2,650
Views
70
CrossRef citations to date
0
Altmetric
PAPERS

Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong

, , , , &
Pages 233-245 | Received 03 Mar 2010, Accepted 04 Dec 2010, Published online: 09 Mar 2011

References

  • Aouad , G. , Lee , A. and Wu , S. 2005 . nD modelling for collaborative working in construction . Architectural Engineering and Design Management , 1 (1) : 33 – 44 .
  • Barthelemy , J. 2006 . The experimental roots of revolutionary vision . MIT Sloan Management Review , 3 : 81 – 4 .
  • Blismas , N.G. , Pendlebury , M.C. , Gibb , A.G.F. and Pasquire , C.L. 2005 . Constraints to the use of offsite production on construction projects . International Journal of Architecture, Engineering and Design Management , 13 : 153 – 62 .
  • Castilho , V.C. , de , Debs , El , M.K. and Nicoletti , M. do C. 2007 . Using a modified genetic algorithm to minimize the production costs for slabs of precast prestressed concrete joists . Engineering Applications of Artificial Intelligence , 20 (4) : 519 – 30 .
  • Chan , T.K. and Poh , C.K. 2000 . Behaviour of precast reinforced concrete pile caps . Construction and Building Materials , 14 : 73 – 8 .
  • Chan , W.T. and Hu , H. 2001 . An application of genetic algorithms to precast production scheduling . Computers and Structures , 79 (17) : 1605 – 16 .
  • Chan , W.T. and Hu , H. 2002 . Constraint programming approach to precast production scheduling . Journal of Construction Engineering and Management , 128 (6) : 513 – 21 .
  • Cheung , S.O. , Tong , K.L.T. and Tam , C.M. 2002 . Site pre‐cast yard layout arrangement through genetic algorithms . Journal of Automation in Construction , 11 (1) : 35 – 46 .
  • Chiang , Y.H. , Chan , E.H.W. and Lok , L.K.L. 2005 . Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong . Habitat International , 28 : 1 – 18 .
  • Choi , S.H. and Chan , A.M.M. 2004 . A virtual prototyping system for rapid product development . Computer‐Aided Design , 36 : 401 – 12 .
  • Elliott , K.S. 2002 . Precast Concrete Structures , Oxford : Butterworth‐Heinemann .
  • Ergen , E. and Akinci , B. 2008 . Formalization of the flow of component‐related information in precast concrete supply chains . Journal of Construction Engineering and Management , 134 (2) : 112 – 21 .
  • Finnimore , B. 1989 . Houses from the Factory: System Building and the Welfare State, 1942–1974 , London : Rivers Oram Press .
  • Gibb , A. 2001 . Standardization and pre‐assembly—distinguishing myth from reality using case study research . Construction Management and Economics , 19 (3) : 307 – 15 .
  • Gibb , A. and Isack , F. 2003 . Re‐engineering through pre‐assembly: client expectation and drivers . Building Research & Information , 31 (2) : 146 – 60 .
  • Goodier , C.I. and Gibb , A.G.F. 2007 . Future opportunities for offsite in the UK . Construction Management and Economics , 25 (6) : 585 – 95 .
  • Guo , H.L. , Li , H. and Skitmore , M. 2010 . Life cycle management of construction projects based on Virtual Prototyping technology . ASCE Journal of Management in Engineering , 26 (1) : 41 – 7 .
  • Hobbs , B. and Dawood , N. Harnessing the power of Virtual Reality—the potential for VR as a virtual integrated environment for project development in construction . Paper presented at the Berkeley‐Stanford CE&M Workshop: Defining a Research Agenda for AEC Process/Product Development in 2000 and Beyond . August 26–28 , USA. Stanford University .
  • Huang , T. , Kong , C.W. , Guo , H.L. , Baldwin , A. and Li , H. 2007 . A virtual prototyping system for simulating construction processes . Automation in Construction , 16 (5) : 576 – 85 .
  • Klevas , J. 2005 . Organization of packaging resources at a product‐developing company . International Journal of Physical Distribution and Logistics Management , 35 (2) : 116 – 31 .
  • Korkmaz , H.H. and Tankut , T. 2005 . Performance of a precast concrete beam‐to‐beam connection subject to reversed cyclic loading . Engineering Structures , 27 : 1392 – 407 .
  • Leu , S.S. and Hwang , S.T. 2002 . GA‐based resource‐constrained flow‐shop scheduling model for mixed precast production . Automation in Construction , 11 : 439 – 52 .
  • Li , H. , Guo , H.L. , Skibniewski , M.J. and Skitmore , M. 2008 . Using the IKEA model and Virtual Prototyping technology to improve construction process management . Construction Management and Economics , 26 (9) : 991 – 1000 .
  • Love , P. , Pundal , M. and Li , H. 1999 . Determing the causal structure of rework influence in construction . Construction Management and Economics , 17 (4) : 505 – 17 .
  • Low , S.P. and Choong , J.C. 2001 . Just‐in‐time management of precast concrete components . Journal of Construction Engineering and Management , 127 (6) : 494 – 501 .
  • Marshall‐Ponting , A.J. and Aouad , G. 2005 . An nD modelling approach to improve communication processes for construction . Automation in Construction , 14 (3) : 311 – 21 .
  • Mather , H. 1992 . Design for logistics (DFL)—the next challenge for designers . Production and Inventory Management Journal , 33 (1) : 7 – 10 .
  • Pratt , M.J. 1995 . “ Virtual prototyping and product models in mechanical engineering ” . In Proc. on Virtual Prototyping—Virtual Environments and the Product Design Process , London : Chapman and Hall .
  • Riese , M. 2006 . “ One Island East, Hong Kong: a case study in construction virtual prototyping ” . In Virtual Futures for Design, Construction & Procurement , Edited by: Brandon , P. and Kocatürk , T. Oxford : Blackwell Publishing Ltd. .
  • Sarshar , M. and and Christiansson , P. Towards virtual prototyping in the construction industry: the case study of the DIVERCITY project . Proceedings of the World IT Conference for Design and Construction . February 18–24 . pp. 581 – 88 . Malaysia : Langkawi .
  • Shen , Q. , Gausemeier , J. , Bauch , J. and Radkowski , R. 2005 . A cooperative virtual prototyping system for mechatronic solution elements based assembly . Advanced Engineering Informatics , 19 : 169 – 77 .
  • Slaughter , E.S. and Eraso , M. 1997 . Simulation of structural steel erection to assess innovations . IEEE Transactions on Engineering Management , 44 (2) : 196 – 207 .
  • Soubra , K. , Wight , J.K. and Naaman , E. 1993 . Cyclic response of fibrous castin‐place connections in precast beam–column subassemblages . ACI Structural Journal , 90 (3) : 316 – 23 .
  • Tam , W.Y.V. , Tam , C.M. , Chan , W.W.J. and Ng , C.Y.W. 2006 . Cutting construction wastes by prefabrication . International Journal of Construction Management , 6 (1) : 15 – 25 .
  • Tawfik , H. and Fernando , T. A simulation environment for construction site planning . Paper presented at the 5th International Conference on Information Visualisation . July 25–27 , London.
  • Ting , Y.H. 1997 . The economic implications of subcontracting practice on building prefabrication . Automation in Construction , 6 (3) : 163 – 74 .
  • Warszawski , A. 1972 . Planning of location and capacity of industrial plants in the construction industry . Building Science , 7 (4) : 209 – 14 .
  • Warszawski , A. 1982 . Managerial planning and control in precast industry . Journal of the Construction Division , 108 (2) : 299 – 313 .
  • Warszawski , A. 1990 . Industrialization and Robotics in Building: A Managerial Approach , New York : HarperCollins College Div .
  • Warszawski , A. 1999 . Industrialized and Automated Building Systems: A Managerial Approach , 2nd edn , London : Spon Press .
  • Weisbord , M. and Jandoff , S. 2005 . Faster, shorter, cheaper may be simple: it’s never easy . Journal of Applied Behavioral Science , 41 (1) : 70 – 82 .
  • Wong , A.K. and Yeh , S.H.K. 1985 . Housing a Nation: 25 Years of Public Housing in Singapore , Singapore : Maruzen Asia .
  • Xiang , W. , Fok , S.C. and Thimm , G. 2004 . Agent‐based composable simulation for virtual prototyping of fluid power system . Computers in Industry , 54 : 237 – 51 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.