References
- Bitran , G. R. and Tirupati , D. 1988 . Development and implementation of a scheduling system for a wafer fabrication facility . Operations Research , 36 : 377 – 395 .
- Chaoyang , L. , Weidong , L. and Souza , R. D. The dynamics of semiconductor line and cycle time . The Proceedings of International Conference Operational Modeling and Simulation . San Francisco. pp. 139 – 143 .
- Demeester , L. and Tang , C. 1996 . Reducing cycle rime at an IBM wafer fabrication facility . Interfaces , 26 : 34 – 49 .
- Ehteshami , B. , Petrakian , R. G. and Shabe , P. M. 1992 . Trade-offs in cycle time management: hot lots . IEEE Transactions on Semiconductor Manufacturing , 5 : 101 – 106 .
- Glassey , P. G. 1990 . A comparison of release rules using BLOCS/M simulations , ESRC Report 90-15
- Glassey , C. R. and Resende , M. G. C. 1988a . Closed-loop job release control for VSLI circuit manufacturing . IEEE Transactions on Semiconductor Manufacturing , 1 : 36 – 46 .
- Glassey , C. R. and Resende , M. G. C. 1988b . A scheduling rule for job release in semiconductor fabrication . Operations Research Letters , 7 : 213 – 217 .
- Kim , S. , Yea , S. and Kim , B. Stepper scheduling in semiconductor wafer fabrication process . The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing . Arizona. pp. 157 – 162 .
- Kim , H. , Kim , Y. and Kim , J. Batching and scheduling at batch processing workstation in a semiconductor fabrication facility producing multiple product types with distinct due dates . The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing . Arizona. pp. 151 – 156 .
- Kraft , C. 1993 . Dynamic kanban semiconductor inventory management system , Texas instruments Inc. . Technical Paper
- Leachtman , R. C. 1994 . The competitive semiconductor manufacturing survey: Second report on results of the main phase , Berkeley : University of California . CSM-08 Report
- Lee , Y. H. , Bhaskaran , K. and Pinedo , M. 1997 . A heuristic to minimize the total weighted tardiness with sequencedependent setups . HE Transactions , 29 : 45 – 52 .
- Lee , Y. H. , Park , J. and Kim , S. 2002 . Experimental study on input and bottleneck scheduling for the semiconductor fabrication line . HE Transactions , 34 : 179 – 190 .
- Morrison , J. , Janakiram , M. and Kuirar , P. R. A comparative study of scheduling policies at Motorola fabs . The Proceedings of International Conference on Semiconductor Manufacturing Operational Modeling and Simulation . San Francisco. pp. 51 – 56 .
- Pierce , N. G. and Yurtsever , T. Dynamic dispatch and graphical monitoring system . The Proceedings of International Conference on Semiconductor Manufacturing Operational Modeling and Simulation . San Francisco. pp. 57 – 61 .
- Pierce , N. F. and Yurtsever , T. Value-based dispatching for semiconductor wafer fabrication . The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing . Arizona. pp. 172 – 176 .
- Robinson , J. and Chance , F. Wafer fabrication cycle time management using MES data . The Proceedings of International Conference on Modeling and Analysis of Semiconductor Manufacturing . Arizona. pp. 183 – 187 .
- Rose , O. Estimation of the cycle time distribution of a wafer fab by a simple simulation model . The Proceedings of International Conference on Semiconductor Manufacturing Operational Modeling and Simulation . San Francisco. pp. 133 – 138 .
- Spearman , M. L. , Woodruff , D. L. and Hopp , W. J. 1990 . CONWIP: A pull alternative to kanban . International Journal of Production Research , 28 : 879 – 894 .
- Uzsoy , R. , Lee , C. Y. and Martin-Vega , L. A. 1992 . A review of production planning and scheduling models in the semiconductor industry, Part I: system characteristics, performance evaluation, and production planning . IIE Transactions , 24 : 47 – 60 .
- Uzsoy , R. , Lee , C. Y. and Martin-Vega , L. A. 1994 . A review of production planning and scheduling models in the semiconductor industry, Part II: shop-floor control . IIE Transactions , 26 : 44 – 55 .
- Wein , L. M. 1988 . Scheduling semiconductor wafer fabrication . IEEE Transactions on Semiconductor Manufacturing , 1 : 115 – 129 .
- Wein , L. M. 1992 . On the relationship between yield and cycle time in semiconductor wafter fabrication . IEEE Transactions on Semiconductor Manufacturing , 5 : 156 – 158 .