Impact of Inclusive Leadership on Project Success. Journal of Engineering, Project, and Production Management.
Crossref
Luong Hai Nguyen. (2020) Empirical Analysis of a Management Function’s Failures in Construction Project Delay. Journal of Open Innovation: Technology, Market, and Complexity 6:2, pages 26.
Crossref
Jeffrey Boon Hui Yap & Ian Ni Chow. (2020) Investigating the managerial ‘‘nuts and bolts’’ for the construction industry. Built Environment Project and Asset Management 10:3, pages 331-348.
Crossref
Ahmed Shiha, Elkhayam M. DorraKhaled Nassar. (2020) Neural Networks Model for Prediction of Construction Material Prices in Egypt Using Macroeconomic Indicators. Journal of Construction Engineering and Management 146:3.
Crossref
Jeffrey Boon Hui Yap & Martin Skitmore. (2020) Ameliorating time and cost control with project learning and communication management. International Journal of Managing Projects in Business 13:4, pages 767-792.
Crossref
Eric Forcael, Guillermo Young, Alexander Opazo, Carlos Rodríguez & Arnaldo Bayona. (2020) The Effects of Temporary Tower Cranes on the Construction Process and Seismic Behavior of Reinforced Concrete Buildings. KSCE Journal of Civil Engineering 24:2, pages 580-595.
Crossref
Peter Adoko Obicci. 2020. Open Government. Open Government 2453 2492 .
Pouria Khosravi, Azadeh Rezvani & Neal M. Ashkanasy. (2020) Emotional intelligence: A preventive strategy to manage destructive influence of conflict in large scale projects. International Journal of Project Management 38:1, pages 36-46.
Crossref
Yaser Gamil, Ismail Rahman & Sasitharan Nagapan. (2019) Investigating the effect of poor communication in terms of cost and time overruns in the construction industry. International Journal of Construction Supply Chain Management 9:2, pages 94-106.
Crossref
Goutom K. Pall, Adrian J. Bridge, Jason Gray & Martin Skitmore. (2019) Causes of Delay in Power Transmission Projects: An Empirical Study. Energies 13:1, pages 17.
Crossref
Jad Chalhoub & Steven K. Ayer. (2019) Exploring the performance of an augmented reality application for construction layout tasks. Multimedia Tools and Applications 78:24, pages 35075-35098.
Crossref
Jeffrey Boon Hui Yap & Sin Yi Cheah. (2019) Key challenges faced by Chinese contractors in Malaysian construction industry. Journal of Engineering, Design and Technology 18:3, pages 705-726.
Crossref
Djoen San Santoso & Polwatta Gallage Madusha Piumal Gallage. (2019) Critical factors affecting the performance of large construction projects in developing countries. Journal of Engineering, Design and Technology 18:3, pages 531-556.
Crossref
Mohamed Marzouk & Mahmoud Hassouna. (2019) Quality analysis using three-dimensional modelling and image processing techniques. Construction Innovation 19:4, pages 614-628.
Crossref
Hossein Derakhshanfar, J. Jorge Ochoa, Konstantinos Kirytopoulos, Wolfgang Mayer & Vivian W.Y. Tam. (2019) Construction delay risk taxonomy, associations and regional contexts. Engineering, Construction and Architectural Management 26:10, pages 2364-2388.
Crossref
Rateb Sweis, Alireza Moarefi, Mahmood Hosseini Amiri, Soad Moarefi & Rawan Saleh. (2019) Causes of delay in Iranian oil and gas projects: a root cause analysis. International Journal of Energy Sector Management 13:3, pages 630-650.
Crossref
Jeffrey Boon Hui Yap, Ian Ni ChowKamran Shavarebi. (2019) Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian Projects. Journal of Management in Engineering 35:5.
Crossref
Jeffrey Boon Hui Yap & Hui Min Toh. (2019) Investigating the principal factors impacting knowledge management implementation in construction organisations. Journal of Engineering, Design and Technology 18:1, pages 55-69.
Crossref
Yue Choong Kog. (2019) Construction Delays in Indonesia, Malaysia, Thailand, and Vietnam. Practice Periodical on Structural Design and Construction 24:3.
Crossref
Serdar Durdyev & M. Reza Hosseini. (2019) Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business 13:1, pages 20-46.
Crossref
Prasad K.V.Vasugi V.Venkatesan R.Nikhil Bhat. (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction 24:1, pages 58-78.
Crossref
Mandeep Saini, Mohammed Arif & Dennis J. Kulonda. (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation 19:1, pages 15-33.
Crossref
Agnieszka Leśniak & Grzegorz Piskorz. (2019) Faktory opóźnień. BUILDER 259:2, pages 26-28.
Crossref
Muhammad Muhammad Tahir, Nuzul Azam Haron, Aidi Hizami Alias & Ikechukwu A. Diugwu. 2019. GCEC 2017. GCEC 2017 47 57 .
Ayodeji E. Oke, Clinton O. Aigbavboa & Khosi Mohapeloa. 2019. Project Management and BIM for Sustainable Modern Cities. Project Management and BIM for Sustainable Modern Cities 179 189 .
Basem Khatib, Yap Poh & Ahmed El-Shafie. (2018) Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project. Sustainability 10:12, pages 4772.
Crossref
N F Ariffin, M I Ali, N I Ramli, M F Md Jaafar, S Wan Ahmad, N H Abdul Shukor Lim & N H Abd Khalid. (2018) The Study on Cause and Effect of Abandoned Housing Project in Selangor. IOP Conference Series: Materials Science and Engineering 431, pages 082013.
Crossref
Azadeh Rezvani, Pouria Khosravi & Neal M. Ashkanasy. (2018) Examining the interdependencies among emotional intelligence, trust, and performance in infrastructure projects: A multilevel study. International Journal of Project Management 36:8, pages 1034-1046.
Crossref
Nurul Afroze Zainal Abidin & Bingunath Ingirige. (2018) The dynamics of vulnerabilities and capabilities in improving resilience within Malaysian construction supply chain. Construction Innovation 18:4, pages 412-432.
Crossref
Mohammadreza Habibi & Sharareh Kermanshachi. (2018) Phase-based analysis of key cost and schedule performance causes and preventive strategies. Engineering, Construction and Architectural Management 25:8, pages 1009-1033.
Crossref
Yu Maemura, Eugene KimKazumasa Ozawa. (2018) Root Causes of Recurring Contractual Conflicts in International Construction Projects: Five Case Studies from Vietnam. Journal of Construction Engineering and Management 144:8.
Crossref
Tillmann Böhme, Alberto Escribano, Emma Elizabeth Heffernan & Scott Beazley. (2018) Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector. Built Environment Project and Asset Management 8:3, pages 253-266.
Crossref
Muhammad Saiful Islam & Bambang Trigunarsyah Suhariadi. (2018) Construction delays in privately funded large building projects in Bangladesh. Asian Journal of Civil Engineering 19:4, pages 415-429.
Crossref
Youcef J.-T. Zidane & Bjorn Andersen. (2018) The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business 11:3, pages 650-672.
Crossref
Isaac Sakyi Damoah & Desmond Kwadjo Kumi. (2018) Causes of government construction projects failure in an emerging economy. International Journal of Managing Projects in Business 11:3, pages 558-582.
Crossref
Muhammad T. Hatamleh, Mohammed Hiyassat, Ghaleb Jalil Sweis & Rateb Jalil Sweis. (2018) Factors affecting the accuracy of cost estimate: case of Jordan. Engineering, Construction and Architectural Management 25:1, pages 113-131.
Crossref
Adekunle Sabitu Oyegoke & Naseer Al Kiyumi. (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction 22:3, pages 286-302.
Crossref
M M Rahman, Y H Yap, N R Ramli, M A Dullah & M S W Shamsuddin. (2017) Causes of shortage and delay in material supply: a preliminary study. IOP Conference Series: Materials Science and Engineering 271, pages 012037.
Crossref
George Agyekum-Mensah & Andrew David Knight. (2017) The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management 24:5, pages 828-841.
Crossref
Murat Gunduz & Mohanad H. A. AbuHassan. (2017) Mapping the Industrial Perception of Delay Data Through Importance Rating. Arabian Journal for Science and Engineering 42:9, pages 3799-3808.
Crossref
Bekithemba Mpofu, Edward Godfrey Ochieng, Cletus Moobela & Adriaan Pretorius. (2017) Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management 24:2, pages 346-376.
Crossref
Mohamed KadryHesham OsmanMaged Georgy. (2017) Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management 143:2.
Crossref
David Arditi, Shruti Nayak & Atilla Damci. (2017) Effect of organizational culture on delay in construction. International Journal of Project Management 35:2, pages 136-147.
Crossref
Peter Adoko Obicci. 2017. Risk Management Strategies in Public-Private Partnerships. Risk Management Strategies in Public-Private Partnerships 38 76 .
Saheed O. Ajayi, Lukumon O. Oyedele, Muhammad Bilal, Olugbenga O. Akinade, Hafiz A. Alaka & Hakeem A. Owolabi. (2017) Critical management practices influencing on-site waste minimization in construction projects. Waste Management 59, pages 330-339.
Crossref
Tsegay Gebrehiwet & Hanbin Luo. (2017) Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Engineering 196, pages 366-374.
Crossref
K. Chandrashekhar Iyer & Partha S. Banerjee. (2016) Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India. Organization, Technology and Management in Construction: an International Journal 8:1, pages 1464-1481.
Crossref
Djoen San SantosoSothy Soeng. (2016) Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects. Journal of Management in Engineering 32:6.
Crossref
Goutom K. Pall, Adrian J. Bridge, Martin Skitmore & Jason Gray. (2016) Comprehensive review of delays in power transmission projects. IET Generation, Transmission & Distribution 10:14, pages 3393-3404.
Crossref
Nuru Gambo, Ilias Said & Radzi Ismail. (2016) Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice. Engineering, Construction and Architectural Management 23:5, pages 588-609.
Crossref
Hossein Karimi, Timothy R.B. Taylor, Paul M. Goodrum & Cidambi Srinivasan. (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation 16:3, pages 307-322.
Crossref
Petter Eik-Andresen, Andreas Dypvik Landmark, Sara Hajikazemi, Agnar Johansen & Bjørn Andersen. (2016) Remedies for Managing Bottlenecks and Time Thieves in Norwegian Construction Projects – Public vs Private Sector. Procedia - Social and Behavioral Sciences 226, pages 343-350.
Crossref
Remon F. Aziz & Asmaa A. Abdel-Hakam. (2016) Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal 55:2, pages 1515-1539.
Crossref
Jesper Kranker LarsenGeoffrey Qiping ShenSøren Munch LindhardThomas Ditlev Brunoe. (2016) Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. Journal of Management in Engineering 32:1.
Crossref
Wilson Udo Udofia, B. H. W. Hadikusumo & Djoen San Santoso. (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction 20:3, pages 208-234.
Crossref
Dang T. H. GiangLow Sui Pheng. (2015) Critical Factors Affecting the Efficient Use of Public Investments in Infrastructure in Vietnam. Journal of Infrastructure Systems 21:3.
Crossref
An T. Nguyen, Long D. Nguyen, Long Le-Hoai & Chau N. Dang. (2015) Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process. International Journal of Project Management 33:6, pages 1364-1376.
Crossref
Yi HuAlbert P. C. ChanYun LeRun-zhi Jin. (2015) From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis. Journal of Management in Engineering 31:4.
Crossref
Mohammed RuqaishiHamdi A. Bashir. (2015) Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study. Journal of Management in Engineering 31:3.
Crossref
Farhad Eizakshiri, Paul W. Chan & Margaret W. Emsley. (2015) Where is intentionality in studying project delays?. International Journal of Managing Projects in Business 8:2, pages 349-367.
Crossref
Hong-Anh Vu, Jianqiong Wang, Lianxing Min & Thihong-Nhung Nguyen. (2015) Impacts of the Financial Factors on Schedule Delays Risk of the International Contracting Projects: Evidence from Highway BOT Pro-jects in Vietnam. World Journal of Engineering and Technology 03:04, pages 311-319.
Crossref
Hamzah Abdul-Rahman, Chen Wang & Nur Hamizah Ariffin. (2015) Identification of Risks Pertaining to Abandoned Housing Projects in Malaysia. Journal of Construction Engineering 2015, pages 1-12.
Crossref
Michał Głuszak & Agnieszka Leśniak. (2015) Construction Delays in Clients Opinion – Multivariate Statistical Analysis. Procedia Engineering 123, pages 182-189.
Crossref
Amin Abbaszadegan & David Grau. (2015) Assessing the Influence of Automated Data Analytics on Cost and Schedule Performance. Procedia Engineering 123, pages 3-6.
Crossref
Youcef J-T. Zidane, Agnar Johansen, Bjørn Andersen & Erfan Hoseini. (2015) Time-thieves and Bottlenecks in the Norwegian Construction Projects. Procedia Economics and Finance 21, pages 486-493.
Crossref
Giang Dang & Low Sui PhengGiang Dang & Low Sui Pheng. 2015. Infrastructure Investments in Developing Economies. Infrastructure Investments in Developing Economies 67 80 .
Vitor SousaNuno Marques AlmeidaLuís Alves Dias. (2014) Role of Statistics and Engineering Judgment in Developing Optimized Time-Cost Relationship Models. Journal of Construction Engineering and Management 140:8.
Crossref
Soffi WestinMaung K. Sein. (2014) Improving Data Quality in Construction Engineering Projects: An Action Design Research Approach. Journal of Management in Engineering 30:3.
Crossref
Pablo GonzálezVicente GonzálezKeith MolenaarFrancisco Orozco. (2014) Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management 140:1.
Crossref
José Ramón San Cristóba. (2014) Cost Allocation between Activities that have Caused Delays in a Project Using Game Theory. Procedia Technology 16, pages 1017-1026.
Crossref
Muhammad Usman Tariq. (2013) A Six Sigma based risk management framework for handling undesired effects associated with delays in project completion. International Journal of Lean Six Sigma 4:3, pages 265-279.
Crossref
Soffi Westin. 2013. Building Sustainable Information Systems. Building Sustainable Information Systems 583 594 .
Young‐Ill Park & Theopisti C. Papadopoulou. (2012) Causes of cost overruns in transport infrastructure projects in Asia. Built Environment Project and Asset Management 2:2, pages 195-216.
Crossref
Abdelhak Challal & Mohamed Tkiouat. (2012) The Design of Cost Estimating Model of Construction Project: Application and Simulation. Open Journal of Accounting 01:01, pages 15-26.
Crossref
Abdelhak Challal & Mohamed Tkiouat. (2012) Identification of the Causes of Deadline Slippage in Construction Projects: State of the Art and Application. Journal of Service Science and Management 05:02, pages 151-159.
Crossref
Abdelhak Challal & Mohamed Tkiouat. (2012) Qualitative Approach Risk Period in Construction Projects. Journal of Financial Risk Management 01:03, pages 42-51.
Crossref
Shamas-ur-Rehman ToorGeorge Ofori. (2010) Positive Psychological Capital as a Source of Sustainable Competitive Advantage for Organizations. Journal of Construction Engineering and Management 136:3, pages 341-352.
Crossref
Bekithemba Mpofu, Dr Edward Ochieng, Adriaan Pretorius & Cletus Moobela. (2017) Profiling Causative Factors Leading to Construction Project Delays in the United Arab Emirates. SSRN Electronic Journal.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.