28
Views
2
CrossRef citations to date
0
Altmetric
Theoretical Paper

Capacity planning with sequential time constraints under various control policies in the back-end of wafer fabrications

&
Pages 1258-1264 | Received 01 Feb 2008, Accepted 01 Jan 2009, Published online: 21 Dec 2017

References

  • Andersson M and Olsson G ( 1998 ). A simulation based decision support approach for operational capacity planning in a customer order driven assembly line . In : Medeiros DJ (ed) Proceedings of the 1998 Winter simulation Conference, Vol. 2 . Society for Computer Simulation International: San Diego, CA, pp 935–941 .
  • ChenHHarrisonJMMandelbaumAVan AckereAWeinLMEmpirical evaluation of a queuing network model for semiconductor wafer fabricationOpns Res19883620221510.1287/opre.36.2.202
  • ChristieRMEWuSDSemiconductor capacity planning: Stochastic modeling and computational studiesIIE Trans2002342131143
  • ChungSSHuangHWCycle time estimation for wafer fab with engineering lotsIIE Trans200234105118
  • ConnorsDPFeiginGEYaoDDA queueing network model for semiconductor manufacturingIEEE T Semiconduct M1996941242710.1109/66.536112
  • HoppWJSpearmanMLFactory Physics1996
  • HungYFLeachmanRCA production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculationsIEEE T Semiconduct M1996925726910.1109/66.492820
  • LeachmanRCCarmonTOn capacity modeling for production planning with alternative machine typesIIE Trans1992244627210.1080/07408179208964234
  • LouwLPageDCQueuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systemsInt J Prod Res2004421207122610.1080/2007540310001631593
  • MitranyILAvi-ItzhakBA many-server queue with service interruptionsOpns Res19681662863810.1287/opre.16.3.628
  • Robinson JK and Giglio R ( 1999 ). Capacity planning for semiconductor wafer fabrication with time constraints between operations . In : Farrington PA (ed) Proceedings of 1999 Winter Simulation Conference, Vol. 1 . IEEE: Piscataway, NJ, pp 880–887 .
  • Schoemig AK ( 1999 ). On the corrupting influence of variability in semiconductor manufacturing . In : Farrington PA (ed) Proceedings of 1999 Winter Simulation Conference, Vol. 1 . IEEE: Piscataway, NJ, pp 837–842 .
  • TuYMLiouCSCapacity determination model with time constraints and batch processing in semiconductor wafer fabricationJ Chin Inst Indust Eng2006233192199
  • UzsoyRLeeCYLouisAMA review of production planning and scheduling models in the semiconductor industry part 1: System characteristics, performance evaluation and production planningIIE Trans1992244476010.1080/07408179208964233
  • WhittWThe queueing network analyzerAT & T Tech J19986227792815
  • WhittWApproximations for the GI/G/m queueProd Opns Mngt19992114161
  • WuSDErkocMKarabukSManaging capacity in the high-tech industry: A review of literatureEng Econ200550212515810.1080/00137910590949887

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.