Abstract
This paper aims to propose an accurate and quick assembly time estimation method using the modular arrangement of predetermined time standards in the product design stage. It describes a classification of 2382 assembly operations that are incurred in manually assembling consumer electronics such as air conditioners, washing machines and refrigerators, and a method of choosing representative motions comprising work elements by examining the frequency distribution of the assembly operation’s motions. It then presents criteria for assigning time values associated with the movement of the representative motions using the design factors employed in design for assembly and the layout factors of an assembly line. A case study then presents the practicality of the method, the statistical results of which indicate that the proposed method would be accurate enough for practical purposes.