28
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

Simultaneous Lot Sizing and Sequencing for Multistage Production Systems

Pages 327-331 | Received 01 Jun 1984, Published online: 09 Jul 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

M. Karimi-Nasab, S.M. Seyedhoseini, M. Modarres & M. Heidari. (2013) Multi-period lot sizing and job shop scheduling with compressible process times for multilevel product structures. International Journal of Production Research 51:20, pages 6229-6246.
Read now
AVRAHAM SHTUB & ODED MAIMON1. (1992) Role of similarity measures in PCB grouping procedures. International Journal of Production Research 30:5, pages 973-983.
Read now
ODED MAIMON & AVRAHAM SHTUB. (1991) Grouping methods for printed circuit board assembly. International Journal of Production Research 29:7, pages 1379-1390.
Read now

Articles from other publishers (12)

M. Karimi-Nasab & M. Modarres. (2015) Lot sizing and job shop scheduling with compressible process times: A cut and branch approach. Computers & Industrial Engineering 85, pages 196-205.
Crossref
M. Karimi-Nasab, M. Modarres & S.M. Seyedhoseini. (2015) A self-adaptive PSO for joint lot sizing and job shop scheduling with compressible process times. Applied Soft Computing 27, pages 137-147.
Crossref
M. Karimi-Nasab & S.M. Seyedhoseini. (2013) Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach. European Journal of Operational Research 231:3, pages 598-616.
Crossref
A Kimms. (1998) Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing. Omega 26:3, pages 355-366.
Crossref
Alf Kimms & Andreas Drexl. 1998. Beyond Manufacturing Resource Planning (MRP II). Beyond Manufacturing Resource Planning (MRP II) 184 216 .
Roelof Kuik, Marc Salomon & Luk N. van Wassenhove. (1994) Batching decisions: structure and models. European Journal of Operational Research 75:2, pages 243-263.
Crossref
Chee‐Chuong Sum & Arthur V. Hill. (2007) A New Framework for Manufacturing Planning and Control Systems*. Decision Sciences 24:4, pages 739-760.
Crossref
Hossein Jamshidi & Robert A. Brown. (1993) Development of production cycles for group technology environment with the wagner-whitin algorithm. Computers & Industrial Engineering 24:2, pages 199-207.
Crossref
A. K. AGGARWAL, R. R. VEMUGANTI & W. FETNER. (2009) A MODEL‐BASED DECISION SUPPORT SYSTEM FOR SCHEDULING LUMBER DRYING OPERATIONS. Production and Operations Management 1:3, pages 320-328.
Crossref
Hitoshi Tsubone, Masao Anzai, Mitsumasa Sugawara & Haruki Matsuura. (1991) An interactive production planning and scheduling system for a flow-type manufacturing process. International Journal of Production Economics 22:1, pages 43-51.
Crossref
K. PRESTON WHITEJR.JR.. 1990. Advances in Industrial Systems. Advances in Industrial Systems 115 157 .
F.A. Rodammer & K.P. White. (1988) A recent survey of production scheduling. IEEE Transactions on Systems, Man, and Cybernetics 18:6, pages 841-851.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.