Article title: “Infrastructure investments and operating costs for fecal sludge and sewage treatment systems in Kampala, Uganda”
Authors: J. McConville, E. Kvarnström, J. M. Maiteki and C. B. Niwagaba
Journal: Urban Water Journal
Bibliometrics: Volume 16, Number 8, pages 537–607
DOI: 10.1080/1573062X.2019.1700290
When the above article was published online and in print, two cost posts were incorrectly placed. The original publication stated the annual operating costs for collection & conveyance in the sewage regime as zero. The correct cost is -39,26. The original table included this cost in the annual operating costs for the treatment plan, thus the total costs remain the same, but the operating costs for the treatment plant should be reduced. It should be -34,55 instead of -73,64. Figure 3 in the paper is based on these costs and thus, also was updated along with the supplementary material.
This article is available both online and in print. The online version has been corrected.