Figures & data
Table 1. Articles obtained from Journal Databases.
Table 2. Dichotomous explanations for cost overruns in public projects.
Hall P. 1980. Great planning disasters: what lesson do they hold? Futures. 12(1):45–50. Wachs M. 1989. When planners lie with numbers. J Am Plann Assoc. 55(4):476–479. Morris S. 1990. Cost and time overruns in public sector projects. Econ Polit Weekly. 47:154–168. Kain FN. 1990. Deception in Dallas: strategic misrepresentation in rail transit promotion and evaluation. J Am Plann Assoc. 56(2):184–196. Flyvbjerg B, Skamris Holm MK, Buhl SL. 2002. Underestimating cost in public works. Error or lie? J Am Plann Assoc. 68(3):279–295. Ganuza J. 2003. Competition and cost overruns in procurement. Barcelona: Barcelona Economics. Working Paper No. 1.07. Trost SM, Oberlender GD. 2003. Predicting the accuracy of early cost estimates using factor analysis and multivariate regression. J Constr Eng Manage. 129 (2):198–204. Attala M, Hegazy T. 2003. Predicting cost deviation in reconstruction projects: artificial Networks versus Regression. J Constr Eng Manag. 129(4):25–31. Flyvbjerg B, Skamris Holm MK, Buhl SL. 2004. What causes cost overrun in transport infrastructure projects? Transp Rev. 24(1):3–18. Odeck J. 2004. Cost overruns in road construction: what are their sizes and determinants. ? J Transp Policy. 11(1):43–53. Baccarini D. 2004. Accuracy in estimating project cost construction contingency - a statistical analysis. RICS International Construction Conference. Responding to Change, 7-8 September. Headingley Stadium, UK. Sodikov J. 2005. Cost estimation of highway projects in developing countries: an artificial neural network approach. J East Asia Soc Transp Stud. 6:1036–1047. Flyvbjerg B, Garbuio M, Lovall D. 2009. Delusion and deception in large infrastructure projects: two models for explaining and preventing executive disaster. Calif Manag Rev. 51(2):170–193. Love PED, Edwards DJ, Smith J, Walker DHT. 2009. Divergence or congruence: a path model of re-work for building and civil engineering projects. J Perform Constr Facil. 23(6):480–488. Cantarelli CC, Flyvbjerg B, Molin EJE, Van Wee B. 2010b. Lock-in and its influence on the project performance of large-scale transportation infrastructure projects. Investigating how lock-in can emerge and affect cost overruns. Environ Plann B. 37(5):792–807. Love PED, Edwards DJ, Irani Z. 2012. Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure overruns. IEEE Trans Eng Manag. 59(4):560–571. Cantarelli CC, Flyvbjerg B, Buhl SL. 2012. Geographical variation in project cost performance: the Netherlands versus worldwide. J Transp Geogr. 24:324–331. Gil N, Lundriganm C. 2012. The Leadership and governance of megaprojects, Centre for Infrastructure Development (CID). Manchester: The University of Manchester. Report No. 3/2012. Cantarelli CC, Chorus CG, Cunningham SW. 2013. Explaining cost overruns of large-scale transportation infrastructure projects using a signaling game. Transportmetrica A Transp Sci. 9(3):239–258. Flyvbjerg B. 2014. What you should know about megaprojects and why: an overview. Proj Manag J. 45(2):6–19. Sarmento JM. Reeneboog L. 2017. Cost overruns in public sector investment projects. Publ Works Manag Policy. 22(2):140–164. Amadi AI, Higham A. 2017. Latent geotechnical pathogens inducing cost overruns in highway projects. JFMPC. 22(3):269–285. Odeck J. 2019. Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature. Transportation. 46(4):1345–1368. Love PED, Irani Z, Smith J, Regan M, Liu H. 2017. Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Prod Plann Contr. 28(13):1081–1092. Amadi AI, Higham A. 2018a. Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism. Constr Manag Econ. 37(4):217–237. Amadi AI, Higham A. 2018b. Cognitive mapping of geotechnical practices as cost overrun drivers in highway projects. EPOJ. 8(1):65–86. Love PED, Edwards DJ, Irani Z. 2008. Forensic project management: an exploratory examination of the causal behavior of design-induced rework. IEEE Trans Eng Manag. 55(2):234–247. Amadi AI, Higham A. 2018c. The trickle-down effect of psycho-social constructs and knowledge deficiencies as organizational barriers to cost performance on highway projects. JFMPC. 23(1):57–72. Hinterleitner M. 2019. Salami tactics and the implementation of large-scale public projects. J Eur Publ Policy. 26(11):1696–1714. Cavalieri M, Cristaudo R, Guccio C. 2019. On the magnitude of cost overruns throughout the project life cycle. An assessment for Italian transportation infrastructure projects. Transp Policy. 79(c):21–36. El-Kholy AM. 2019. Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. Int J Constr Manag. 1–19. DOI: 10.1080/15623599.2019.1580001. Catalão FP, Cruz CO, Sarmento JM. 2019. Exogenous determinants of cost deviations and overruns in local infrastructure projects. Constr Manag Econ. 37(12):697–711. Asamoah RO, Baiden BK, Nani G, Kissi S. 2019. Review of exogenous economic indicators influencing construction industry. Adv Civ Eng. 2019:1–8. Annamalaisami CD, Kuppuswamy A. 2019. Reckoning construction cost overruns in building projects through methodological consequences. Int J Constr Manag. DOI: 10.1080/15623599.2019.1683689. Heravi G, Mohammadian M. 2019. Investigating cost overruns and delay in urban construction projects in Iran. Int J Constr Manag. 1–11. DOI: 10.10180/13501763.2018.1544654. Amadi AI. 2016. Explaining cost overruns in highway projects: geospatial regression modelling and cognitive mapping of latent pathogens and contextual drivers [an unpublished dissertation]. Salford: University of Salford.