Publication Cover
Production Planning & Control
The Management of Operations
Volume 29, 2018 - Issue 9
491
Views
14
CrossRef citations to date
0
Altmetric
Articles

Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach

&
Pages 743-760 | Received 18 Oct 2017, Accepted 17 Apr 2018, Published online: 04 May 2018

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (3)

Alberto De Marco, Timur Narbaev, Filippo Maria Ottaviani & Mario Vanhoucke. (2023) Influence of cost contingency management on project estimates at completion. International Journal of Construction Management 0:0, pages 1-11.
Read now
Haavard Haaskjold, Bjørn Andersen & Jan Alexander Langlo. (2023) Dissecting the project anatomy: Understanding the cost of managing construction projects. Production Planning & Control 34:2, pages 117-138.
Read now

Articles from other publishers (11)

Farshad Peiman, Mohammad Khalilzadeh, Nasser Shahsavari-Pour & Mehdi Ravanshadnia. (2023) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management.
Crossref
Ofer Zwikael, Michelle Salmona, Jack Meredith & Seyed Ashkan Zarghami. (2022) Enhancing project stakeholder communication under insufficient knowledge of project management concepts. Engineering, Construction and Architectural Management 30:10, pages 5007-5029.
Crossref
Bilal Aslam, Ahsen Maqsoom, Hina Inam, Mubeen ul Basharat & Fahim Ullah. (2023) Forecasting Construction Cost Index through Artificial Intelligence. Societies 13:10, pages 219.
Crossref
Fei Han, Susan M. Bogus, Heather Moore & Su Zhang. 2023. Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021. Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021 211 223 .
Byung-Cheol Kim. (2022) Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment. European Journal of Operational Research 296:2, pages 679-695.
Crossref
Fulei Chen, Huicong Xia, Jianqing Li, Yingying Zhao & Bilal Ahmad. 2022. Application of Intelligent Systems in Multi-modal Information Analytics. Application of Intelligent Systems in Multi-modal Information Analytics 158 166 .
J. Isac, R. Pellerin & P.-M. Léger. (2020) Impact of a visual decision support tool in project control: A comparative study using eye tracking. Automation in Construction 110, pages 102976.
Crossref
Linlin Zhao, Jasper Mbachu & Zhansheng Liu. (2020) Modelling Residential Building Costs in New Zealand: A Time-Series Transfer Function Approach. Mathematical Problems in Engineering 2020, pages 1-18.
Crossref
Xiaojuan Xue, Yuanhua Jia & Yuanjie Tang. (2020) Expressway Project Cost Estimation With a Convolutional Neural Network Model. IEEE Access 8, pages 217848-217866.
Crossref
Yasser Elfahham. (2019) Estimation and prediction of construction cost index using neural networks, time series, and regression. Alexandria Engineering Journal 58:2, pages 499-506.
Crossref
Byung-Cheol KimJeffrey K. Pinto. (2019) What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion. Journal of Management in Engineering 35:2.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.