Dynamic monitoring and control of a critical chain project based on phase buffer allocation

, & ORCID Icon
Pages 1966-1977 | Received 16 Feb 2016, Accepted 04 Dec 2017, Published online: 06 Feb 2018

References

  • Agarwal, A., & Larson, D. (2014). Mitigating behavioral outcomes in a multi-project environment: A modified CCPM model. Academy of Information and Management Sciences Journal, 17(2), 1–13.
  • Bendoly, E., Swink, M., & Simpson, W. P. (2014). Prioritizing and monitoring concurrent project work: Effects on switching behavior. Production and Operations Management, 23(5), 847–860.10.1111/poms.2014.23.issue-5
  • Bevilacqua, M., Ciarapica, F. E., & Giacchetta, G. (2009). Critical chain and risk analysis applied to high-risk industry maintenance: A case study. International Journal of Project Management, 27(4), 419–432.10.1016/j.ijproman.2008.06.006
  • Bie, L., & Cui, N. (2010). Dynamic buffer monitoring research of critical chain. Chinese Journal of Management Science, 6, 97–103.
  • Bie, L., Cui, N., & Zhang, X. (2012). Buffer sizing approach with dependence assumption between activities in critical chain scheduling. International Journal of Production Research, 50(24), 7343–7356.10.1080/00207543.2011.649096
  • Bie, L., Cui, N., Zhao, Y., & Zhang, X. (2013). Setting distributed capacity constraint buffer in critical chain multi-project scheduling. Journal of Industrial Engineering and Engineering Management, 27(2), 022.
  • Chen, J. F., Hsieh, H. N., & Do, Q. H. (2015). Evaluating teaching performance based on fuzzy AHP and comprehensive evaluation approach. Applied Soft Computing, 28, 100–108.10.1016/j.asoc.2014.11.050
  • Chu, C. C. (2008). Buffer sizing and critical chain project management. Computer Integrated Manufacturing Systems, 14(5), 1029–1035.
  • Colin, J., & Vanhoucke, M. (2015). A comparison of the performance of various project control methods using earned value management systems. Expert Systems with Applications, 42(6), 3159–3175.10.1016/j.eswa.2014.12.007
  • Goldratt, E. M. (1997). Critical chain: A business novel. Great Barrington, MA: North River Press.
  • González, V., Alarcón, L. F., & Yiu, T. W. (2013). Integrated methodology to design and manage work-in-process buffers in repetitive building projects. Journal of the Operational Research Society, 64(8), 1182–1193.10.1057/jors.2012.163
  • Hazır, Ö. (2015). A review of analytical models, approaches and decision support tools in project monitoring and control. International Journal of Project Management, 33, 808–815.10.1016/j.ijproman.2014.09.005
  • Herroelen, W. (2005). Project scheduling – Theory and practice. Production and Operations Management, 14(4), 413–432.
  • Herroelen, W. (2013). Discussion of “probabilistic estimation and allocation of project time contingency” by Gabriel A. Barraza. Journal of Construction Engineering and Management, 139(2), 253–255.10.1061/(ASCE)CO.1943-7862.0000466
  • Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19(5), 559–577.10.1016/S0272-6963(01)00054-7
  • Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289–306.10.1016/j.ejor.2004.04.002
  • Hu, X., Cui, N., & Demeulemeester, E. (2015). Effective expediting to improve project due date and cost performance through buffer management. International Journal of Production Research, 53(5), 1460–1471.10.1080/00207543.2014.948972
  • Hu, X., Cui, N., Demeulemeester, E., & Bie, L. (2016). Incorporation of activity sensitivity measures into buffer management to manage project schedule risk. European Journal of Operational Research, 249(2), 717–727.10.1016/j.ejor.2015.08.066
  • Khemakhem, M. A., & Chtourou, H. (2013). Efficient robustness measures for the resource-constrained project scheduling problem. International Journal of Industrial and Systems Engineering, 14(2), 245–267.10.1504/IJISE.2013.053738
  • Kolb, O., & Göttlich, S. (2015). A continuous buffer allocation model using stochastic processes. European Journal of Operational Research, 242(3), 865–874.10.1016/j.ejor.2014.10.065
  • Kuo, T. C., Chang, S. H., & Huang, S. N. (2009). Due-date performance improvement using TOC’s aggregated time buffer method at a wafer fabrication factory. Expert Systems with Applications, 36(2), 1783–1792.10.1016/j.eswa.2007.12.038
  • Leach, L. P. (2005). Critical chain project management (pp. 183–197). London: Artech House.
  • Li, H., Lu, L., & Chen, G. (2009). A new buffer management method in critical chain project management. Project Management Technology, 10, 68–72.
  • Lin, J., Qian, Y., Cui, W., & Goh, T. N. (2014). An effective approach for scheduling coupled activities in development projects. European Journal of Operational Research, 243(1), 97–108.
  • Long, L. D., & Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26(6), 688–698.10.1016/j.ijproman.2007.09.012
  • Nazam, M., Xu, J., Tao, Z., Ahmad, J., & Hashim, M. (2015). A fuzzy AHP-TOPSIS framework for the risk assessment of green supply chain implementation in the textile industry. International Journal of Supply and Operations Management, 2(1), 548–568.
  • Newbold, R. C. (1998). Project management in the fast lane: Applying the theory of constraints. Boca Raton, FL: CRC Press.
  • Poshdar, M., González, V. A., Raftery, G. M., Orozco, F., Romeo, J. S., & Forcael, E. (2016). A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10), 1–12.
  • Rand, G. K. (2000). Critical chain: The theory of constraints applied to project management. International Journal of Project Management, 18(3), 173–177.10.1016/S0263-7863(99)00019-8
  • Shi, Q., Wang, Y. T., & Gong, T. (2012). An improved approach for project buffer sizing and evaluation. Systems Engineering-Theory & Practice, 32(8), 1739–1746.
  • Tukel, O. I., Rom, W. O., & Eksioglu, S. D. (2006). An investigation of buffer sizing techniques in critical chain scheduling. European Journal of Operational Research, 172(2), 401–416.10.1016/j.ejor.2004.10.019
  • Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-time of a product development process. International Journal of Production Economics, 160, 202–212.10.1016/j.ijpe.2014.11.002
  • Wang, X. W., & Liu, Y. S. (2013). The research of critical chain buffer sizing and monitoring. Construction Economy, 2, 42–45.
  • Wu, H. H., Chen, C. P., Tsai, C. H., & Tsai, T. P. (2010). A study of an enhanced simulation model for TOC supply chain replenishment system under capacity constraint. Expert Systems with Applications, 37(9), 6435–6440.10.1016/j.eswa.2010.02.074
  • Xie, L., Wang, Q., & Xiao, J. (2010). Reducing plan change: A risk driven software project buffer allocation method. Journal of Software, 21(12), 3029–3041.
  • Yang, K., Zhao, R., & Lan, Y. (2016). Impacts of uncertain project duration and asymmetric risk sensitivity information in project management. International Transactions in Operational Research, 23, 749–774.10.1111/itor.2016.23.issue-4
  • Yuan, K. J., Chang, S. H., & Li, R. K. (2003). Enhancement of Theory of Constraints replenishment using a novel generic buffer management procedure. International Journal of Production Research, 41(4), 725–740.10.1080/0020754031000065502
  • Zhang, J., Jia, S., & Diaz, E. (2015). A new buffer sizing approach based on the uncertainty of project activities. Concurrent Engineering, 23(1), 3–12.10.1177/1063293X14561871
  • Zhang, J., Shi, R., & Diaz, E. (2015). Dynamic monitoring and control of software project effort based on an effort buffer. Journal of the Operational Research Society, 66(9), 1555–1565.10.1057/jors.2014.125
  • Zhang, J., Song, X., Chen, H., & (Sandy) Shi, R. (2015). Optimisation of critical chain sequencing based on activities’ information flow interactions. International Journal of Production Research, 53(20), 6231–6241.10.1080/00207543.2015.1043157
  • Zhang, J., Song, X., & Díaz, E. (2016). Project buffer sizing of a critical chain based on comprehensive resource tightness. European Journal of Operational Research, 248(1), 174–182.10.1016/j.ejor.2015.07.009
  • Zhao, Z. Y., You, W. Y., & Zuo, J. (2010). Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), 1056–1060.10.1061/(ASCE)CO.1943-7862.0000209
  • Zhong, G., Qi, J., & Su, Z. (2009). Study of method for buffer placing in critical chain management with fuzzy duration. Technology Economics, 28(7), 48–50.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.