604
Views
22
CrossRef citations to date
0
Altmetric
Original Articles

Dynamic monitoring and control of a critical chain project based on phase buffer allocation

, & ORCID Icon
Pages 1966-1977 | Received 16 Feb 2016, Accepted 04 Dec 2017, Published online: 06 Feb 2018

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (2)

Shakib Zohrehvandi, Mario Vanhoucke, Mohammad Khalilzadeh, Maghsoud Amiri & Shahram Shadrokh. (2023) A fuzzy project buffer management algorithm: a case study in the construction of a renewable project. International Journal of Construction Management 23:12, pages 2134-2143.
Read now
Junguang Zhang & Meihua Wang. (2023) Differential buffer monitoring for critical chain projects based on comprehensive activity reliability. Journal of the Operational Research Society 74:9, pages 2064-2079.
Read now

Articles from other publishers (20)

Moslem Sheikhkhoshkar, Hind Bril El Haouzi, Alexis Aubry & Farook Hamzeh. (2024) An advanced exploration of functionalities as the underlying principles of construction control metrics. Smart and Sustainable Built Environment 13:3, pages 644-676.
Crossref
晶 徐. (2024) Research on Buffer Management Framework for Project Schedule Control in Rework Scenarios. Management Science and Engineering 13:02, pages 428-441.
Crossref
Tekin Kose, Tuba Bakici & Öncü Hazir. (2024) Completing Projects on Time and Budget: A Study on the Analysis of Project Monitoring Practices Using Real Data. IEEE Transactions on Engineering Management 71, pages 4051-4062.
Crossref
Junguang Zhang & Qing Han. (2022) Adaptive capacity constraint buffer monitoring of the multi-project system based on the relevance of drum activities. Kybernetes 52:10, pages 4668-4685.
Crossref
Claudio Szwarcfiter, Yale T. Herer & Avraham Shtub. (2023) Shortening the project schedule: solving multimode chance-constrained critical chain buffer management using reinforcement learning. Annals of Operations Research.
Crossref
Claudio Szwarcfiter, Yale T. Herer & Avraham Shtub. (2023) Balancing Project Schedule, Cost, and Value under Uncertainty: A Reinforcement Learning Approach. Algorithms 16:8, pages 395.
Crossref
Junguang Zhang & Qing Han. (2023) Buffer Monitoring of Critical Chain Projects Based on Support Vector Machine Prediction. KSCE Journal of Civil Engineering 27:7, pages 2745-2755.
Crossref
Shakib Zohrehvandi, Roya Soltani, Dimitri Lefebvre, Mehrnoosh Zohrehvandi & Alexandra Tenera. 2023. Science, Engineering Management and Information Technology. Science, Engineering Management and Information Technology 81 94 .
Shakib Zohrehvandi & Lucia Knapčíková. 2023. 7th EAI International Conference on Management of Manufacturing Systems. 7th EAI International Conference on Management of Manufacturing Systems 183 195 .
Qiaojuan Liu. (2022) Multimedia Recognition and Monitoring of Respiration and Heart Rate VO2 Max in Exercise Training Based on Regression Equation. Advances in Multimedia 2022, pages 1-7.
Crossref
Navid Nickdoost, Juyeong Choi, Yassir AbdelRazigJohn Sobanjo. (2022) A Project Life-Cycle Approach to Managing Procrastination in Construction Projects: State-of-the-Art Review. Journal of Construction Engineering and Management 148:5.
Crossref
Shakib Zohrehvandi, Mohammad Khalilzadeh, Maghsoud Amiri & Shahram Shadrokh. (2021) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management 29:2, pages 716-738.
Crossref
Jie Song, Annelies Martens & Mario Vanhoucke. (2022) Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control. European Journal of Operational Research 297:2, pages 451-466.
Crossref
Ramin Ansari, Mohammad Khalilzadeh & M. Reza Hosseini. (2021) A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. KSCE Journal of Civil Engineering 26:3, pages 1005-1013.
Crossref
Meng Xiao & Yanfeng Chu. 2022. City, Society, and Digital Transformation. City, Society, and Digital Transformation 331 344 .
Lei Xiao, Li Bie & Xue Bai. (2021) Controlling the schedule risk in green building projects: Buffer management framework with activity dependence. Journal of Cleaner Production 278, pages 123852.
Crossref
Jie Song, Annelies Martens & Mario Vanhoucke. (2020) The impact of a limited budget on the corrective action taking process. European Journal of Operational Research 286:3, pages 1070-1086.
Crossref
Shakib Zohrehvandi, Mohammad Khalilzadeh, Maghsoud Amiri & Shahram Shadrokh. (2020) A heuristic buffer sizing algorithm for implementing a renewable energy project. Automation in Construction 117, pages 103267.
Crossref
Shakib Zohrehvandi, Mario Vanhoucke & Mohammad Khalilzadeh. (2020) A project buffer and resource management model in energy sector; a case study in construction of a wind farm project. International Journal of Energy Sector Management 14:6, pages 1123-1142.
Crossref
Xuejun Hu, Jianjiang Wang & Kaijun Leng. (2019) The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework. Asia-Pacific Journal of Operational Research 36:03, pages 1950010.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.