References
- Adeli, H., & Karim, A. (1997). Scheduling/Cost optimization and neural dynamics models for construction. Journal of Construction Engineering, 123(4), 450–458. doi:10.1061/(ASCE)0733-9364(1997)123:4(450)
- Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. doi:10.1016/j.ijproman.2005.11.010
- Chang, Andrew Shing-Tao. (2002). Reasons for cost and schedule increase for engineering design projects. Journal Of Management In Engineering, 18(1), 29–36. doi: 10.1061/(ASCE)0742-597X(2002)18:1(29)
- Cho, K., Hong, T., & Hyun, C. (2010). Integrated schedule and cost model for repetitive construction process. Journal of Management in Engineering, 26(2), 78–88. doi:10.1061/(ASCE)ME.1943-5479.0000009
- Cohen, M. W., & Palmer, G. R. (2004). ’Project risk identification and management’, AACE International Transaction, (pp. 1013-1015). Retrieved September, 10, 2006.
- Hulett, D. (2012). Integrated cost-schedule risk analysis. Surrey, UK: Gower.
- Hulett, D., & Nosbisch, M. R. (2012). Integrated cost and schedule using Monte Carlo simulation of a CPM model. Waste Management (WM 2012) Conference, Phoenix, Arizona, USA.
- Lim, C., & Mohamed., M. Z. (2000). An exploratory study into recurring construction problems. International Journal of Project Management, 18(3), 267–273. doi:10.1016/S0263-7863(99)00016-2
- Ökmen, Ö. (2008). Activity network scheduling and early cost estimation of construction projects under uncertainty: A risk analysis based modeling approach. Gaziantep, Turkey: Gaziantep University.
- Ökmen, Ö., & Öztaş, A. (2008). Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), 49–63. doi:10.1061/(ASCE)0733-9364(2008)134:1(49)
- Omar, A. (2009). Uncertainty in project scheduling–its use in PERT/CPM conventional techniques. Cost Engineering, 51(7), 30–34.
- Pehlivan, S., & Öztemir, A. E. (2015). Cost overrun estimation of construction project with significant risk factors. The International Journal of Engineering and Science, 4(7), 1–6.
- Project Management Institute. (2013). A guide to the project management of knowledge (PMBOK guide). Newtown Square, PA: Author.
- Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 517–526. doi:10.1016/j.ijproman.2006.11.007
- Schatteman, D., Herroelen, W., Vonder, S. V., & Boone, A. (2008). Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), 885–893. doi:10.1061/(ASCE)0733-9364(2008)134:11(885)
- Sweis, G., Sweis, R., Hammad, A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26, 665–674. doi:10.1016/j.ijproman.2007.09.009