Publication Cover
Statistics
A Journal of Theoretical and Applied Statistics
Volume 38, 2004 - Issue 1
226
Views
60
CrossRef citations to date
0
Altmetric
Original Articles

Are estimated control charts in control?

Pages 67-79 | Received 25 Feb 2002, Accepted 19 Aug 2003, Published online: 11 Oct 2011

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (27)

Rostyslav Bodnar, Taras Bodnar & Wolfgang Schmid. (2024) Control charts for high-dimensional time series with estimated in-control parameters. Sequential Analysis 43:1, pages 103-129.
Read now
Eftychia Mamzeridou & Αthanasios Rakitzis. (2023) On the design and performance of upper one-sided Shewhart charts for zero-inflated Poisson processes with estimated parameters. Quality Technology & Quantitative Management 0:0, pages 1-22.
Read now
Nesma A. Saleh, Aya A. Aly & Mahmoud A. Mahmoud. (2022) Effect of contaminated phase I data on the phase II – EWMA control chart performance under non-normality. Communications in Statistics - Simulation and Computation 0:0, pages 1-19.
Read now
Mosquera Jaime, Aparisi Francisco & Epprecht K. Eugenio. (2021) Guaranteeing acceptable in-control and out-of-control performance of joint X ̅-S control charts with estimated parameters. Quality Technology & Quantitative Management 18:6, pages 701-717.
Read now
Sajid Ali. (2020) A predictive Bayesian approach to EWMA and CUSUM charts for time-between-events monitoring. Journal of Statistical Computation and Simulation 90:16, pages 3025-3050.
Read now
Mandla D. Diko, Rob Goedhart & Ronald J. M. M. Does. (2020) A head-to-head comparison of the out-of-control performance of control charts adjusted for parameter estimation. Quality Engineering 32:4, pages 643-652.
Read now
Rob Goedhart, Marit Schoonhoven & Ronald J.M.M. Does. (2020) Nonparametric control of the conditional performance in statistical process monitoring. Journal of Quality Technology 52:4, pages 355-369.
Read now
Lorena D. Loureiro, Eugenio K. Epprecht, S. Chakraborti & Felipe S. Jardim. (2018) In-control performance of the joint Phase II − S control charts when parameters are estimated. Quality Engineering 30:2, pages 253-267.
Read now
Alireza Faraz, Cédric Heuchenne & Erwin Saniga. (2018) An exact method for designing Shewhart and S2 control charts to guarantee in-control performance. International Journal of Production Research 56:7, pages 2570-2584.
Read now
Rob Goedhart, Michele M. da Silva, Marit Schoonhoven, Eugenio K. Epprecht, Subha Chakraborti, Ronald J. M. M. Does & Álvaro Veiga. (2017) Shewhart control charts for dispersion adjusted for parameter estimation. IISE Transactions 49:8, pages 838-848.
Read now
Olha Bodnar & Wolfgang Schmid. (2017) CUSUM control schemes for monitoring the covariance matrix of multivariate time series. Statistics 51:4, pages 722-744.
Read now
Rob Goedhart, Marit Schoonhoven & Ronald J. M. M. Does. (2017) Guaranteed In-Control Performance for the Shewhart X and X Control Charts. Journal of Quality Technology 49:2, pages 155-171.
Read now
William H. Woodall. (2017) Bridging the gap between theory and practice in basic statistical process monitoring. Quality Engineering 29:1, pages 2-15.
Read now
Nesma A. Saleh, Inez M. Zwetsloot, Mahmoud A. Mahmoud & William H. Woodall. (2016) CUSUM charts with controlled conditional performance under estimated parameters. Quality Engineering 28:4, pages 402-415.
Read now
Matthew J. Keefe, William H. Woodall & L. Allison Jones-Farmer. (2015) The Conditional In-Control Performance of Self-Starting Control Charts. Quality Engineering 27:4, pages 488-499.
Read now
Nesma A. Saleh, Mahmoud A. Mahmoud, L. Allison Jones-Farmer, Inez Zwetsloot & William H. Woodall. (2015) Another Look at the EWMA Control Chart with Estimated Parameters. Journal of Quality Technology 47:4, pages 363-382.
Read now
Eugenio K. Epprecht, Lorena D. Loureiro & S. Chakraborti. (2015) Effect of the Amount of Phase I Data on the Phase II Performance of S2 and S Control Charts. Journal of Quality Technology 47:2, pages 139-155.
Read now
Nesma A. Saleh, Mahmoud A. Mahmoud, Matthew J. Keefe & William H. Woodall. (2015) The Difficulty in Designing Shewhart X̄ and X Control Charts with Estimated Parameters. Journal of Quality Technology 47:2, pages 127-138.
Read now
L. Allison Jones-Farmer, William H. Woodall, Stefan H. Steiner & Charles W. Champ. (2014) An Overview of Phase I Analysis for Process Improvement and Monitoring. Journal of Quality Technology 46:3, pages 265-280.
Read now
Vasyl Golosnoy & Wolfgang Schmid. (2007) EWMA Control Charts for Monitoring Optimal Portfolio Weights. Sequential Analysis 26:2, pages 195-224.
Read now
Willem Albers & WilbertC. M. Kallenberg. (2007) Shewhart Control Charts in New Perspective. Sequential Analysis 26:2, pages 123-151.
Read now
Willis A. Jensen, L. Allison Jones-Farmer, Charles W. Champ & William H. Woodall. (2006) Effects of Parameter Estimation on Control Chart Properties: A Literature Review. Journal of Quality Technology 38:4, pages 349-364.
Read now
Willem Albers, WilbertC.M. Kallenberg & Sri Nurdiati. (2005) Exceedance probabilities for parametric control charts. Statistics 39:5, pages 429-443.
Read now
Willem Albers & Wilbert C. M. Kallenberg. (2005) New Corrections for Old Control Charts. Quality Engineering 17:3, pages 467-473.
Read now
Willem Albers & Wilbert C. M. Kallenberg. (2004) Empirical Non-Parametric Control Charts: Estimation Effects and Corrections. Journal of Applied Statistics 31:3, pages 345-360.
Read now

Articles from other publishers (33)

Mosab Alqurashi, Subhabrata Chakraborti & Chase Holcombe. (2022) Exact tolerance interval with specified tail probabilities and a control chart for the sample variance. Quality and Reliability Engineering International 39:1, pages 283-301.
Crossref
Subhabrata Chakraborti & Athanasios C. Rakitzis. 2014. Wiley StatsRef: Statistics Reference Online. Wiley StatsRef: Statistics Reference Online 1 18 .
Syed Muhammad Muslim Raza, Sajid Ali, Ismail Shah & Muhammad Moeen Butt. (2020) Conditional mean‐ and median‐based cumulative sum control charts for Weibull data. Quality and Reliability Engineering International 37:2, pages 502-526.
Crossref
Rob Goedhart. 2021. Frontiers in Statistical Quality Control 13. Frontiers in Statistical Quality Control 13 13 23 .
Ronald J.M.M. Does, Rob Goedhart & William H. Woodall. (2020) On the design of control charts with guaranteed conditional performance under estimated parameters. Quality and Reliability Engineering International 36:8, pages 2610-2620.
Crossref
Chia Huang Wu & Wen Lea Pearn. (2020) Yield Assessment for Dynamic Etching Processes With Variance Change. IEEE Transactions on Components, Packaging and Manufacturing Technology 10:10, pages 1745-1753.
Crossref
Chia‐Huang Wu. (2020) Modified processes capability assessment with dynamic mean shift. Quality and Reliability Engineering International 36:4, pages 1258-1271.
Crossref
Nasir Abbas. (2019) A robust S 2 control chart with Tukey's and MAD outlier detectors . Quality and Reliability Engineering International 36:1, pages 403-413.
Crossref
Burcu Aytaçoğlu & Özlem Türker Bayrak. (2019) Effect of estimation under nonnormality on the phase II performance of linear profile monitoring approaches. Quality and Reliability Engineering International 35:7, pages 2429-2441.
Crossref
Jaime Mosquera, Francisco Aparisi & Eugenio K. Epprecht. (2019) Design of an X̅ control chart with guaranteed joint in‐control and out‐of‐control performances when the mean and variance are estimated . Quality and Reliability Engineering International 35:7, pages 2097-2114.
Crossref
Taras Lazariv & Wolfgang Schmid. (2018) Surveillance of non-stationary processes. AStA Advances in Statistical Analysis 103:3, pages 305-331.
Crossref
Felipe S. Jardim, Subhabrata Chakraborti & Eugenio K. Epprecht. (2019) X¯ Chart with Estimated Parameters: The Conditional ARL Distribution and New Insights . Production and Operations Management 28:6, pages 1545-1557.
Crossref
Christian H. Weiß & Murat Caner Testik. (2018) Risk‐based metrics for performance evaluation of control charts. Quality and Reliability Engineering International 35:1, pages 280-291.
Crossref
Christian H. Weiß, Detlef Steuer, Carsten Jentsch & Murat Caner Testik. (2018) Guaranteed conditional ARL performance in the presence of autocorrelation. Computational Statistics & Data Analysis 128, pages 367-379.
Crossref
Francisco Aparisi, Jaime Mosquera & Eugenio K. Epprecht. (2018) Simultaneously guaranteeing the in‐control and out‐of‐control performances of the S 2 control chart with estimated variance . Quality and Reliability Engineering International 34:6, pages 1110-1126.
Crossref
Christian Weiß. 2018. An Introduction to Discrete‐Valued Time Series. An Introduction to Discrete‐Valued Time Series 257 274 .
Meng J. Zhao & Anne R. Driscoll. (2016) The c ‐Chart with Bootstrap Adjusted Control Limits to Improve Conditional Performance . Quality and Reliability Engineering International 32:8, pages 2871-2881.
Crossref
Michele Maria da Silva, Eugenio Kahn Epprecht & Álvaro de Lima Veiga Filho. (2016) LIMITES DE CONTROLE AJUSTADOS PARA O GRÁFICO DE S COM PARÂMETRO ESTIMADO. LIMITES DE CONTROLE AJUSTADOS PARA O GRÁFICO DE S COM PARÂMETRO ESTIMADO.
Nirpeksh Kumar & Subhabrata Chakraborti. (2016) Phase II Shewhart-type Control Charts for Monitoring Times Between Events and Effects of Parameter Estimation. Quality and Reliability Engineering International 32:1, pages 315-328.
Crossref
Aya A. Aly, Nesma A. Saleh, Mahmoud A. Mahmoud & William H. Woodall. (2014) A Reevaluation of the Adaptive Exponentially Weighted Moving Average Control Chart When Parameters are Estimated. Quality and Reliability Engineering International 31:8, pages 1611-1622.
Crossref
Taras Lazariv, Yarema Okhrin & Wolfgang Schmid. (2015) Behavior of EWMA type control charts for small smoothing parameters. Computational Statistics & Data Analysis 89, pages 115-125.
Crossref
Olha Bodnar, Taras Bodnar & Yarema Okhrin. (2013) Robust Surveillance of Covariance Matrices Using a Single Observation. Sankhya A 76:2, pages 219-256.
Crossref
Axel Gandy & Jan Terje Kvaløy. (2013) Guaranteed Conditional Performance of Control Charts via Bootstrap Methods. Scandinavian Journal of Statistics 40:4, pages 647-668.
Crossref
Willem Albers. (2011) Empirical nonparametric control charts for high-quality processes. Journal of Statistical Planning and Inference 141:9, pages 3151-3159.
Crossref
Olha Bodnar & Wolfgang Schmid. (2011) CUSUM charts for monitoring the mean of a multivariate Gaussian process. Journal of Statistical Planning and Inference 141:6, pages 2055-2070.
Crossref
Willem Albers. (2011) Risk-Adjusted Control Charts for Health Care Monitoring. International Journal of Mathematics and Mathematical Sciences 2011, pages 1-16.
Crossref
Willem Albers. (2010) The optimal choice of negative binomial charts for monitoring high-quality processes. Journal of Statistical Planning and Inference 140:1, pages 214-225.
Crossref
Olha Bodnar, Taras Bodnar & Yarema Okhrin. (2009) Surveillance of the covariance matrix based on the properties of the singular Wishart distribution. Computational Statistics & Data Analysis 53:9, pages 3372-3385.
Crossref
Willem Albers & Wilbert C. M. Kallenberg. (2009) Normal control charts with nonparametric safeguard. Statistica Neerlandica 63:1, pages 63-81.
Crossref
Willem Albers & Wilbert C.M. Kallenberg. (2008) Minimum control charts. Journal of Statistical Planning and Inference 138:3, pages 539-551.
Crossref
Olha Bodnar & Wolfgang Schmid. (2007) Surveillance of the mean behavior of multivariate time series. Statistica Neerlandica 61:4, pages 383-406.
Crossref
Willem Albers & Wilbert C. M. Kallenberg. (2006) Self‐adapting control charts. Statistica Neerlandica 60:3, pages 292-308.
Crossref
Willem Albers, W.C.M. Kallenberg & Sri Nurdiati. (2006) Data driven choice of control charts. Journal of Statistical Planning and Inference 136:3, pages 909-941.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.