55
Views
15
CrossRef citations to date
0
Altmetric
Original Articles

BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST

&
Pages 90-97 | Received 01 Jan 1989, Published online: 31 May 2007

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (4)

M. Cheng, N.J. Mukherjee & S.C. Sarin. (2013) A review of lot streaming. International Journal of Production Research 51:23-24, pages 7023-7046.
Read now
Jen Huei Chang & Huan Neng Chiu. (2005) A comprehensive review of lot streaming. International Journal of Production Research 43:8, pages 1515-1536.
Read now
C. SRISKANDARAJAH & E. WAGNEUR. (1999) Lot streaming and scheduling multiple products in two-machine no-wait flowshops. IIE Transactions 31:8, pages 695-707.
Read now
Jian Dong, H. R. Parsaei & Herman R. Leep. (1997) Integrated Feature-Based Process Planning and Scheduling with an Object-Oriented Knowledge-Based Approach. Intelligent Automation & Soft Computing 3:3, pages 249-260.
Read now

Articles from other publishers (11)

Mohsen Nejati, Iraj Mahdavi, Reza Hassanzadeh, Nezam Mahdavi-Amiri & MohamadSailm Mojarad. (2013) Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint. The International Journal of Advanced Manufacturing Technology 70:1-4, pages 501-514.
Crossref
G. Vijay chakaravarthy, S. Marimuthu & A. Naveen Sait. (2011) Performance evaluation of proposed Differential Evolution and Particle Swarm Optimization algorithms for scheduling m-machine flow shops with lot streaming. Journal of Intelligent Manufacturing 24:1, pages 175-191.
Crossref
Taofeng Ye. (2012) Analysis on multi-stage lot streaming: The effect of transfer. Computers & Industrial Engineering 62:4, pages 1046-1054.
Crossref
Subhash C. Sarin, Adar A. Kalir & Ming Chen. (2008) A single-lot, unified cost-based flow shop lot-streaming problem. International Journal of Production Economics 113:1, pages 413-424.
Crossref
Wei Zhang, Changyu Yin, Jiyin Liu & Richard J. Linn. (2005) Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops. International Journal of Production Economics 96:2, pages 189-200.
Crossref
Subodha Kumar, Tapan P Bagchi & C Sriskandarajah. (2000) Lot streaming and scheduling heuristics for m-machine no-wait flowshops. Computers & Industrial Engineering 38:1, pages 149-172.
Crossref
Sukran N. Kadipasaoglu, Wenguang Xiang & Basheer M. Khumawala. (1999) Batch scheduling in a multistage, multiproduct manufacturing system – an application. International Journal of Operations & Production Management 19:4, pages 421-437.
Crossref
Alper Şen & Ömer S. Benli. (1998) Lot streaming in open shops. Operations Research Letters 23:3-5, pages 135-142.
Crossref
Jiang Chen & George Steiner. (1997) Approximation methods for discrete lot streaming in flow shops. Operations Research Letters 21:3, pages 139-145.
Crossref
Jiang Chen & George Steiner. (1997) Lot streaming with detached setups in three-machine flow shops. European Journal of Operational Research 96:3, pages 591-611.
Crossref
C. Sriskandarajah & E. Wagneur. (1995) Lot streaming of a single product in two-machine no-wait flowshops. Lot streaming of a single product in two-machine no-wait flowshops.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.