1,667
Views
30
CrossRef citations to date
0
Altmetric
research

Design coordination strategies in a 2D and BIM mixed-project environment: social dynamics and productivity

ORCID Icon & ORCID Icon

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (5)

Réka Andersson & Maria Eidenskog. (2023) Beyond barriers – exploring resistance towards BIM through a knowledge infrastructure framework. Construction Management and Economics 41:11-12, pages 926-941.
Read now
Izabela Skrzypczak, Grzegorz Oleniacz, Agnieszka Leśniak, Krzysztof Zima, Maria Mrówczyńska & Jan K. Kazak. (2022) Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements. Building Research & Information 50:8, pages 859-880.
Read now
Ying Gao, Xiaoyu Liu, Shuibo Zhang, Jinyue Zhang & Qing Guo. (2022) BIM application and collaboration in construction projects: a perspective of the Chinese construction market. Construction Management and Economics 40:6, pages 429-441.
Read now
Husam Sameer & Stefan Bringezu. (2021) Building information modelling application of material, water, and climate footprint analysis. Building Research & Information 49:6, pages 593-612.
Read now
Ghang Lee & André Borrmann. (2020) BIM policy and management. Construction Management and Economics 38:5, pages 413-419.
Read now

Articles from other publishers (25)

Ming Jin & Baizhan Li. (2023) Dual-Level Framework for OpenBIM-Enabled Design Collaboration. Buildings 13:12, pages 3031.
Crossref
Dongping Cao & Shiting Shao. (2023) Colleagues or Friends? Comparing Communication and Advice Networks for Building Information Modeling (BIM) Implementation in Construction Projects. Project Management Journal.
Crossref
Amelia Celoza, Daniel P. de Oliveira & Fernanda Leite. (2023) Role of BIM Contract Practices in Stakeholder BIM Implementation on AEC Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 15:2.
Crossref
Clemens Mostert, Husam Sameer & Stefan Bringezu. 2023. 2023 Bauphysik Kalender. 2023 Bauphysik Kalender 83 118 .
Christian Nnaemeka Egwim, Hafiz Alaka, Eren Demir, Habeeb Balogun & Saheed Ajayi. (2022) Systematic review of critical drivers for delay risk prediction: towards a conceptual framework for BIM-based construction projects. Frontiers in Engineering and Built Environment 3:1, pages 16-31.
Crossref
Jinpeng Wang, Shang ZhangPeter FennXiaowei LuoYan Liu & Lilin Zhao. (2023) Adopting BIM to Facilitate Dispute Management in the Construction Industry: A Conceptual Framework Development. Journal of Construction Engineering and Management 149:1.
Crossref
M. J. García-Granja, E. B. Blázquez-Parra, Guido Cimadomo & F. Guzmán-Navarro. (2022) Development of an Innovative Seat Reservation System for University Buildings Based on BIM Technology. Buildings 12:11, pages 1786.
Crossref
Ya Hui Teo, Jun Hong Yap, Hui An, Simon Ching Man Yu, Limao Zhang, Jie Chang & Kang Hao Cheong. (2022) Enhancing the MEP Coordination Process with BIM Technology and Management Strategies. Sensors 22:13, pages 4936.
Crossref
Eliav TuvalShabtai Isaac. (2022) Online Planning and Management of Design Coordination Tasks with BIM: Challenges and Opportunities. Journal of Management in Engineering 38:3.
Crossref
Qinglin Wu, Lijuan Chen, Peixin Shi, Weijun Wang & Sheng Xu. (2022) Identifying Impact Factors of MEP Installation Productivity: An Empirical Study. Buildings 12:5, pages 565.
Crossref
Jing Wang & Weisheng Lu. (2021) A deployment framework for BIM localization. Engineering, Construction and Architectural Management 29:1, pages 407-430.
Crossref
Gintarė Piaseckienė. (2022) DIMENSIONS OF BIM IN LITERATURE: REVIEW AND ANALYSIS. Mokslas - Lietuvos ateitis 14:0, pages 1-11.
Crossref
Qian LiHeap-Yih Chong, Cen-Ying LeeYubin Zhang. (2021) BIM’s Formal and Informal Collaborative Networks in Traditional Procurement: Insights from the Construction Phase of a Hospital Case Study. Journal of Management in Engineering 37:6.
Crossref
Zezhou Wu, Mingyang Jiang, Heng Li, Xiaochun Luo & Xiaoying Li. (2021) Investigating the Critical Factors of Professionals’ BIM Adoption Behavior Based on the Theory of Planned Behavior. International Journal of Environmental Research and Public Health 18:6, pages 3022.
Crossref
Dongping Cao & Shiting Shao. (2020) Towards Complexity and Dynamics: A Bibliometric-Qualitative Review of Network Research in Construction. Complexity 2020, pages 1-19.
Crossref
Hanbin Luo, Jiajing Liu, Chengqian Li, Ke Chen & Ming Zhang. (2020) Ultra-rapid delivery of specialty field hospitals to combat COVID-19: Lessons learned from the Leishenshan Hospital project in Wuhan. Automation in Construction 119, pages 103345.
Crossref
Ali Mahmood & Sepehr Abrishami. (2020) BIM for lean building surveying services. Construction Innovation 20:3, pages 447-470.
Crossref
Weisheng LuJinying Xu & Jonas Söderlund. (2020) Exploring the Effects of Building Information Modeling on Projects: Longitudinal Social Network Analysis. Journal of Construction Engineering and Management 146:5.
Crossref
Patricia Andre Tillmann. (2020) Using the Last Planner System to tackle the social aspects of BIM-enabled MEP coordination. Canadian Journal of Civil Engineering 47:2, pages 140-152.
Crossref
Yayha Al-Saeed, Erika Parn, David John Edwards & Stephen Scaysbrook. (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production. Journal of Engineering, Design and Technology 17:5, pages 960-984.
Crossref
Suleiman Alsafouri & Steven K. Ayer. (2019) Leveraging Mobile Augmented Reality Devices for Enabling Specific Human Behaviors in Design and Constructability Review. Advances in Civil Engineering 2019, pages 1-11.
Crossref
A.S. Erri Pradeep, T.W. Yiu & R. Amor. (2019) Leveraging Blockchain Technology in a BIM Workflow: A Literature Review. Leveraging Blockchain Technology in a BIM Workflow: A Literature Review.
Xiaozhi MaFeng XiongTimothy O. OlawumiNa DongAlbert P. C. Chan. (2018) Conceptual Framework and Roadmap Approach for Integrating BIM into Lifecycle Project Management. Journal of Management in Engineering 34:6.
Crossref
Rafael Sacks, Charles Eastman, Ghang Lee & Paul Teicholz. 2018. BIM Handbook. BIM Handbook 623 637 .
Sejun JANG & Ghang LEE. (2018) Impact of organizational factors on delays in BIM-based coordination from a decision-making view: a case study. Journal of Civil Engineering and Management 24:1, pages 19-30.
Crossref

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.