1,094
Views
134
CrossRef citations to date
0
Altmetric
Original Articles

Determining the causal structure of rework influences in construction

Pages 505-517 | Published online: 21 Oct 2010

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (20)

Richard Brett, Derek Thomson & Andrew Dainty. (2022) Exploring craft in construction with short-term ethnography: reflections on a researcher’s prior insight. Construction Management and Economics 40:5, pages 359-373.
Read now
Shang Zhang, Hongxia Duan, Xianbo Zhao, Bo Xia, Yingbin Feng & Shane Galvin. (2021) Learning on rework management of construction projects: a case study. International Journal of Construction Management 21:3, pages 246-260.
Read now
Qinjun Liu, Gui Ye, Yingbin Feng, Chaoyun Wang & Yi Peng. (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management 20:4, pages 347-355.
Read now
Abdullatif Abdallah, Sadi Assaf & Mohammad A. Hassanain. (2019) Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architectural Engineering and Design Management 15:4, pages 282-296.
Read now
Lukumon O. Oyedele, Babatunde E. Jaiyeoba, Kabir O. Kadiri, Samuel O. Folagbade, Iyabo K. Tijani & Rafiu O. Salami. (2015) Critical factors affecting construction quality in Nigeria: evidence from industry professionals. International Journal of Sustainable Building Technology and Urban Development 6:2, pages 103-113.
Read now
Clare Shipton, Will Hughes & Dylan Tutt. (2014) Change management in practice: an ethnographic study of changes to contract requirements on a hospital project. Construction Management and Economics 32:7-8, pages 787-803.
Read now
Nuria Forcada, Gerard Rusiñol, Marcel MacArulla & Peter E. D. Love. (2014) Rework in highway projects. Journal of Civil Engineering and Management 20:4, pages 445-465.
Read now
Hany Shoukry Tawfek, Hossam El-Deen H. Mohammed & Mohamed E. Abdel Razek. (2012) Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model. HBRC Journal 8:2, pages 132-143.
Read now
Heng Li, H.L. Guo, Martin Skitmore, Ting Huang, K.Y.N. Chan & Greg Chan. (2011) Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong. Construction Management and Economics 29:3, pages 233-245.
Read now
Azlan-Shah Ali, S.N. Kamaruzzaman, Abdul-Samad Zulkiflee & M.R. Pitt. (2010) A Study of Design Performance of Refurbishment Projects in Malaysia. Journal of Asian Architecture and Building Engineering 9:2, pages 323-329.
Read now
Peter Hoonakker, Pascale Carayon & Todd Loushine. (2010) Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management & Business Excellence 21:9, pages 953-969.
Read now
Yehiel Rosenfeld. (2009) Cost of quality versus cost of non‐quality in construction: the crucial balance. Construction Management and Economics 27:2, pages 107-117.
Read now
Heng Li, Hongling Guo, MiroslawJ. Skibniewski & Martin Skitmore. (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics 26:9, pages 991-1000.
Read now
Todd W. Loushine, PeterL.T. Hoonakker, Pascale Carayon & Michael J. Smith. (2006) Quality and Safety Management in Construction. Total Quality Management & Business Excellence 17:9, pages 1171-1212.
Read now
H. A. Bassioni, A. D. F. Price & T. M. Hassan. (2005) Building a conceptual framework for measuring business performance in construction: an empirical evaluation. Construction Management and Economics 23:5, pages 495-507.
Read now
Peter E. D. Love & David J. Edwards. (2004) Forensic project management: The underlying causes of rework in construction projects. Civil Engineering and Environmental Systems 21:3, pages 207-228.
Read now
Peter E. D. Love, Purnendu Mandal, Jim Smith & Heng Li. (2000) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics 18:5, pages 567-574.
Read now
Peter E. D. Love & Heng Li. (2000) Quantifying the causes and costs of rework in construction. Construction Management and Economics 18:4, pages 479-490.
Read now
Peter E. D. Love, Heng Li, Zahir Irani & Olusegun Faniran. (2000) Total quality management and the learning organization: a dialogue for change in construction. Construction Management and Economics 18:3, pages 321-331.
Read now
P. E. D. Love & H. Li. (2000) Overcoming the problems associated with quality certification. Construction Management and Economics 18:2, pages 139-149.
Read now

Articles from other publishers (114)

Hazal Deniz Kaya & Irem Dikmen. (2024) Using System Dynamics to Support Strategic Digitalization Decisions. Journal of Construction Engineering and Management 150:4.
Crossref
Peter E.D. Love, Jane Matthews, Lavagnon A. Ika & Weili Fang. (2024) Rumsfeld's Heuristic: A Metaphor for Understanding the Knowns and Unknowns of Rework in Construction. IEEE Engineering Management Review 52:1, pages 43-59.
Crossref
Neil Govender, Samuel Laryea & Ron Watermeyer. (2023) Implications of competitive tendering on consulting engineering services in South Africa: a thematic analysis. Journal of Financial Management of Property and Construction.
Crossref
Shrouk Gharib, Ossama HosnyAhmed WalyIbrahim Abotaleb. (2023) System Dynamics as an Assistive Tool to Delay Analysis in Identifying Productivity Losses. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15:3.
Crossref
Nathan Van Den Bossche, Anke Blommaert & Bruno Daniotti. (2022) The impact of demographical, geographical and climatological factors on building defects in Belgium. International Journal of Building Pathology and Adaptation 41:3, pages 549-573.
Crossref
Nebiyu Kedir, Nasir Siraj & Aminah Robinson Fayek. (2023) Application of System Dynamics in Construction Engineering and Management: Content Analysis and Systematic Literature Review. Advances in Civil Engineering 2023, pages 1-22.
Crossref
Lars Stehn & Alexander Jimenez. (2023) Industrialized house building productivity growth. Construction Innovation 24:7, pages 143-162.
Crossref
Yuxuan Zhou, Xun WangJonathan GoslingMohamed M. Naim. (2023) The System Dynamics of Engineer-to-Order Construction Projects: Past, Present, and Future. Journal of Construction Engineering and Management 149:5.
Crossref
Aaron Anil Chadee, Hector Hugh Martin, Sihara Gallage, Kailas Sekhar Banerjee, Ryan Roopan, Upaka Rathnayake & Indrajit Ray. (2023) Risk Evaluation of Cost Overruns (COs) in Public Sector Construction Projects: A Fuzzy Synthetic Evaluation. Buildings 13:5, pages 1116.
Crossref
Ramin Asadi, James Olabode Bamidele Rotimi & Suzanne Wilkinson. (2023) Rework causes classification model with liable parties of the contract in construction projects. Frontiers in Built Environment 9.
Crossref
Yuxuan Zhou, Jonathan Gosling, Mohamed Naim & Xun Wang. 2023. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures. Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures 229 241 .
C. Amoah & Y. Sibelekwana. 2023. Sustainable Education and Development – Sustainable Industrialization and Innovation. Sustainable Education and Development – Sustainable Industrialization and Innovation 1 13 .
Érika Souza de Melo, Darli Vieira & Christophe Bredillet. (2022) Investigating the Dynamics of Engineering Design Rework for a Complex Aircraft Development Project: Lessons Learned From a Soft Systems Thinking Lens. Project Management Journal 53:6, pages 625-640.
Crossref
Fatemeh Mostofi, Vedat Toğan, Yunus Emre Ayözen & Onur Behzat Tokdemir. (2022) Predicting the Impact of Construction Rework Cost Using an Ensemble Classifier. Sustainability 14:22, pages 14800.
Crossref
Neil Govender, Samuel Laryea & Ron Watermeyer. (2022) Conceptual research methodology to investigate the relationship between fees and quality of professional service outputs. Journal of Engineering, Design and Technology.
Crossref
Ramin Ansari, Mohammad Khalilzadeh, Roohollah Taherkhani, Jurgita Antucheviciene, Darius Migilinskas & Shohreh Moradi. (2022) Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach. Sustainability 14:7, pages 4138.
Crossref
Manish Kumar Dixit, Varusha Venkatraj, Fatemeh Pariafsai & Jason Bullen. (2022) Site Logistics Factors Impacting Resource Use on Construction Sites: A Delphi Study. Frontiers in Built Environment 8.
Crossref
Peng Xu & Alejandro Salado. (2021) Modeling correction activities in the context of verification strategies. Systems Engineering 25:2, pages 173-188.
Crossref
Shohreh Moradi, Ramin Ansari & Roohollah Taherkhani. (2021) A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020. Iranian Journal of Science and Technology, Transactions of Civil Engineering 46:1, pages 15-31.
Crossref
Katayoon Taghizadeh, Esmatullah Noorzai, Zahra Zaman, Milad Amiri & Nayereh Samaee Rahnee. (2021) Identifying the Most Important Rework Factors in Building Projects and Providing a Solution to Reduce Their Effects. Journal of The Institution of Engineers (India): Series A 102:4, pages 1027-1043.
Crossref
Sahil Garg & Sudhir Misra. (2021) Causal model for rework in building construction for developing countries. Journal of Building Engineering 43, pages 103180.
Crossref
Woong-Gi Kim, Namhyuk Ham & Jae-Jun Kim. (2021) Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework. Sustainability 13:21, pages 11784.
Crossref
Dina A. SaadFarouk GharibMoheeb El-Said. (2021) Simulation of design changes impact in healthcare construction projects using system dynamics. Canadian Journal of Civil Engineering 48:5, pages 554-569.
Crossref
Xiaoxiao Xu & Patrick X. W. Zou. (2020) System dynamics analytical modeling approach for construction project management research: A critical review and future directions. Frontiers of Engineering Management 8:1, pages 17-31.
Crossref
Ewelina Kania, Elżbieta Radziszewska-Zielina & Grzegorz Śladowski. (2020) Communication and Information Flow in Polish Construction Projects. Sustainability 12:21, pages 9182.
Crossref
Diyana Syafiqah Abd Razak, Grant Mills & Aeli Roberts. (2020) A Strategic Approach to Mitigating Operational Failure Across Transitions. Project Management Journal 51:5, pages 474-488.
Crossref
Zezhou Wu, Kaijie Yang, Xiaofan Lai & Maxwell Fordjour Antwi-Afari. (2020) A Scientometric Review of System Dynamics Applications in Construction Management Research. Sustainability 12:18, pages 7474.
Crossref
Andrei A. Klishin, Alec Kirkley, David J. Singer & Greg van Anders. (2020) Robust design from systems physics. Scientific Reports 10:1.
Crossref
Ayman Raouf & Sami Al-Ghamdi. (2020) Managerial Practitioners’ Perspectives on Quality Performance of Green-Building Projects. Buildings 10:4, pages 71.
Crossref
Hosang Hyun, Hyunsoo Kim, Hyun-Soo Lee, Moonseo Park & Jeonghoon Lee. (2020) Integrated Design Process for Modular Construction Projects to Reduce Rework. Sustainability 12:2, pages 530.
Crossref
Mohammad Balouchi, Majid Gholhaki & Ali Niousha. (2019) Reworks causes and related costs in construction: case of Parand mass housing project in Iran. International Journal of Quality & Reliability Management 36:8, pages 1392-1408.
Crossref
Mingqiang LiuYun Le, Yi Hu, Bo Xia, Martin Skitmore & Xianyi Gao. (2019) SYSTEM DYNAMICS MODELING FOR CONSTRUCTION MANAGEMENT RESEARCH: CRITICAL REVIEW AND FUTURE TRENDS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 25:8, pages 730-741.
Crossref
Shahid HussainZhu FangWeiZaigham Ali. (2019) Examining Influence of Construction Projects’ Quality Factors on Client Satisfaction Using Partial Least Squares Structural Equation Modeling. Journal of Construction Engineering and Management 145:5.
Crossref
Mohammad A. Hassanain, Mohammad Aljuhani, Muizz O. Sanni-Anibire & Abdullatif Abdallah. (2018) Interdisciplinary design checklists for mechanical, electrical and plumbing coordination in building projects. Built Environment Project and Asset Management 9:1, pages 29-43.
Crossref
Ammad Hassan Khan, Ali ImranMuzamil Hussain. (2019) Evaluation of Quality during Construction Projects: A Case Study of Pakistan. Mehran University Research Journal of Engineering and Technology 38:1, pages 69-82.
Crossref
Alireza Golabchi, SangUk Han & Simaan AbouRizk. (2018) A simulation and visualization-based framework of labor efficiency and safety analysis for prevention through design and planning. Automation in Construction 96, pages 310-323.
Crossref
Ibrahim S. AbotalebIslam H. El-adaway. (2018) Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions. Journal of Management in Engineering 34:6.
Crossref
Ying Li, Li Jiang, Timothy R.B. Taylor & David N. Ford. (2017) Impact of Labour Controls on Tipping Point Dynamics in Large Complex Projects. Systems Research and Behavioral Science 35:6, pages 605-618.
Crossref
Ibrahim S. AbotalebIslam H. El-adaway. (2018) First Attempt Toward a Holistic Understanding of the Interdependent Rippled Impacts Associated with Out-of-Sequence Work in Construction Projects: System Dynamics Modeling Approach. Journal of Construction Engineering and Management 144:9.
Crossref
Emmanuel Chidiebere Eze, John Ebhohimen Idiake & Bashir Olanrewaju Ganiyu. (2018) Analysis of Rework Risk Triggers in the Nigerian Construction Industry. Organization, Technology and Management in Construction: an International Journal 10:1, pages 1778-1793.
Crossref
Christopher Boothman, Nigel Craig & James Sommerville. (2018) The UK housing developers’ five-star rating: fact or fiction?. Journal of Facilities Management 16:3, pages 269-283.
Crossref
Sadi Assaf, Mohammad A. Hassanain & Abdullatif Abdallah. (2018) Review and assessment of the causes of deficiencies in design documents for large construction projects. International Journal of Building Pathology and Adaptation 36:3, pages 300-317.
Crossref
Peter E. D. LovePauline TeoJohn Morrison. (2018) Revisiting Quality Failure Costs in Construction. Journal of Construction Engineering and Management 144:2.
Crossref
Hossein Kiani, Seyed Hossein Hosseini & Farshid Abdi. (2018) A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects. Interdisciplinary Description of Complex Systems 16:1, pages 40-59.
Crossref
Samiaah Al-Tmeemy & Bassam Al Bassam. (2018) An empirical analysis of the relationship between cost of control activities and project management success. MATEC Web of Conferences 162, pages 02036.
Crossref
. 2018. Performance and Improvement of Green Construction Projects. Performance and Improvement of Green Construction Projects 303 332 .
Hwang Bon-Gang. 2018. Performance and Improvement of Green Construction Projects. Performance and Improvement of Green Construction Projects 211 233 .
Hwang Bon-Gang. 2018. Performance and Improvement of Green Construction Projects. Performance and Improvement of Green Construction Projects 165 179 .
Grit Ngowtanasuwan & Bonaventura H.W. Hadikusumo. (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation 17:4, pages 457-474.
Crossref
Jeffrey Boon Hui Yap, Pak Lian Low & Chen Wang. (2017) Rework in Malaysian building construction: impacts, causes and potential solutions. Journal of Engineering, Design and Technology 15:5, pages 591-618.
Crossref
Jeffrey Boon Hui Yap, Hamzah Abdul-Rahman & Wang Chen. (2017) Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management 35:7, pages 1253-1271.
Crossref
Nuria ForcadaMarta GangolellsMiquel CasalsMarcel Macarulla. (2017) Factors Affecting Rework Costs in Construction. Journal of Construction Engineering and Management 143:8.
Crossref
Majid Parchami Jalal & Shahab Shoar. (2017) A hybrid SD-DEMATEL approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management 24:4, pages 629-651.
Crossref
Nuria ForcadaAngela P. AlvarezPeter E. D. LoveDavid J. Edwards. (2017) Rework in Urban Renewal Projects in Colombia. Journal of Infrastructure Systems 23:2.
Crossref
David C. Wynn & Claudia M. Eckert. (2016) Perspectives on iteration in design and development. Research in Engineering Design 28:2, pages 153-184.
Crossref
Subashini Suresh, Raymond Olayinka, Ezekiel Chinyio & Suresh Renukappa. (2017) Impact of knowledge management on construction projects. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 170:1, pages 27-43.
Crossref
Mellania Maseko Chipo. (2017) Corporate control: The root causes of reworks in the construction of projects.. Corporate Ownership and Control 15:1, pages 213-223.
Crossref
Sheila Belayutham, Vicente A. González & Tak Wing Yiu. (2016) Clean–lean administrative processes: a case study on sediment pollution during construction. Journal of Cleaner Production 126, pages 134-147.
Crossref
Luqman Oyekunle Oyewobi, Ojo Abiola-Falemu & Olajide Timothy Ibironke. (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology 14:2, pages 214-237.
Crossref
John Muhumuza Kakitahi, Henry Mwanaki Alinaitwe, Anne Landin & Simon James Mone. (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology 14:2, pages 238-251.
Crossref
Xianbo Zhao, Bon-Gang Hwang & Yan Gao. (2016) A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects. Journal of Cleaner Production 115, pages 203-213.
Crossref
Sheila Belayutham, Vicente A. González & Tak Wing Yiu. (2016) The dynamics of proximal and distal factors in construction site water pollution. Journal of Cleaner Production 113, pages 54-65.
Crossref
Jeffrey Boon Hui Yap, Hamzah Abdul-Rahman & Chen Wang. (2016) A Conceptual Framework for Managing Design Changes in Building Construction. MATEC Web of Conferences 66, pages 00021.
Crossref
Wilson Udo Udofia, B. H. W. Hadikusumo & Djoen San Santoso. (2015) Road project termination and rebidding strategies in Nigeria. Journal of Financial Management of Property and Construction 20:3, pages 208-234.
Crossref
Gui YeZhigang JinBo XiaMartin Skitmore. (2015) Analyzing Causes for Reworks in Construction Projects in China. Journal of Management in Engineering 31:6.
Crossref
Raymond Olayinka, Subashini Suresh & Ezekiel Chinyio. (2015) Impact of knowledge management on the cost of poor quality. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 168:4, pages 177-188.
Crossref
Muhammad Yousaf Sadiq Awan & Dr Muhammad Maqbool Sadiq Awan. (2015) Perception Based Definition of Construction Quality in Pakistan. Journal of Construction Engineering and Project Management 5:2, pages 24-34.
Crossref
John Muhumuza Kakitahi, Henry Mwanaki Alinaitwe, Anne Landin & Steven Peace Mudaaki. (2015) A study of non-compliance with quality requirements in Uganda. Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 168:1, pages 22-42.
Crossref
Ke Chen, Weisheng Lu & Yi Peng. 2015. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate. Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate 1091 1099 .
Bon-Gang Hwang, Xianbo Zhao & Thi Hong van Do. (2014) Influence of Trade-Level Coordination Problems on Project Productivity. Project Management Journal 45:5, pages 5-14.
Crossref
Ying LiTimothy R. B. Taylor. (2014) Modeling the Impact of Design Rework on Transportation Infrastructure Construction Project Performance. Journal of Construction Engineering and Management 140:9.
Crossref
SangUk Han, Farzaneh Saba, SangHyun Lee, Yasser Mohamed & Feniosky Peña-Mora. (2014) Toward an understanding of the impact of production pressure on safety performance in construction operations. Accident Analysis & Prevention 68, pages 106-116.
Crossref
Fangxiao Liu, Abdou Karim Jallow, Chimay J. Anumba & Dinghao Wu. (2014) A Framework for Integrating Change Management with Building Information Modeling. A Framework for Integrating Change Management with Building Information Modeling.
Bon-Gang Hwang, Xianbo Zhao & Khang Jin Goh. (2014) Investigating the client-related rework in building projects: The case of Singapore. International Journal of Project Management 32:4, pages 698-708.
Crossref
John WanbergChristofer HarperMatthew R. HallowellSathyanarayanan Rajendran. (2013) Relationship between Construction Safety and Quality Performance. Journal of Construction Engineering and Management 139:10.
Crossref
John Muhumuza Kakitahi, Anne Landin & Henry M. Alinaitwe. (2013) An exploratory study of rework causality in Uganda. Construction Innovation 13:3, pages 266-280.
Crossref
Venkatachalam SenthilkumarKoshy Varghese. (2013) Case Study–Based Testing of Design Interface Management System. Journal of Management in Engineering 29:3, pages 279-288.
Crossref
Jonathan Gosling, Paola Sassi, Mohamed Naim & Robert Lark. (2013) Adaptable buildings: A systems approach. Sustainable Cities and Society 7, pages 44-51.
Crossref
Sammy K.M. Wan, Mohan Kumaraswamy & Davis T.C. Liu. (2013) Dynamic modelling of building services projects: A simulation model for real-life projects in the Hong Kong construction industry. Mathematical and Computer Modelling 57:9-10, pages 2054-2066.
Crossref
Serdar Durdyev, Syuhaida Ismail & Nooh Abu Bakar. (2013) Construction Productivity in Turkmenistan: Survey of the Constraining Factors. International Journal of e-Education, e-Business, e-Management and e-Learning.
Crossref
Di ZhangCarl T. HaasPaul M. GoodrumCarlos H. CaldasRobin Granger. (2012) Construction Small-Projects Rework Reduction for Capital Facilities. Journal of Construction Engineering and Management 138:12, pages 1377-1385.
Crossref
Shahid Rashid & Richard Weston. (2012) Design of an Integrated Methodology for Analytical Design of Complex Supply Chains. Advances in Decision Sciences 2012, pages 1-19.
Crossref
Yang Miang Goh, Peter E. D. Love, Helen Brown & Jeffery Spickett. (2011) Organizational Accidents: A Systemic Model of Production versus Protection. Journal of Management Studies 49:1, pages 52-76.
Crossref
Tarek Hegazy, Mohamed Said & Moustafa Kassab. (2011) Incorporating rework into construction schedule analysis. Automation in Construction 20:8, pages 1051-1059.
Crossref
Bjørn Andersen, Nils O.E. Olsson, Lars E. Onsøyen & Ingrid Spjelkavik. (2011) Post‐project changes: occurrence, causes, and countermeasures. International Journal of Managing Projects in Business 4:2, pages 308-328.
Crossref
Peter E.D. Love, Peter R. Davis, Joanne M. Ellis & S.O. Cheung. (2010) A systemic view of dispute causation. International Journal of Managing Projects in Business 3:4, pages 661-680.
Crossref
Mohsen Jahangirian, Tillal Eldabi, Aisha Naseer, Lampros K. Stergioulas & Terry Young. (2010) Simulation in manufacturing and business: A review. European Journal of Operational Research 203:1, pages 1-13.
Crossref
Thanapun PrasertrungruangB. H. W. Hadikusumo. (2009) Modeling the Dynamics of Heavy Equipment Management Practices and Downtime in Large Highway Contractors. Journal of Construction Engineering and Management 135:10, pages 939-947.
Crossref
S Rashid, T Masood & R H Weston. (2009) Unified modelling in support of organization design and change. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 223:8, pages 1055-1079.
Crossref
Ming Sun & Xianhai Meng. (2009) Taxonomy for change causes and effects in construction projects. International Journal of Project Management 27:6, pages 560-572.
Crossref
David A. Ortiz De Orue, John E. Taylor, Arpamart Chanmeka & Runi Weerasooriya. (2009) Robust Project Network Design. Project Management Journal 40:2, pages 81-93.
Crossref
Bon-Gang HwangStephen R. ThomasCarl T. HaasCarlos H. Caldas. (2009) Measuring the Impact of Rework on Construction Cost Performance. Journal of Construction Engineering and Management 135:3, pages 187-198.
Crossref
S. Senaratne & M.G. Sexton. (2009) Role of knowledge in managing construction project change. Engineering, Construction and Architectural Management 16:2, pages 186-200.
Crossref
Timothy R. B. Taylor & David N. Ford. (2008) Managing Tipping Point Dynamics in Complex Construction Projects. Journal of Construction Engineering and Management 134:6, pages 421-431.
Crossref
Peter E. D. Love, David J. Edwards & Zahir Irani. (2008) Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework. IEEE Transactions on Engineering Management 55:2, pages 234-247.
Crossref
James Sommerville. (2007) Defects and rework in new build: an analysis of the phenomenon and drivers. Structural Survey 25:5, pages 391-407.
Crossref
Yacine Rezgui. (2006) Ontology-Centered Knowledge Management Using Information Retrieval Techniques. Journal of Computing in Civil Engineering 20:4, pages 261-270.
Crossref
NIRMAL KUMAR ACHARYA, YOUNG-DAI LEE & HAE-MAN IM. (2006) DESIGN ERRORS: TRAGIC FOR THE CLIENTS. Journal of Construction Research 07:01n02, pages 177-190.
Crossref
James Sommerville & Julie McCosh. (2006) Defects in new homes: an analysis of data on 1,696 new UK houses. Structural Survey 24:1, pages 6-21.
Crossref
James Sommerville, Nigel Craig & Sarah Bowden. (2004) The standardisation of construction snagging. Structural Survey 22:5, pages 251-258.
Crossref
P.E.D. Love, Z. Irani & D.J. Edwards. (2004) A Rework Reduction Model for Construction Projects. IEEE Transactions on Engineering Management 51:4, pages 426-440.
Crossref
M. Y. L. ChewS. S. TanK. H. Kang. (2004) Building Maintainability—Review of State of the Art. Journal of Architectural Engineering 10:3, pages 80-87.
Crossref
Peter E.D. Love & David J. Edwards. (2004) Determinants of rework in building construction projects. Engineering, Construction and Architectural Management 11:4, pages 259-274.
Crossref
Heng Li, Yang Cao & Ming Lu. (2004) Semiautomated Detection of Design Errors in 2D Drawings Using 3D Reconstruction. Computer-Aided Civil and Infrastructure Engineering 19:4, pages 288-294.
Crossref
Peter E.D. Love & Zahir Irani. (2003) A project management quality cost information system for the construction industry. Information & Management 40:7, pages 649-661.
Crossref
S. Chritamara, S.O. Ogunlana & N.L. Bach. (2002) System dynamics modeling of design and build construction projects. Construction Innovation 2:4, pages 269-295.
Crossref
P.E.D. Love, G.D. Holt, L.Y. Shen, H. Li & Z. Irani. (2002) Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management 20:6, pages 425-436.
Crossref
Per-Erik JosephsonBengt LarssonHeng Li. (2002) Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry. Journal of Management in Engineering 18:2, pages 76-83.
Crossref
Peter E. D. Love. (2002) Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management 128:1, pages 18-29.
Crossref
Low Sui Pheng & Darren Wee. (2001) Improving maintenance and reducing building defects through ISO 9000. Journal of Quality in Maintenance Engineering 7:1, pages 6-24.
Crossref
H. LI, P.E.D. LOVE & D.S. DREW. (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management 7:3, pages 211-220.
Crossref
P.E.D. LOVE, J. SMITH, G.J. TRELOAR & H. LI. (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management 7:2, pages 191-201.
Crossref
P.E.D. Love, J. Smith & H. Li. (1999) The propagation of rework benchmark metrics for construction. International Journal of Quality & Reliability Management 16:7, pages 638-658.
Crossref
Heng Li & P.E.D. Love. (1998) Visualization of building interior design to reduce rework. Visualization of building interior design to reduce rework.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.