201
Views
17
CrossRef citations to date
0
Altmetric
Articles

Minimising the weighted number of tardy jobs in a hybrid flow shop with genetic algorithm

, &
Pages 745-757 | Received 07 Dec 2007, Accepted 06 Oct 2008, Published online: 22 Jul 2009

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (14)

Ghorbanali Mohammadi. (2018) Scheduling parallel machines with sequence dependent set-up times in job shop industries using GA and SA. International Journal of Systems Science: Operations & Logistics 5:3, pages 282-294.
Read now
Eliana M. González-Neira & Jairo R. Montoya-Torres. (2017) A GRASP meta-heuristic for the hybrid flowshop scheduling problem. Journal of Decision Systems 26:3, pages 294-306.
Read now
Guodong Huang, Jie Chen, Xiuli Wang, Yiqun Shi & Houping Tian. (2017) From loop structure to policy-making: a CONWIP design framework for hybrid flow shop control in one-of-a-kind production environment. International Journal of Production Research 55:12, pages 3374-3391.
Read now
O. Kheirandish, R. Tavakkoli-Moghaddam & M. Karimi-Nasab. (2015) An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations. International Journal of Computer Integrated Manufacturing 28:5, pages 437-450.
Read now
Sheng-yao Wang, Ling Wang, Min Liu & Ye Xu. (2015) An order-based estimation of distribution algorithm for stochastic hybrid flow-shop scheduling problem. International Journal of Computer Integrated Manufacturing 28:3, pages 307-320.
Read now
M.E. Tayebi Araghi, F. Jolai & M. Rabiee. (2014) Incorporating learning effect and deterioration for solving a SDST flexible job-shop scheduling problem with a hybrid meta-heuristic approach. International Journal of Computer Integrated Manufacturing 27:8, pages 733-746.
Read now
Mostafa Abouei Ardakan, Ali Hakimian & Mohammad Taghi Rezvan. (2014) A branch-and-bound algorithm for minimising the number of tardy jobs in a two-machine flow-shop problem with release dates. International Journal of Computer Integrated Manufacturing 27:6, pages 519-528.
Read now
Fuqing Zhao, Jianxin Tang, Junbiao Wang & Jonrinaldi Jonrinaldi. (2014) An improved particle swarm optimisation with a linearly decreasing disturbance term for flow shop scheduling with limited buffers. International Journal of Computer Integrated Manufacturing 27:5, pages 488-499.
Read now
Mehdi Foumani & Kouroush Jenab. (2013) Analysis of flexible robotic cells with improved pure cycle. International Journal of Computer Integrated Manufacturing 26:3, pages 201-215.
Read now
J. Behnamian & S.M.T. Fatemi Ghomi. (2012) Incorporating transportation time in multi-agent production network scheduling. International Journal of Computer Integrated Manufacturing 25:12, pages 1111-1128.
Read now
Dayong Hu & Zhenqiang Yao. (2012) Stacker-reclaimer scheduling in a dry bulk terminal. International Journal of Computer Integrated Manufacturing 25:11, pages 1047-1058.
Read now
R. Shafaei, M. Rabiee & M. Mirzaeyan. (2011) An adaptive neuro fuzzy inference system for makespan estimation in multiprocessor no-wait two stage flow shop. International Journal of Computer Integrated Manufacturing 24:10, pages 888-899.
Read now
Tarek Chaari, Sondes Chaabane, Taicir Loukil & Damien Trentesaux. (2011) A genetic algorithm for robust hybrid flow shop scheduling. International Journal of Computer Integrated Manufacturing 24:9, pages 821-833.
Read now
Xinggang Luo, Wei Li, Yiliu Tu, Deyi Xue & Jiafu Tang. (2010) Optimal resource allocation for hybrid flow shop in one-of-a-kind production. International Journal of Computer Integrated Manufacturing 23:2, pages 146-154.
Read now

Articles from other publishers (3)

Feng Chu, Ming Liu, Xin Liu, Chengbin Chu & Juan Jiang. (2018) Reentrant Flow Shop Scheduling considering Multiresource Qualification Matching. Scientific Programming 2018, pages 1-8.
Crossref
Mostafa Abouei Ardakan, A. Kourank Beheshti, S. Hamid Mirmohammadi & Hamed Davari Ardakani. (2017) A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem. Numerical Algebra, Control & Optimization 7:4, pages 465-480.
Crossref
Muminu O. Adamu & Aderemi O. Adewumi. (2016) Minimizing the weighted number of tardy jobs on multiple machines: A review. Journal of Industrial and Management Optimization 12:4, pages 1465-1493.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.