614
Views
19
CrossRef citations to date
0
Altmetric
Articles

Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application

, &
Pages 2576-2591 | Received 17 Jul 2012, Accepted 31 Jul 2013, Published online: 26 Nov 2013

References

  • Bellabdaoui, A., and J. Teghem. 2006. “A Mixed-integer Linear Programming Model for the Continuous Casting Planning.” International Journal of Production Economics 104 (2): 260–270.
  • Bilgen, B., and H.-O. Günther. 2010. “Integrated Production and Distribution Planning in the Fast Moving Consumer Goods Industry: A Block Planning Application.” OR Spectrum 32 (4): 927–955.
  • Box, R. E., and D. G. Herbe Jr. 1988. “A Scheduling Model for LTV Steels Cleveland Works Twin Strand Continuous Slab Caster.” Interfaces 18 (1): 42–56.
  • Chen, A. L., G. K. Yang, and Z. M. Wu. 2008. “Production Scheduling Optimization Algorithm for the Hot Rolling Processes.” International Journal of Production Research 46 (7): 1955–1973.
  • Cowling, P. 2003. “A Flexible Decision Support System for Steel Hot Rolling Mill Scheduling.” Computers & Industrial Engineering 45 (2): 307–321.
  • Cowling, P., D. Ouelhadj, and S. Petrovic. 2004. “Dynamic Scheduling of Steel Casting and Milling Using Multi-agents.” Production Planning & Control 15 (2): 178–188.
  • Cowling, P., and W. Rezig. 2000. “Integration of Continuous Caster and Hot Strip Mill Planning for Steel Production.” Journal of Scheduling 3 (4): 185–208.
  • Dawande, M., J. Kalagnanam, L. Ho Soo, C. Reddy, S. Siegel, and M. Trumbo. 2004. “The Slab-design Problem in the Steel Industry.” Interfaces 34 (3): 215–225.
  • Dong, H., M. Huang, W. H. Ip, and X. Wang. 2010. “On the Integrated Charge Planning with Flexible Jobs in Primary Steelmaking Processes.” International Journal of Production Research 48 (21): 6499–6535.
  • Dong, H., M. Huang, W. H. Ip, and X. Wang. 2012. “Improved Variable Neighbourhood Search for Integrated Tundish Planning in Primary Steelmaking Processes.” International Journal of Production Research 50 (20): 5747–5761.
  • EU ETS (EU Emissions Trading Scheme). 2012. Accessed June 10. http://ec.europa.eu/clima/policies/ets/index_en.htm.
  • Farahani, P., M. Grunow, and H.-O. Günther. 2012. “Integrated Production and Distribution Planning for Perishable Food Products.” Flexible Services and Manufacturing 24 (1): 28–51.
  • Günther, H. O., M. Grunow, and U. Neuhaus. 2006. “Realizing Block Planning Concepts in Make-and-pack Production Using MILP Modelling and SAP APO ©.” International Journal of Production Research 44 (18/19): 3711–3726.
  • Hax, A. C., and H. C. Meal. 1975. “Hierarchical Integration of Production Planning and Scheduling.” In Studies in the Management Sciences, Vol. 1 Logistics, edited by M. A. Geisler, 53–69. New York: North Holland-American Elsevier.
  • Jans, R., and Z. Degraeve. 2008. “Modeling Industrial Lot Sizing Problems: A Review.” International Journal of Production Research 46 (6): 1619–1643.
  • Kosiba, E. D., J. R. Wright, and A. E. Cobbs. 1992. “Discrete Event Sequencing as a Traveling Salesman Problem.” Computers in Industry 19 (3): 317–327.
  • Lopez, L., M. W. Carter, and M. Gendreau. 1998. “The Hot Strip Mill Production Scheduling Problem: a Tabu Search Approach.” European Journal of Operational Research 160 (2/3): 317–335.
  • Lütke Entrup, M., H.-O. Günther, P. van Beek, M. Grunow, and T. Seiler. 2005. “Mixed-integer Linear Programming Approaches to Shelf-life-integrated Planning and Scheduling in Yoghurt Production.” International Journal of Production Research 43 (23): 5071–5100.
  • Missbauer, H., W. Hauber, and W. Stadler. 2009. “A Scheduling System for the Steelmaking-continuous Casting Process. A Case Study from the Steel-making Industry.” International Journal of Production Research 47 (15): 4147–4172.
  • Petersen, C. M., K. L. Soerensen, and R. V. V. Vidal. 1992. “Inter-process Synchronization in Steel Production.” International Journal of Production Research 30 (6): 1415–1425.
  • Shamanian, M., and A. Najafizadeh. 2004. “Hot Charge of Continuously Cast Slabs in Reheating Furnaces.” International Journal of ISSI 1 (1): 35–37.
  • Tang, L., J. Liu, A. Rong, and Z. Yang. 2000a. “A Mathematical Programming Model for Scheduling Steelmaking-continuous Casting Production.” European Journal of Operational Research 120 (2): 423–435.
  • Tang, L., J. Liu, A. Rong, and Z. Yang. 2000b. “A Multiple Traveling Salesman Problem Model for Hot Rolling Scheduling in Shanghai Baoshan Iron & Steel Complex.” European Journal of Operational Research 124 (2): 267–282.
  • Tang, L., J. Liu, A. Rong, and Z. Yang. 2001. “A Review of Planning and Scheduling Systems and Methods for Integrated Steel Production.” European Journal of Operational Research 133 (1): 1–20.
  • Tang, L., P. B. Luh, J. Liu, and L. Fang. 2002. “Steel-making Process Scheduling Using Lagrangian Relaxation.” International Journal of Production Research 40 (1): 55–70.
  • Tang, L., and G. Wang. 2008. “Decision Support System for the Batching Problems of Steelmaking and Continuous-casting Production.” Omega 36 (6): 976–991.
  • Vonderembse, M. A., and R. W. Haessler. 1982. “A Mathematical Programming Approach to Schedule Master Slab Casters in the Steel Industry.” Management Science 28 (12): 1450–1461.
  • Wachter, J. C. 2011. A Simulation Study Aimed at the Increase of Hot Charging and Average Charging Temperature at the Hot Strip Mill of Tata Steel Ijmuiden by Using Hot Boxes. School of Management and Governance, University of Twente: Enschede, The Netherlands.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.