References
- ChengTCEDingQLinBMTA concise survey of scheduling with time-dependent processing timesEur J Opl Res200415211310.1016/S0377-2217(02)00909-8
- KubzinMAStrusevichVAPlanning machine maintenance in two-machine shop schedulingOpns Res20065478980010.1287/opre.1060.0301
- KuhnHWThe Hungarian method for the assignment problemNav Res Logist Quart19552839710.1002/nav.3800020109
- LeeC-YMachine scheduling with availability constraintsHandbook of Scheduling2004
- LeeC-YChenZ-LScheduling jobs and maintenance activities on parallel machinesNav Res Logist20004714516510.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
- LeeC-LLeonVJMachine scheduling with a rate-modifying activityEur J Opl Res200112911912810.1016/S0377-2217(99)00066-1
- MooreJMAn n job, one machine sequencing algorithm for minimizing the number of late jobsMngt Sci19681510210910.1287/mnsc.15.1.102
- MosheiovGSidneyJNew results on sequencing with rate modificationINFOR200341155163
- PanwalkarSSSmithMLSeidmannACommon due-date assignment to minimize total penalty for the one machine scheduling problemOpns Res19823039139910.1287/opre.30.2.391