2,650
Views
70
CrossRef citations to date
0
Altmetric
PAPERS

Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong

, , , , &
Pages 233-245 | Received 03 Mar 2010, Accepted 04 Dec 2010, Published online: 09 Mar 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (10)

E. M. A. C. Ekanayake, Geoffrey Q. P. Shen & Mohan M. Kumaraswamy. (2023) A fuzzy synthetic evaluation of capabilities for improving supply chain resilience of industrialised construction: a Hong Kong case study. Production Planning & Control 34:7, pages 623-640.
Read now
Dezhi Li, Xin Li, Haibo Feng, Yan Wang & Shushu Fan. (2022) ISM-based relationship among critical factors that affect the choice of prefabricated concrete buildings in China. International Journal of Construction Management 22:6, pages 977-992.
Read now
E. M. A. C. Ekanayake, Geoffrey Q. P. Shen & Mohan M. Kumaraswamy. (2021) Identifying supply chain capabilities of construction firms in industrialized construction. Production Planning & Control 32:4, pages 303-321.
Read now
Gangyan Xu, Ming Li, Lizi Luo, Chun-Hsien Chen & George Q. Huang. (2019) Cloud-based fleet management for prefabrication transportation. Enterprise Information Systems 13:1, pages 87-106.
Read now
Serdar Durdyev & Syuhaida Ismail. (2019) Offsite Manufacturing in the Construction Industry for Productivity Improvement. Engineering Management Journal 31:1, pages 35-46.
Read now
Ke Chen, Gangyan Xu, Fan Xue, Ray Y. Zhong, Diandian Liu & Weisheng Lu. (2018) A Physical Internet-enabled Building Information Modelling System for prefabricated construction. International Journal of Computer Integrated Manufacturing 31:4-5, pages 349-361.
Read now
Sharifah Akmam Syed Zakaria, Thayaparan Gajendran, Martin Skitmore & Graham Brewer. (2018) Key factors influencing the decision to adopt industrialised building systems technology in the Malaysian construction industry: an inter-project perspective. Architectural Engineering and Design Management 14:1-2, pages 27-45.
Read now
Sharifah Akmam Syed Zakaria, Thayaparan Gajendran, Timothy Rose & Graham Brewer. (2018) Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review. Architectural Engineering and Design Management 14:1-2, pages 3-26.
Read now
J.S. Goulding, F. Pour Rahimian, M. Arif & M.D. Sharp. (2015) New offsite production and business models in construction: priorities for the future research agenda. Architectural Engineering and Design Management 11:3, pages 163-184.
Read now
Peter Demian & David Walters. (2014) The advantages of information management through building information modelling. Construction Management and Economics 32:12, pages 1153-1165.
Read now

Articles from other publishers (60)

Tai Wai Kwok, Siwei Chang & Heng Li. (2022) Factors affecting unitized curtain wall system adoption for Hong Kong's high-rise residential buildings: a multi-stakeholder perspective. Engineering, Construction and Architectural Management 31:2, pages 526-543.
Crossref
Na Li, Yu Feng, Jixiong Liu, Xiongjin Ye & Xingxing Xie. (2023) Research on the Modular Design and Application of Prefabricated Components Based on KBE. Buildings 13:12, pages 2980.
Crossref
Tai Wai Kwok, SiWei Chang & Heng Li. (2023) Understanding client satisfaction of prefabricated curtain wall in Hong Kong using XGBoost and Pearson correlation. Engineering, Construction and Architectural Management.
Crossref
Wennan Zhang, Chenglin Yu & Ray Y. Zhong. (2023) Stability measure for prefab balancing in prefabrication construction supply chain management. Computers & Industrial Engineering 183, pages 109518.
Crossref
Ying Chai, Xiufeng Liang & Yi Liu. (2023) Construction Quality of Prefabricated Buildings Using Structural Equation Modeling. Applied Sciences 13:17, pages 9629.
Crossref
Kaihan Cai, Haoxuan Wang, Jiasi Wang, Jing Bai, Jian Zuo, Kuongin Chan, Kaman Lai & Qingbin Song. (2023) Mitigating lifecycle GHG emissions of building sector through prefabricated light-steel buildings in comparison with traditional cast-in-place buildings. Resources, Conservation and Recycling 194, pages 107007.
Crossref
Achini Peiris, Felix Kin Peng Hui, Colin Duffield & Tuan Ngo. (2023) Production scheduling in modular construction: Metaheuristics and future directions. Automation in Construction 150, pages 104851.
Crossref
Hua Du, Qi Han, Jun Sun & Cynthia Changxin Wang. (2022) Adoptions of prefabrication in residential sector in China: agent-based policy option exploration. Engineering, Construction and Architectural Management 30:4, pages 1697-1725.
Crossref
Félix Blampain, Matthieu Bricogne, Benoît Eynard, Céline Bricogne & Sébastien Pinon. 2023. Advances on Mechanics, Design Engineering and Manufacturing IV. Advances on Mechanics, Design Engineering and Manufacturing IV 884 894 .
Shengbin Ma, Zhongfu Li, Long Li, Mengqi Yuan & Xianfei Yin. (2022) EXPLORING THE EFFECT OF STAKEHOLDER RELATIONSHIP QUALITY ON TECHNOLOGICAL INNOVATION IN OFF-SITE CONSTRUCTION: THE MEDIATING ROLE OF THE KNOWLEDGE SHARING. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 29:1, pages 77-92.
Crossref
E.M.A.C. Ekanayake, Geoffrey Shen, Mohan Kumaraswamy, Emmanuel Kingsford Owusu & Jin Xue. (2021) Capabilities to withstand vulnerabilities and boost resilience in industrialized construction supply chains: a Hong Kong study. Engineering, Construction and Architectural Management 29:10, pages 3809-3829.
Crossref
Yanhu Han, Siyuan Song & Weiling Zhuang. (2022) Behavioral Strategies between Government and Real Estate Developers on Prefabricated Buildings Based on Triangular Fuzzy Matrix Game. Buildings 12:12, pages 2102.
Crossref
Xing Li, Jiwen Zhang, Bei Liu, Xinzhe Min, Yuchao Yang & Yilun Liu. (2022) Experimental investigation on the anchorage performance of hooked high-strength steel strands for beam-to-column connection. Structures 46, pages 539-554.
Crossref
Qianqian Shi, Ziyu Wang, Boya Li, Marcel Hertogh & Shuyi Wang. (2022) Evolutionary Analysis of Prefabrication Implementation in Construction Projects under Low-Carbon Policies. International Journal of Environmental Research and Public Health 19:19, pages 12511.
Crossref
Lan LuoXia WuJingke HongGuangdong Wu. (2022) Fuzzy Cognitive Map-Enabled Approach for Investigating the Relationship between Influencing Factors and Prefabricated Building Cost Considering Dynamic Interactions. Journal of Construction Engineering and Management 148:9.
Crossref
Chengjia Han, Fanlong Tang, Tao Ma, Linhao Gu & Zheng Tong. (2022) Construction quality evaluation of asphalt pavement based on BIM and GIS. Automation in Construction 141, pages 104398.
Crossref
Sadith Chinthaka Vithanage, Michael Sing, Peter Davis & Manikam Pillay. (2021) Systematic review on the identification of safety risks in off-site manufacturing (OSM). Journal of Engineering, Design and Technology 20:4, pages 935-964.
Crossref
Liangliang Song, Haiyan Li, Yongliang Deng & Chaozhi Li. (2022) Understanding Safety Performance of Prefabricated Construction Based on Complex Network Theory. Applied Sciences 12:9, pages 4308.
Crossref
Ali Katebi, Peyman Homami & Mohammad Najmeddin. (2022) Acceptance model of precast concrete components in building construction based on Technology Acceptance Model (TAM) and Technology, Organization, and Environment (TOE) framework. Journal of Building Engineering 45, pages 103518.
Crossref
E.M.A.C. Ekanayake, Geoffrey Qiping Shen, Mohan Kumaraswamy & Emmanuel Kingsford Owusu. (2020) Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management 28:10, pages 3041-3059.
Crossref
E.M.A.C. Ekanayake, Geoffrey Shen & Mohan M. Kumaraswamy. (2020) Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Engineering, Construction and Architectural Management 28:10, pages 3236-3260.
Crossref
Lin Zhang & Andrew Agapiou. (2021) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 174:4, pages 145-162.
Crossref
Mengqi Yuan, Zhongfu Li, Xiaodong Li & Xiaowei Luo. (2021) Managing stakeholder-associated risks and their interactions in the life cycle of prefabricated building projects: A social network analysis approach. Journal of Cleaner Production 323, pages 129102.
Crossref
Jin Yang, Mingjian Yang, Xingyang He, Mengyang Ma, Mengtian Fan, Ying Su & Hongbo Tan. (2021) Green reaction-type nucleation seed accelerator prepared from coal fly ash ground in water environment. Construction and Building Materials 306, pages 124840.
Crossref
Mengqi Yuan, Zhongfu Li, Xiaodong Li, Xiaowei Luo, Xianfei Yin & Jin Cai. (2021) Proposing a multifaceted model for adopting prefabricated construction technology in the construction industry. Engineering, Construction and Architectural Management.
Crossref
Fathin Haji Ismail, Mehdi Shahrestani, Maria Vahdati, Philippa Boyd & Sohrab Donyavi. (2021) Climate change and the energy performance of buildings in the future – A case study for prefabricated buildings in the UK. Journal of Building Engineering 39, pages 102285.
Crossref
Xing Li, Jiwen Zhang, Bei Liu & Hailou Jiang. (2021) Pull-out behavior of non-prestressed steel strands in novel beam-to-column connection. Construction and Building Materials 282, pages 122538.
Crossref
Sayali Joshi, Michael Hamilton, Robert Warren, Danny Faucett, Wenmeng Tian, Yu Wang & Junfeng Ma. (2021) Implementing Virtual Reality technology for safety training in the precast/ prestressed concrete industry. Applied Ergonomics 90, pages 103286.
Crossref
Lan Luo, Xia Wu, Liang Cheng & Zhihao Tu. 2021. Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate. Proceedings of the 25th International Symposium on Advancement of Construction Management and Real Estate 179 193 .
Chinedu Chimdi Adindu, Susan Nnadzwa Yisa, Saheed Olanrewaju Yusuf, Joseph Kolawole Makinde & Aliyu Muhammed Kamilu. (2020) Knowledge, Adoption, Prospects and Challenges of Prefabricated Construction Method in Nigeria – An Empirical Study of North Central Geo-Political Zone. Journal of Art Architecture and Built Environment 3:1, pages 01-24.
Crossref
R García, A Perez, J A Pulido, P Ulloa & E Forcael. (2020) Assembly of Stay-In-Place Concrete Blocks Using a Robot. IOP Conference Series: Earth and Environmental Science 503:1, pages 012077.
Crossref
Yue Gao & Xian-Liang Tian. (2020) Prefabrication policies and the performance of construction industry in China. Journal of Cleaner Production 253, pages 120042.
Crossref
He Wang, Yinqi Zhang, Weijun Gao & Soichiro Kuroki. (2020) Life Cycle Environmental and Cost Performance of Prefabricated Buildings. Sustainability 12:7, pages 2609.
Crossref
Linlin Zhao, Zhansheng Liu & Jasper Mbachu. (2019) Optimization of the Supplier Selection Process in Prefabrication Using BIM. Buildings 9:10, pages 222.
Crossref
Jingyang Zhou, Pengwang He, Yanjun Qin & Dandan Ren. (2019) A selection model based on SWOT analysis for determining a suitable strategy of prefabrication implementation in rural areas. Sustainable Cities and Society 50, pages 101715.
Crossref
Guofeng Ma, Jun Jiang & Shanshan Shang. (2019) Visualization of Component Status Information of Prefabricated Concrete Building Based on Building Information Modeling and Radio Frequency Identification: A Case Study in China. Advances in Civil Engineering 2019, pages 1-13.
Crossref
Zhikun Ding, Shan Liu, Longhui Liao & Liang Zhang. (2019) A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects. Automation in Construction 102, pages 45-58.
Crossref
Wei Zhang, Ming Wai Lee, Lara Jaillon & Chi-Sun Poon. (2018) The hindrance to using prefabrication in Hong Kong's building industry. Journal of Cleaner Production 204, pages 70-81.
Crossref
Ruoyu Jin, Shang Gao, Ali Cheshmehzangi & Emmanuel Aboagye-Nimo. (2018) A holistic review of off-site construction literature published between 2008 and 2018. Journal of Cleaner Production 202, pages 1202-1219.
Crossref
Jingkuang Liu, Enqin Gong, Dong Wang & Yue Teng. (2018) Cloud Model-Based Safety Performance Evaluation of Prefabricated Building Project in China. Wireless Personal Communications 102:4, pages 3021-3039.
Crossref
Gangyan Xu, Ming Li, Chun-Hsien Chen & Yongchang Wei. (2018) Cloud asset-enabled integrated IoT platform for lean prefabricated construction. Automation in Construction 93, pages 123-134.
Crossref
Mengping Xie, Yuna Wang & Kaijun Yang. (2018) Multi-Stakeholder Risk Analysis for Construction Industry Industrialization: A Review. Multi-Stakeholder Risk Analysis for Construction Industry Industrialization: A Review.
Lyndon Trinder. (2018) Design for manufacture and assembly: its benefits and risks in the UK water industry. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 171:4, pages 152-163.
Crossref
Lei Jiang, Zhongfu Li, Long Li & Yunli Gao. (2018) Constraints on the Promotion of Prefabricated Construction in China. Sustainability 10:7, pages 2516.
Crossref
Han Zhu, Jingke Hong, Geoffrey Qiping Shen, Chao Mao, Hejia Zhang & Zhengrong Li. (2018) The exploration of the life-cycle energy saving potential for using prefabrication in residential buildings in China. Energy and Buildings 166, pages 561-570.
Crossref
Xiaer Xiahou, Jingfeng Yuan, Yan Liu, Yuchun Tang & Qiming Li. (2018) Exploring the Driving Factors of Construction Industrialization Development in China. International Journal of Environmental Research and Public Health 15:3, pages 442.
Crossref
Xiao Li, Wen Yi, Hung-Lin Chi, Xiangyu Wang & Albert P.C. Chan. (2018) A critical review of virtual and augmented reality (VR/AR) applications in construction safety. Automation in Construction 86, pages 150-162.
Crossref
Jingke Hong, Geoffrey Qiping Shen, Zhengdao Li, Boyu Zhang & Wanqiu Zhang. (2018) Barriers to promoting prefabricated construction in China: A cost–benefit analysis. Journal of Cleaner Production 172, pages 649-660.
Crossref
Barry J. Gledson & David Greenwood. (2017) The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach. Engineering, Construction and Architectural Management 24:6, pages 950-967.
Crossref
Yan Liu, Sander van Nederveen & Marcel Hertogh. (2017) Understanding effects of BIM on collaborative design and construction: An empirical study in China. International Journal of Project Management 35:4, pages 686-698.
Crossref
Shrutiniwas Sharma, Anil Sawhney & Mohammed Arif. (2017) Parametric Modelling for Designing Offsite Construction. Procedia Engineering 196, pages 1114-1121.
Crossref
B. Johnston, T. Bulbul, Y. Beliveau & R. Wakefield. (2016) An assessment of pictographic instructions derived from a virtual prototype to support construction assembly procedures. Automation in Construction 64, pages 36-53.
Crossref
Jingke Hong, Geoffrey Qiping Shen, Chao Mao, Zhengdao Li & Kaijian Li. (2016) Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model. Journal of Cleaner Production 112, pages 2198-2207.
Crossref
Martin Bonev, Michael Wörösch & Lars Hvam. (2015) Utilizing platforms in industrialized construction. Construction Innovation 15:1, pages 84-106.
Crossref
Dongping Cao, Guangbin Wang, Heng Li, Martin Skitmore, Ting Huang & Weiyu Zhang. (2015) Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction 49, pages 113-122.
Crossref
Zhengdao Li, Geoffrey Q. P. Shen, Chuang Ji & Jingke Hong. (2014) Stakeholder-Based Analysis of Drivers and Constraints in the Use of Off-Site Construction. Stakeholder-Based Analysis of Drivers and Constraints in the Use of Off-Site Construction.
Saad AboMoslim & Alan Russell. (2014) Screening design and construction technologies of skyscrapers. Construction Innovation 14:3, pages 307-345.
Crossref
Zhengdao Li, Geoffrey Qiping Shen & Xiaolong Xue. (2014) Critical review of the research on the management of prefabricated construction. Habitat International 43, pages 240-249.
Crossref
H.L. Guo, Heng Li & Vera Li. (2013) VP-based safety management in large-scale construction projects: A conceptual framework. Automation in Construction 34, pages 16-24.
Crossref
Wen Yi & Albert P.C. Chan. (2013) Optimizing work–rest schedule for construction rebar workers in hot and humid environment. Building and Environment 61, pages 104-113.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.