Abstract
This work addresses the joint scheduling of continuous caster and hot strip mill processes in the steel industry. Traditionally, slab yards are used to decouple these two stages. However, the rising importance of energy costs and reduced logistic effort gives motivation for a combined scheduling. For each of the processes, a mixed-integer linear optimisation model based on the block planning principle is presented. This approach develops production schedules that take technological sequences of steel grades and milling programmes into account. We consider the integrated steel plant of an international steel company as a case study. Numerical results demonstrate the practicability of this approach under experimental conditions, which reflect typical settings from an industrial application in the steel industry.