References
- GordonVProthJMChuCA survey of the state-of-the-art of common due-date assignment and scheduling researchEur J Opl Res200213512510.1016/S0377-2217(01)00181-3
- HallNGPosnerMEEarliness-tardiness scheduling problems. I: Weighted deviation of completion times about a common due dateOpl Res19913983684610.1287/opre.39.5.836
- JaniakAKovalyovMYMarekMSoft due window assignment and scheduling on parallel machinesIEEE T Syst Man Cyb :A20073761462010.1109/TSMCA.2007.893485
- Janiak A and Winczaszek M (2004). A single processor scheduling problem with a common due window assignment. In: Fleuren H, den Hertog D and Kort P (eds), Operations Research Proceedings, pp. 213–220.
- JaniakAWinczaszekMCommon due window assignment in parallel processor scheduling problem with nonlinear penalty functionsLect Notes Comput Sci2006391113213910.1007/11752578_17
- LimanSDPanwalkarSSThongmeeSDetermination of common due window location in a single machine scheduling problemEur J Opl Res199693687410.1016/0377-2217(95)00181-6
- LimanSDPanwalkarSSThongmeeSCommon due window size and location determination in a single machine scheduling problemJ Opl Res Soc1998491007101010.1057/palgrave.jors.2600601
- MosheiovGOronDDue-window assignment with unit processing-time jobsNav Res Log2004511005101710.1002/nav.20039
- MosheiovGYovelUMinimizing weighted earliness-tardiness and due-date cost with unit processing-time jobsEur J Opl Res200617252854410.1016/j.ejor.2004.10.021
- WengMXVenturaJAA note on ‘common due-window scheduling'Prod Opl Mngt1996519420010.1111/j.1937-5956.1996.tb00393.x