Mingze Yuan, Ting Qu, Matthias Thürer, Lin Ma & Lei Liu. (2023) Rule based vs Optimization based Workload Control with and without Exogenous Lead Times: An Assessment by Simulation. Journal of Systems Science and Systems Engineering.
Crossref
Kaustav Kundu, Martin J. Land, Alberto Portioli-Staudacher & Jos A. C. Bokhorst. (2020) Order review and release in make-to-order flow shops: analysis and design of new methods. Flexible Services and Manufacturing Journal 33:3, pages 750-782.
Crossref
S. Haeussler, C. Stampfer & H. Missbauer. (2020) Comparison of two optimization based order release models with fixed and variable lead times.. International Journal of Production Economics 227, pages 107682.
Crossref
Sarah Vanheusden, Teun van Gils, An Caris, Katrien Ramaekers & Kris Braekers. (2020) Operational workload balancing in manual order picking. Computers & Industrial Engineering 141, pages 106269.
Crossref
Hubert Missbauer & Reha UzsoyHubert Missbauer & Reha Uzsoy. 2020. Production Planning with Capacitated Resources and Congestion. Production Planning with Capacitated Resources and Congestion
47
75
.
Nuno O. Fernandes, Mohammad Dehghanimohammadabadi & S. Carmo Silva. 2018. Trends and Advances in Information Systems and Technologies. Trends and Advances in Information Systems and Technologies
706
713
.
Sebastian Grundstein, Michael Freitag & Bernd Scholz-Reiter. (2017) A new method for autonomous control of complex job shops – Integrating order release, sequencing and capacity control to meet due dates. Journal of Manufacturing Systems 42, pages 11-28.
Crossref
M. Niehues, P. Sellmaier, T. Steinhaeusser & G. Reinhart. (2016) Adaptive Job-Shop Control Using Resource Accounts. Procedia CIRP 57, pages 351-356.
Crossref
Hermann LöddingHermann Lödding. 2016. Verfahren der Fertigungssteuerung. Verfahren der Fertigungssteuerung
449
466
.
Hermann LöddingHermann Lödding. 2013. Handbook of Manufacturing Control. Handbook of Manufacturing Control
403
418
.
Peter Pürgstaller & Hubert Missbauer. (2012) Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer. International Journal of Production Economics 140:2, pages 670-680.
Crossref
Hubert Missbauer & Reha Uzsoy. 2011. Planning Production and Inventories in the Extended Enterprise. Planning Production and Inventories in the Extended Enterprise
437
507
.
Hubert Missbauer. (2009) Models of the transient behaviour of production units to optimize the aggregate material flow. International Journal of Production Economics 118:2, pages 387-397.
Crossref
M. Ebadian, M. Rabbani, F. Jolai, S.A. Torabi & R. Tavakkoli-Moghaddam. (2008) A new decision-making structure for the order entry stage in make-to-order environments. International Journal of Production Economics 111:2, pages 351-367.
Crossref
I. P. Tatsiopoulos, A. Batsis & A. G. Papadopoulos. 2008. Lean Business Systems and Beyond. Lean Business Systems and Beyond
75
92
.
A. Haskose, B.G. Kingsman & D Worthington. (2004) Performance analysis of make-to-order manufacturing systems under different workload control regimes. International Journal of Production Economics 90:2, pages 169-186.
Crossref
Amitava Nandi & P. Rogers. (2003) Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance. Behavior of an order release mechanism in a make-to-order manufacturing system with selected order acceptance.
I. P. Tatsiopoulos. 2003. Collaborative Systems for Production Management. Collaborative Systems for Production Management
47
58
.
Brian G. Kingsman. (2000) Modelling input–output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics 68:1, pages 73-93.
Crossref
I. Sabuncuoglu & H. Y. Karapinar. (2007) A Load‐based and Due‐date‐oriented Approach to Order Review/Release in Job Shops*. Decision Sciences 31:2, pages 413-447.
Crossref
Sukran N. Kadipasaoglu & V. Sridharan. 2000. Wiley Encyclopedia of Electrical and Electronics Engineering. Wiley Encyclopedia of Electrical and Electronics Engineering.
I. Sabuncuoglu & H.Y. Karapınar. (1999) Analysis of order review/release problems in production systems. International Journal of Production Economics 62:3, pages 259-279.
Crossref
Patrick R Philipoom & Timothy D Fry. (1999) Order review/release in the absence of adherence to formal scheduling policies. Journal of Operations Management 17:3, pages 327-342.
Crossref
Martin J. Land & Gerard J.C. Gaalman. (1998) The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics 56-57, pages 347-364.
Crossref
I. P. Tatsiopoulos, I. A. Pappás & S. Ponis. 1998. Organizing the Extended Enterprise. Organizing the Extended Enterprise
119
134
.
K. Choi, S. Kim, H. Lee & I. Kwon. (1997) An operation scheme for make-to-order job-shop production systems. Computers & Industrial Engineering 33:3-4, pages 765-768.
Crossref
I.P. Tatsiopoulos. (1997) An Orders Release reference model as a link between production management and shop floor control software. Computers in Industry 33:2-3, pages 335-344.
Crossref
Martin Land & Gerard Gaalman. (1996) Workload control concepts in job shops A critical assessment. International Journal of Production Economics 46-47, pages 535-548.
Crossref
Gary J. Salegna & Paul S. Park. (1996) Workload smoothing in a bottleneck job shop. International Journal of Operations & Production Management 16:1, pages 91-110.
Crossref
SEUNG‐CHUL KIM & PAUL M. BOBROWSKI. (2009) EVALUATING ORDER RELEASE MECHANISMS IN A JOB SHOP WITH SEQUENCE‐DEPENDENT SETUP TIMES. Production and Operations Management 4:2, pages 163-180.
Crossref
Joel D. Wisner. (1995) A review of the order release policy research. International Journal of Operations & Production Management 15:6, pages 25-40.
Crossref
Sunil Lingayat, John Mittenthal & Robert M. O'Keefe. (2007) Order Release in Automated Manufacturing Systems. Decision Sciences 26:2, pages 175-208.
Crossref
Manoj K. Malhotra, John B. Jensen & Patrick R. Philipoom. (2007) Management of Vital Customer Priorities in Job Shop Manufacturing Environments. Decision Sciences 25:5-6, pages 711-736.
Crossref
Manoj K. Malhotra, John B. Jensen & Patrick R. Philipoom. (1994) Management of Vital Customer Priorities in Job Shop Manufacturing Environments. Decision Sciences 25:5-6, pages 711-736.
Crossref
Patrick R. Philipoom, Manoj K. Malhotra & John B. Jensen. (2007) An Evaluation of Capacity Sensitive Order Review and Release Procedures in Job Shops. Decision Sciences 24:6, pages 1109-1134.
Crossref
Richard H. Deane & Seok Hwan Moon. (1992) Work flow control in the flexible flow line. International Journal of Flexible Manufacturing Systems 4:3-4, pages 217-235.
Crossref
Imtiaz Ahmed & Warren W. Fisher. (2007) Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling*. Decision Sciences 23:3, pages 633-647.
Crossref
Dietrich AdamGünther Zäpfel & Hubert Missbauer. 1992. Fertigungssteuerung. Fertigungssteuerung
27
52
.
Steven A. Melnyk, Gary L. Ragatz & Lawrence Fredendall. (1991) Load smoothing by the planning and order review/release systems: A simulation experiment. Journal of Operations Management 10:4, pages 512-523.
Crossref
Miles A. Townsend & Thomas W. Lamb. (2016) Detailed simulation of a real world job shop with subassembly requirements. SIMULATION 57:2, pages 114-128.
Crossref
Linda Hendry & Brian Kingsman. (1991) A Decision Support System for Job Release in Make‐to‐order
Companies. International Journal of Operations & Production Management 11:6, pages 6-16.
Crossref
Gerhard Knolmayer. 1991. Modern Production Concepts. Modern Production Concepts
219
236
.
M.A. Azoza & M.C. Bonney. (1990) Disaggregating aggregate production plans to smooth workload variation. Engineering Costs and Production Economics 19:1-3, pages 125-131.
Crossref
R. Meenakshi Sundaram & Wen-shiom Lian. (1990) A computerized algorithm for scheduling dependent jobs with weights in a single machine. Computers & Industrial Engineering 19:1-4, pages 11-16.
Crossref
R Ramasesh. (1990) Dynamic job shop scheduling: A survey of simulation research. Omega 18:1, pages 43-57.
Crossref
Gary M. Kern & Hector H. Guerrero. (1990) A conceptual model for demand management in the assemble-to-order environment. Journal of Operations Management 9:1, pages 65-84.
Crossref
Paul Sungchil Park & Paul M. Bobrowski. (1989) Job release and labor flexibility in a dual resource constrained job shop. Journal of Operations Management 8:3, pages 230-249.
Crossref
L.C. Hendry & B.G. Kingsman. (1989) Production planning systems and their applicability to make-to-order companies. European Journal of Operational Research 40:1, pages 1-15.
Crossref
PM Bobrowski & PS PARK. (1989) Work release strategies in a dual resource constrained job shop. Omega 17:2, pages 177-188.
Crossref
Terence M. Hancock. (1988) Effects of Adaptive Process Planning on Job Cost and Lateness Measures. International Journal of Operations & Production Management 8:4, pages 34-49.
Crossref
Gary L. Ragatz & Vincent A. Mabert. (2007) AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB‐SHOP ENVIRONMENT. Decision Sciences 19:1, pages 167-189.
Crossref
P.J. O'Grady & M.A. Azoza. (1987) An adaptive approach to shop loading. Omega 15:2, pages 121-128.
Crossref
Timothy J. Greene & Randall P. Sadowski. (1986) A mixed integer program for loading and scheduling multiple flexible manufacturing cells. European Journal of Operational Research 24:3, pages 379-386.
Crossref
Gregory W. Saul & Randall P. Sadowski. (1986) An intermediate resource planning methodology. Journal of Manufacturing Systems 5:2, pages 113-121.
Crossref
Ali S. Kiran & Milton L. Smith. (1984) Simulation studies in job shop scheduling—II. Computers & Industrial Engineering 8:2, pages 95-105.
Crossref
Ali S. Kiran & Milton L. Smith. (1984) Simulation studies in job shop sheduling—I a survey. Computers & Industrial Engineering 8:2, pages 87-93.
Crossref
Arvind Ballakur & Harold J. Steudel. (1984) Integration of job shop control systems: A state-of-the-art review. Journal of Manufacturing Systems 3:1, pages 71-79.
Crossref
Steven L. Hankins, Richard A. Wysk & Kenneth R. Fox. (1984) Using a CATS database for alternative machine loading. Journal of Manufacturing Systems 3:2, pages 115-120.
Crossref
I.P. Tatsiopoulos & B.G. Kingsman. (1983) Lead time management. European Journal of Operational Research 14:4, pages 351-358.
Crossref
I. P. Tatsiopoulos. 1983. Efficiency of Manufacturing Systems. Efficiency of Manufacturing Systems
271
280
.