84
Views
14
CrossRef citations to date
0
Altmetric
ORIGINAL ARTICLES

Inspection allocation for multistage deteriorating production systems

&
Pages 1031-1041 | Received 01 Nov 2000, Accepted 01 Dec 2001, Published online: 17 Apr 2007
 

Abstract

The paper deals with the layout and operation of an inspection system used for detecting malfunctioning processors in a multistage production system. This problem involves three inter-related decisions: (i) the overall inspection capacity; (ii) the assignment of inspection tasks to inspectors; and (iii) the scheduling of the inspector's tasks. These decisions require a trade-off between the cost of inspectors and the loss associated with non-conforming products. A hierarchical heuristic solution procedure is proposed to support these three related decisions. Numerical experiments demonstrate the performance of the heuristic, showing that solution criteria are very close to their lower bounds. Although we use production terminology, the results might be applicable to any organization, which inspects and maintains a variety of characteristics of its branches or activities.

Notes

Corresponding author

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.