Critical risk factors of public building green retrofit projects- an empirical study in Chongqing, China

, &
Received 30 May 2023, Accepted 30 Oct 2023, Published online: 18 Nov 2023

Figures & data

Figure 1. The flowchart of the proposed Choquet integral FMEA method.

Figure 1. The flowchart of the proposed Choquet integral FMEA method.

Table 1. Risk factors of green retrofit projects in public buildings.

Table 2. Risk assessment level and triangular fuzzy number.

Table 3. Background information of experts.

Table 4. Weights of the parameters in the case study.

Table 5. Results of RPN calculation.