In semiconductor manufacturing, wafer fabrication is the most complicated and important process, and is composed of several hundred process steps and involves several hundred machines. The productivity of the manufacturing process depends mainly on controlling the balance of WIP (work-inprogress) flow to achieve maximum throughput under short manufacturing cycle times. This paper discusses how to determine the proper WIP level for operations, against which balance status can be measured. Balance measurement can be applied in mathematical modelling for bottleneck scheduling and operations management of the fabrication line. Performances are evaluated through computational experiments to show that balance driven management leads to 15-33% more production in 21% shorter manufacturing cycle time than production driven management.
Manufacturing cycle time reduction using balance control in the semiconductor fabrication line
Reprints and Corporate Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
To request a reprint or corporate permissions for this article, please click on the relevant link below:
Academic Permissions
Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?
Obtain permissions instantly via Rightslink by clicking on the button below:
If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.
Related Research Data
Related research
People also read lists articles that other readers of this article have read.
Recommended articles lists articles that we recommend and is powered by our AI driven recommendation engine.
Cited by lists all citing articles based on Crossref citations.
Articles with the Crossref icon will open in a new tab.