719
Views
0
CrossRef citations to date
0
Altmetric
Construction Management

Trust or fairness is more important:research on the mechanism of contract risk allocation inducing contractor to consummate performance behavior

, &
Pages 2946-2958 | Received 22 May 2021, Accepted 19 Jan 2023, Published online: 02 Feb 2023

Figures & data

Figure 1. The research scope and procedure.

Figure 1. The research scope and procedure.

Figure 2. Conceptual framework.

Figure 2. Conceptual framework.

Table 1. Characteristics of respondents.

Table 2. Items of measurement and reliability and validity analysis.

Table 3. Correlation matrix and the square root of AVE of factors.

Table 4. Cross loadings for individual measurement items.

Figure 3. Graphical representation of path coefficient and inspection results.

Figure 3. Graphical representation of path coefficient and inspection results.

Table 5. Path coefficient and inspection results.

Data availability statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request ([email protected]).