Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects

Keep up to date with the latest research on this topic with citation updates for this article.

Read on this site (9)

Kyung-Tae Lee, Sang-Jun Park & Ju-Hyung Kim. (2023) Comparative analysis of managers’ perception in overseas construction project risks and cost overrun in actual cases: a perspective of the Republic of Korea. Journal of Asian Architecture and Building Engineering 22:4, pages 2291-2308.
Read now
Lingyi Tang, Xiaer Xiahou, Kang Li, Qiming Li & Xiaoyang Hu. (2023) Research on the Relationship Between Flexible Contract Term Setting Method and Setting Effect of Environmental Protection PPP Project. Engineering Management Journal 35:3, pages 272-284.
Read now
Natalie M. Scala, Vincent Schiavone, Hylton Olivieri, Olli Seppänen, Thais da C. L. Alves, Min Liu & Ariovaldo Denis Granja. (2023) Comparative Analysis of Planning with the Critical Path Method, Last Planner System, and Location-Based Techniques in Brazil, Finland, and the United States. Engineering Management Journal 35:3, pages 237-256.
Read now
Abdorreza Rezaee Arjroody, Seyed azim Hosseini, Mahdieh Akhbari, Ebrahim Safa & Jafar Asadpour. (2023) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: road construction projects in Iran). International Journal of Construction Management 0:0, pages 1-12.
Read now
Hamdi Bashir, Sadeque Hamdan, Udechukwu Ojiako, Salah Haridy, Mohammad Shamsuzzaman & Hassan Ahmed Al Zarooni. (2023) A Weighted Fuzzy Social Network Analysis-Based Approach for Modeling and Analyzing Relationships Among Risk Factors Affecting Project Delays. Engineering Management Journal 0:0, pages 1-11.
Read now
Riaz Ahmed, Abrar Hussain & Simon P. Philbin. (2022) Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance. Engineering Management Journal 34:3, pages 374-393.
Read now
Irem Dikmen, Abroon Qazi, Huseyin Erol & M. Talat Birgonul. (2021) Meta-Modeling of Complexity-Uncertainty-Performance Triad in Construction Projects. Engineering Management Journal 33:1, pages 30-44.
Read now
Matt Renaud & Mustafa Kumral. (2020) Planning a Complex Mine Construction Project under Price Cyclicality. Engineering Management Journal 32:2, pages 120-129.
Read now
Hamdi Bashir, Udechukwu Ojiako & Caroline Mota. (2020) Modeling and Analyzing Factors Affecting Project Delays Using an Integrated Social Network-Fuzzy MICMAC Approach. Engineering Management Journal 32:1, pages 26-36.
Read now

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.