614
Views
19
CrossRef citations to date
0
Altmetric
Articles

Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application

, &
Pages 2576-2591 | Received 17 Jul 2012, Accepted 31 Jul 2013, Published online: 26 Nov 2013
 

Abstract

This work addresses the joint scheduling of continuous caster and hot strip mill processes in the steel industry. Traditionally, slab yards are used to decouple these two stages. However, the rising importance of energy costs and reduced logistic effort gives motivation for a combined scheduling. For each of the processes, a mixed-integer linear optimisation model based on the block planning principle is presented. This approach develops production schedules that take technological sequences of steel grades and milling programmes into account. We consider the integrated steel plant of an international steel company as a case study. Numerical results demonstrate the practicability of this approach under experimental conditions, which reflect typical settings from an industrial application in the steel industry.

Log in via your institution

Log in to Taylor & Francis Online

PDF download + Online access

  • 48 hours access to article PDF & online version
  • Article PDF can be downloaded
  • Article PDF can be printed
USD 61.00 Add to cart

Issue Purchase

  • 30 days online access to complete issue
  • Article PDFs can be downloaded
  • Article PDFs can be printed
USD 973.00 Add to cart

* Local tax will be added as applicable

Related Research

People also read lists articles that other readers of this article have read.

Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.

Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.