Figures & data
Table 1. Literature assessed relevant to the key areas of configuration information in construction projects.
Table 2. Presentation of the survey questions including response alternatives.
Figure 4. Completeness of the necessary configuration information flow between the construction phases, according to the respondents.
![Figure 4. Completeness of the necessary configuration information flow between the construction phases, according to the respondents.](/cms/asset/56e4948c-5f4b-4fd4-aadc-7c336fea0276/tibi_a_1785831_f0004_ob.jpg)
Figure 6. Conceptual model for systematic configuration information with the key areas as headings and the information relevant in construction projects below. The arrows represent the interrelationship between the key areas.
![Figure 6. Conceptual model for systematic configuration information with the key areas as headings and the information relevant in construction projects below. The arrows represent the interrelationship between the key areas.](/cms/asset/72d74007-4425-47c6-b466-20d876d6c863/tibi_a_1785831_f0006_ob.jpg)